New Source Review in the SCAQMD November 2, 2005 Judy B. Yorke Yorke Engineering, LLC 949-248-8490 x25

Slides:



Advertisements
Similar presentations
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
Advertisements

New Source Review (NSR) Program Basics
Richard (Rick) Goertz, P. E
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
New Source Review: Modeling and Offsets
AWMA Meeting October 15, 2013 Stack testing issues and questions Dennis Thielen.
1 STATE OF THE ART MANUALS IN DEVELOPMENT VOC Storage Tanks Asphalt Manufacturing Facilities Landfills Reason for drafting manuals –Prior VOC Storage tanks.
SCAQMD Boiler Rules Rule – Emissions of Oxides of Nitrogen from Large Water Heaters and Small Boilers March 22, 2006.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
Implementation of SB 700 (Florez) Seyed Sadredin Director of Permit Services San Joaquin Valley APCD November 4, 2003.
Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2014.
IMPLEMENTATION OF SENATE BILL X1 28 & UPDATE OF POWER PLANT SITING GUIDANCE Workgroup Meeting August 3, 2001 California Environmental Protection Agency.
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
1 The Impact of Using LNG-Derived Natural Gas in the South Coast Air Basin January 2006.
Air Permitting Overview.
New Source Review (NSR) Program Basics and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Laura McKelvey, Jessica Montañez,
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
1 CE Air Pollution Control Regulations and Philosophies Jeff Kuo, Ph.D., P.E.
Implications of Proposed Ozone Standards in Southeast Missouri (SEM) SMRPC Meeting, Perryville, MO April 24, 2015 Joletta Golik.
NEGOTIATING ENVIRONMENTAL PERMITS Steven Lacoste Lee, Futrell & Perles, LLP September 2014 – University of New Orleans.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
The National Emissions Inventory (NEI) Sally Dombrowski EPA-OAQPS.
UTILITY NSR REFORM TIMEFRAMES EARLY 90’SBEGIN CAAA IMPLEMENTATION MID 90’SNSR REFORM DEVELOPMENT - S/A Principles - EPA Proposals.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
Air Quality 101 Kansas Air Quality Program overview.
EPA - New Source Review Proposed NSR Rules for Indian Country Genevieve Damico, EPA Region 5 Presentation drafted by: Raj Rao, Jessica Montanez, Wendy.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Notices to Comply (NTC) and Notices of Violation (NOV) March 22, 2006 Peter Moore Yorke Engineering, LLC x24
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
Minor NSR Program and Highlights of the Proposed Tribal Major Nonattainment and Minor NSR Rules Jessica Montañez U.S. Environmental Protection Agency Office.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Blue Skies Delaware; Clean Air for Life 10/8/08 Minor New Source Review Alberto Roybal.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Best Available Control Technology/Lowest Achievable Emission Rate Evaluation Sarah Fuchs Air Permits Division Texas Commission on Environmental Quality.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Air Quality Technical Advisory Committee Meeting September 27, 2006 Virendra Trivedi Chief, New Source Review/Title V Section Division of Permits Bureau.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
How to target your review Genevieve Damico U.S. EPA (312)
CAPCOA’S Perspective on Recent Key PM Legislation in California Presented by Mel Zeldin CAPCOA Technical Consultant.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Senate Bill 288- Limits Changes to Air Districts’ New Source Review Rules Beverly Werner, Manager Stationary Source Division California Air Resources Board.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
1 New Sources in Nonattainment Areas: Citizens Against Refinery’s Effects Action to review EPA approval of Virginia SIP SIP included: Permit for refinery.
PSD Background Presentation
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Clean Air Act (CAA) Purpose
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
How To Target Your Review
Air Quality Permitting Guidelines for Industrial Sources
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Major New Source Review (NSR)—Part 1
Air Quality Permitting Guidelines for Industrial Sources
Uinta Basin General Conformity
Presentation transcript:

New Source Review in the SCAQMD November 2, 2005 Judy B. Yorke Yorke Engineering, LLC x25

New Source Review (NSR) In the SCAQMD, Regulation XIII specifies the NSR requirements. Rule 1301 states: “The specific air quality goal of this regulation is to achieve no net increases from new or modified permitted sources of nonattainment air contaminants or their precursors.”

Applicability of Reg. XIII NSR generally applies to New, Modified, or Relocated Sources “Modification means any physical change in equipment, change in method of operation, or an addition to an existing facility, which may cause the issuance of air contaminants.” “Routine maintenance and/or repair shall not be considered a physical change.”

Which Pollutants? All Nonattainment air contaminants and their precursors, plus ammonia and Ozone Depleting Compounds (ODCs) Typically, the key pollutants include: NOx VOCs PM CO SOx

When is BACT Applied? Best Available Control Technology is required for any relocation, new, or modified source which results in an emission increase [Rule 1303(a)(1)] Except for a qualifying Relocated Minor Facility, where there is no net increase in emissions within two years [Rule 1306(d)(3)]

What Defines an Increase? … Or Decrease? Rule 1306 specifies Increases and Decreases under NSR: Increase = Potential to Emit Decrease = Actual Emissions (last 2 years) at current BACT (& discounted if <180 days of use)

When and How is BACT Decided? BACT is determined at the time of permit issuance BACT is determined on a case-by-case basis

BACT for Major/Minor Sources BACT determination based on whether the source is classified as “major” or “minor” Major Sources - Must meet Federal LAER Minor Sources – Use Minor Source BACT Guidelines

Major Source Definition In the South Coast AQMD, a major source has the Potential to Emit (PTE) greater than these thresholds: VOC10 Tons/Year NOx10 Tons/Year SOx100 Tons/Year CO50 Tons/Year PM1070 Tons/Year

Major Source BACT Major Source BACT is determined case- by-case BACT analysis looks at the “best” emission limits for similar equipment anywhere in the U.S. BACT definitions can be constantly changing and tend to become more restrictive over time

Major Source BACT Guidelines The complete BACT Guidelines can be downloaded from:

What is BACT? BACT means the most stringent … limit or control technique which: (1)has been achieved in practice for such category or class of source; or (2)is contained in any state implementation plan (SIP) … ; or (3)is any other emission limitation or control technique, found … to be technologically feasible for such class or category of sources or for a specific source, and cost-effective …” Federal LAER State BACT

Achieved in Practice, Reg. Documents An emission limit or control technology may be considered AIP if it exists in any of the following regulatory documents or programs: AQMD BACT Guidelines CAPCOA BACT Clearinghouse USEPA RACT/BACT/LAER Clearinghouse Other districts’ and states’ BACT Guidelines BACT/LAER requirements in New Source Review permits issued by AQMD or other agencies

Achieved In Practice, New Technologies A control technology may be considered Achieved in Practice if it meets the following: Commercial Availability: At least one vendor must offer this equipment for regular or full-scale operation in the United States with a performance warranty; Reliability: All control technologies must have been installed and operated reliably for at least six months … at a minimum of 50% design capacity … ; Effectiveness: The control technology must be verified to perform effectively over the range of operation expected for that type of equipment …”

Achieved in Practice, Tech. Transfer Technology that is determined to be AIP for one category of source be considered for transfer to other source categories. There are two types of potentially transferable control technologies: 1) exhaust stream controls for similar exhaust streams, and 2) process controls and modifications for similar processes.

Examples of Major Sources BACT SCAQMD Determinations for Boilers:

Minor Source BACT For minor sources, the SCAQMD has published Minor Source BACT Guidelines [Part D - Minor Source BACT may be less stringent than for major sources However, not all source types are listed… Be very careful of using the appropriate category!

Examples of Minor Source BACT *Natural gas fired SCAQMD Determinations for Boilers*:

Examples of Minor Source BACT SubcategoryNOxSOxPM10 Carpet Oven80 O 2 Natural Gas Rotary, Spray and Flash Dryers 1) Natural Gas with Low NOx Burner Natural Gas Natural Gas w/ Baghouse Tray, Agitated Pan, and Rotary Vacuum Dryers Natural Gas with Low NOx Burner Natural Gas Natural Gas Tenter Frame Fabric Dryer60 3% 02 Natural Gas Other Dryers and Ovens – Direct and Indirect Fired 30 3% 02 Natural Gas Natural Gas 1. Dryers for foodstuff, pharmaceuticals, aggregate & chemicals. SCAQMD Determinations for Dryers and Ovens

Typical Permit Conditions Emission limits for pollutants released Monitoring requirements Maintenance requirements Source testing requirements Recordkeeping requirements

BACT Implications Remember, once BACT is set for your source, you must always comply with that limit… as will all of the sources after you…