Rotating Tungsten Helium cooled Target RoTHeTa Cyril Kharoua Daniela Ene, Ferenc Mezei, Etam Noah, François Plewinski, Pascal Sabbagh, Luca Massidda (CRS4,

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Ottone Caretta & Chris Densham Technology Business Unit Rutherford Appleton Laboratory A new idea for NuFact targets and beam dumps BENE Nov 06 – Frascati,
Radiopharmaceutical Production Target Foil Characteristics STOP.
Chapter 3.2: Heat Exchanger Analysis Using -NTU method
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
PAUL SCHERRER INSTITUT HPTW Malmö Cannelloni Technical Issues K. Thomsen.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Solid Targets for the Neutrino Factory J R J Bennett Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Radiation Effects in a Couple Solid Spallation Target Materials S.A. Maloy, W. F. Sommer, M.R. James, T.J. Romero, M.L. Lopez Los Alamos National Laboratory,
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
The JPARC Neutrino Target
Scoping Study of He-cooled Porous Media for ARIES-CS Divertor Presented by John Pulsifer Major contributor: René Raffray University of California, San.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
Radiation Cooling of the ILC positron target LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, DESY, Peter Sievers, CERN/ESS, Andriy Ushakov,
ISIS Second Target Station
Proton Accelerators for Science and Innovation Workshop at Fermilab
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
1 cm diameter tungsten target Goran Skoro University of Sheffield.
Study of a new high power spallation target concept
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
Summary Why consider a packed bed as a high power target?
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
3 May th High Power Targetry Workshop - Malmö1/25 Free Surface and Splashing Simulation of a Windowless Target Concept for ESS Luca Massidda, Vincent.
AAE 450 – Spacecraft Design Sam Rodkey 1 Active Thermal Control Design Sam Rodkey March 1 st, 2005 Project Management Project Manager.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
New nTOF target: Design Issues
POSIPOL 2016 at LAL/Paris, Sept Peter Sievers-CERN
ISIS TS1 Project: Target Design and Analysis
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
DCLL TBM Reference Design
Skeleton contributions to targets section
Tungsten Powder Test at HiRadMat Scientific Motivation
Beam Window Studies for Superbeams
STUDIES TOWARDS TARGET-HORN INTEGRATION Institute of Applied Mechanics
EUROnu Beam Window Studies Stress and Cooling Analysis
Overview of mechanical design & construction
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

Rotating Tungsten Helium cooled Target RoTHeTa Cyril Kharoua Daniela Ene, Ferenc Mezei, Etam Noah, François Plewinski, Pascal Sabbagh, Luca Massidda (CRS4, Sardinia) Peter Sievers (retired from CERN) Fernando Sordo (ESS-Bilbao) 4 th High Power Targetry Workshop Malmö

Outline  Some history  Practical motivation for Helium cooling  Practical motivation for Granular Target  Practical motivation for Rotating Target  Main parameters of the RoTHeTa  Neutronic performance  Thermo-Mechanical study  Loop characteristics  Rotating seal  Maintenance  Lifetime  Conclusion

Page 3 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Some history  Granular Tungsten target helium cooled was first proposed by Peter Sievers for a MW neutrino factory  First we have considered spheres in a stationary target  Optimum configuration for cooling, thermal shock and thermal stress  Heavy cooling requirements (High Pressure!) Under the ESS condition a rotating wheel, fitted with tungsten rods and cooled with helium is a viable solution…

Page 4 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Practical Motivation for Helium Cooling  Objectives: Avoid Liquid metal technology Avoid Water cooling / corrosion issue related to tungsten target and therefore avoid cladding  Advantages: Known technology Low activity in the cooling fluid Leak tightness  Drawbacks: Pressurized gas equipment (3-10bar) Leak tightness

Page 5 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Practical Motivation for Granular Target  Objectives: Allows cooling fluid to remove heat within the target (directly where it is deposited)  Advantages: High density target (75% to 90% of pure tungsten) No thermal shock and low stress level Flexible target material (choice, arrangement, geometry…)

Page 6 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Practical Motivation for a Rotating Target  Objectives: Increase lifetime (window, tungsten…) Alleviate the heat removal  Advantages: Dilution of specific activity and after heat Less frequent maintenance and handling of radioactive material Solid waste Upgradeable for higher beam power  Drawbacks: Not yet proven concept (but we do not need to re-invent the wheel!) Rotating seals to be adapted from existing solutions Heavy assembly

Page 7 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Main Parameters of the Helium Cooled Rotating Granular Target  A 2.5GeV elliptic Gaussian beam with an RMS of  x = 5 cm and  y = 1.5 cm (beam footprint at 4  of 20cm x 6cm), an average power of 5 MW, pulsed at 20 Hz  The wheel is rotating at 30RPM (0.5Hz)  The energy deposition calculated with FLUKA gave a maximum Power density (time average for 1/40 of the wheel) of 75W/cm 3 (40 times less than in the static target case).  External wheel diameter is150 cm and internal diameter of 50 cm. The helium is blown over the total surface continuously.  Initially rods of 2cm diameter, now 1cm diameter

Page 8 Cyril Kharoua – 4 th HPTW – Malmö – May Brightness at 5 MeV (left) and at 10 MeV (right) on the moderator surface for a 1ms pulse length. Neutronic performance The rotating target made of rod cooled by helium will allow a density of 90% of the raw material, which shall give a performance close to the pure tungsten configuration. courtesy F. Sordo et al.

Page 9 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Neutronic performance  Franz Gallmeier investigation (previous TSCS meeting) extended Rotating target configuration (run though optimization loop) Extrapolation with density (not so accurate) Tungsten is the most favourable target material, and its dilution is not affecting significantly the neutron production Element Effective density Φ Comment (1/cm 3 )(n/cm 2 /prot.) Perf in % vs. Best Loss in % vs. Best W E %0.00%Calculated Sphere pure W145.66E %9.93%Calculated Sphere Densimet (*) E %10.74%Educated guess Rods Densimet (*) E %3.53%Educated guess *DENSIMET is a tungsten alloy with appropriate properties courtesy F. Gallmeier

Page 10 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Thermo-mechanical study 2cm Rods With a He-cooling circuit set at: Po = 10 Bar, v(He) 8 m.s - 1 (mass flow of about 20kg/s!!! Which could reduced by tuning it for different zones) The peak temperature in the hottest rods is about 577°C (Inlet Temperature was 200°C) Helium ∆T bulk =30K Stress in the rods is low even in a fatigue regime (endurance), about 30 to 50 MPa

Page 11 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Thermo-mechanical study He in inlet is at 200°C and exit at about 230°C Pressure drop is about 0.2bar and Pumping power about 250kW Helium Inlet Helium Outlet Rotation axis

Page 12 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Thermo-mechanical study 1cm Rods With a more moderate He-cooling circuit (Po = 3 Bar, inlet v(He) of 4 m.s-1, mass flow of 3kg/s) The peak temperature in the hottest rods is about 485°C Helium ∆T bulk = 200K Stress in the rods is very low even in a fatigue regime (endurance), about 10 to 20 Mpa

Page 13 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 For 3kg/s mass flow rate for 3 bar He Here the pressure drop is 0.1bar equivalent to 62kW of pumping power. Thermo-mechanical study 1cm Rods

Page 14 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Cross flow configuration 14 H2H2 No contact labyrinth (Pump outside) He:  0.3 m 3,  10 bar He:  5 m 3, > 1 bar H2OH2O W Containment with flange connection of target trolley & utilities p

Page 15 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Thermo-mechanical study Cross flow configuration 15  Transverse cross flow is under estimation  The objective is to use a lower mass flow rates and increase the bulk ∆T in Helium  First estimation show the possibility to consider 2cm rods with 1mm gap (82%of the full W density). Mass flow rates is about 3kg/s ∆T bulk =200K T max in He =310°C ∆P≈1bar (VDI WärmeAtlas)

Page 16 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Helium loop Pressure drop estimation  The main component of the loop to be considered for the overall pressure head required at the pump are: The target material (see previous slides) The target shaft and other straight pipe (Half of the target) The Inlet rotating seals and outlet rotating seals The filters (Half of the target) The heat exchanger (Half of the target)  The Inlet and Outlet rotating seals could be assumed to have the same pressure drop  The Heat exchanger could be assumed to have half of the pressure drop seen in the target material

Page 17 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Helium loop Pressure drop estimation Pressure drop [bar] The target material 0.1 The target shaft and other straight pipe 0.05 The Inlet rotating seals 0.1 The outlet rotating seals 0.1 The filters 0.05 The heat exchanger Total Pumping Power kW Preliminary estimation A preliminary assessment could give indication of the pressure drop in the main component of the loop, for Helium flowing at 3kg/s and 3bar for a global volume of 2m 3

Page 18 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Helium Loop and ancillaries loop

Page 19 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Leak in Rotating Seals  Differential pumping seal with chicanes between 3 bar and atmospheric pressure.  For 0.1mm wide and 50cm long path => at most 2g/s Pumping of the leak occurs in the last chicane

Page 20 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Structural analysis  Structural analysis Simplified shell model (sector) Parameterized model (number of ribs, thickness) No thermal loads defined, but gravity, pressure (3bar), rotational velocity Simplified post-processing using RCC-MRx criteria

Page 21 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Structural analysis  The table here summarize the ratio between the acceptable limit (according to RCC-MRx criteria) and the calculated stress.  At 3bar with ribs every 12degree, the minimum thickness of material could be 3mm.  If the pressure can be further reduced, the number of needed ribs (or shell thickness) will be reduced Angle between 2 ribs Thickness (mm)

Page 22 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Maintenance / Layout

Page 23 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Maintenance / Layout

Page 24 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Maintenance / Layout  Exchange procedure: a proposal  Hot cell could be separated from the target station / monolith allowing an operation of it more disconnected from the target operation  In order to reduce the weight carried by the overhead crane the flask is moved on rails  Basic maintenance is performed on helium circuit (rotating seal, filters, pumps, heat exchanger) by hands on it. The exposure to radiation shall be low.

Page 25 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Lifetime  The lifetime of such target is supposed to be about 40 times longer than the static target As radiation damage will be spread over a large surface/volume Fatigue is negligible in the first estimation (non irradiated)

Page 26 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Conclusion  3bar of pressure seems a viable option with 1cm rods, but further study shall be carried on to confirm and determine the minimum pressure acceptable  Neutron yield is optimum  Some of the main challenges lie in the replacement of the target and its associated downtime  Attention has to be paid to local leak and radioactive release  Special attention has to be paid to the rotating seal

Page 27 Cyril Kharoua – 4 th HPTW – Malmö – May 2011 Thank you for your attention