Quantitative Techniques for Planning and Decision Making

Slides:



Advertisements
Similar presentations
Slides 13a: Introduction; Qualitative Models MGS3100 Chapter 13 Forecasting.
Advertisements

Developing Science Skills. Preparing for Tasks Level DLevel ELevel F individually or in small groups will identify two or three questions to investigate.
Chapter 15 Short-term Planning Decisions. What are Relevant Costs & Revenues? s They are future costs & revenues. s They are included in making decisions.
Halaman 1 Matakuliah: J0084 / Introduction to Management and Business Tahun: 2007 Versi: 1 / 3 Pertemuan 06 (Sixth Meting) Planning Tools and Techniques.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Systems Analysis and Design 9th Edition
Quantitative Techniques for Planning and Decision Making.
INTRODUCTION TO BUSINESS
Copyright © 2003 by South-Western/Thomson Learning. All rights reserved. 15–1 Operations Exhibit 15–1.
PowerPoint Presentation by Charlie Cook Operations, Quality, Technology, and Information Systems Chapter 15 Copyright © 2003 South-Western/Thomson Learning.
Copyright © 2004 South-Western. All rights reserved.9–1 Learning Goals Key resources used for production. Plant site decision. Design and layout decision.
Chapter 13 Working Capital Management  Short-term Cash Flow Planning  Managing Accounts Receivable  Credit Terms, Float, and Cash Management  Inventory.
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Applied Business Forecasting and Planning
Prepared by: Michael Palazzo
Project Management Chapter 3 BUSI 2106 – Operations Management.
CHAPTER 15 Essentials of Control Andrew J. DuBrin
Chapter 2 Data Patterns and Choice of Forecasting Techniques
CHAPTER 3 COST CONTROL What is revenue? (147) The income from sales before expenses.
Prepared by Robert F. Brooker, Ph.D. Copyright ©2004 by South-Western, a division of Thomson Learning. All rights reserved.Slide 1 Managerial Economics.
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Chapter 5 Demand Forecasting. Qualitative Forecasts Survey Techniques Planned Plant and Equipment Spending Expected Sales and Inventory Changes Consumers’
Planning Tools and Techniques
© Farhan Mir 2007 IMS Principles of Management BBA (Hons) 4 th Semester (Lectures 25,26,27) Planning Tools & techniques By: Farhan Mir.

Lecture 31. Chapter 8 Budgetary Planning and Control.
CHAPTER 12 Inventory Control.
MIE Class #13 Manufacturing & Engineering Economics Term Project Term Project – Next week guest lecture Concerns and Questions Concerns and Questions.
Planning Tools and Techniques Module
8 th edition Steven P. Robbins Mary Coulter PowerPoint Presentation by Charlie Cook Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Software Project Management
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
* * Chapter Nine Production And Operations Management Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Chapter 8 Transaction Processing Systems. Agenda OLD transaction processing systems Innovative IT applications SAP R/3.
MATERI XI PRODUKSI & OPERASIONAL. 5 ISSUES That arise when trying to produce a product or service Capacity (How much can I produce) Scheduling (How am.
Time-Series Forecasting Overview Moving Averages Exponential Smoothing Seasonality.
C HAPTER -06 QUANTITATIVE TECHNIQUES FOR PLANNING AND DECISION MAKING Dr. Gehan Shanmuganathan, (DBA) 1.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
PowerPoint Slides by Robert F. BrookerCopyright (c) 2001 by Harcourt, Inc. All rights reserved. Managerial Economics in a Global Economy Chapter 5 Demand.
C opyright  2007 by Oxford University Press, Inc. PowerPoint Slides Prepared by Robert F. Brooker, Ph.D.Slide 1.
Project Management in Practice
Project Management Inspections and Reviews 1 February.
Project Management Organization Scheduling 31 January.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Operations Fall 2015 Bruce Duggan Providence University College.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
CHAPTER 12 FORECASTING. THE CONCEPTS A prediction of future events used for planning purpose Supply chain success, resources planning, scheduling, capacity.
Sales Forecasts are used for: New product decisions Product scheduling Financial planning Inventory planning and procurement Distribution Human resource.
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Welcome to MM305 Unit 5 Seminar Forecasting. What is forecasting? An attempt to predict the future using data. Generally an 8-step process 1.Why are you.
CHAPTER 7 Quantitative Techniques for Planning and Decision Making Andrew J. DuBrin Essentials of Management, 6/e South-Western College Publishing Copyright.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Project Management Project Controlling
REQUIREMENTS Project management tools
deterministic Fixed and known in advance, representing a
PLANNING TOOLS AND TECHNIQUES
BUS 307 CART A Clearer path to student success/bus307cart.com
2.2 | Use Planning Tools.
BUS 307Competitive Success/tutorialrank.com
BUS 307 Education for Service-- tutorialrank.com.
BUS 307 HOMEWORK Education for Service--bus307homework.com.
Top 10 Dumbest Things You Can Do in Operations Management
ENGINEERING MANAGEMENT (GE 404)
PERT - The Program Evaluation and Review Technique
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Planning Tools and Techniques
AOA A style of project network diagram in which arrows
Presentation transcript:

Quantitative Techniques for Planning and Decision Making Chapter 6 Quantitative Techniques for Planning and Decision Making

Data-Based Decision Making Decisions are based on facts rather than impressions or guesses. Data-driven management uses high quality information. Data-driven managers want to see the data behind suggestion. Intuition and judgment still contribute.

Forecasting Methods Judgmental forecast uses subjective opinions. A time-series analysis estimates the future based on past trends, such as average growth per year. Three forecasting errors or traps: overconfidence, prudence, and recallability.

Types of Forecasts Economic forecasting predicts level of future business activity. Sales forecasting should be based on several estimates of future sales. Technological forecasting predicts what types of technological changes will take place, such as digitizing medical records.

Gantt Chart Compares planned and actual progress (from SmartDraw)

Milestone Charts Extends the Gantt chart by listing subactivities needed for major activities. For example, subactivities for finding tenants would include: Advertise in newspapers and online. Spread word through own network. Check credit histories of applicants.

Program Evaluation and Review Technique (PERT) PERT uses a network model to schedule activities and events. An event, or milestone, is the accomplishment of a task. An activity is a task that must be performed.

Steps in Preparing a PERT Network List activities and events needed to complete project. Draw PERT network by linking activities in proper sequence. Estimate time for each activity. Calculate critical path (most time consuming sequence of events and activities).

Time for three tasks = Completion time for project Nucleus of PERT Time for three tasks = Completion time for project Task x y 1 5.33 2 6 1.33 3 9.67 1 week 2 weeks 2 weeks

Break-Even Analysis BE = _______Fixed Cost ________ Price per unit – Variable cost Break-even analysis must be calculated frequently because fixed and variable costs may change suddenly. BEA keeps eye on volume of activity needed to justify expense.

Decision Trees Graphically illustrates alternative solutions. Expected value is average value if decision is made many times under certain conditions. Decision tree is used to help make sequence of decisions, such as expanding operations.

Economic Order Quantity (EOQ) EOQ = square root of 2DO C D = annual demand in units for product O = fixed costs of handling the order C = annual carrying cost per unit

Just-in-Time System Kanbans (cards for requirements) Demand-drive pull system Short production lead times High inventory turnover (goal is zero) Designated areas for receiving Designated containers for storage Neatness counts

Pareto Diagram to Identify Problems