1 November 10, 2006Team # 7103 M.E.T.E.O.R. Instrumentation Platform Sponsor: Harris Corporation 2006-2007 Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.

Slides:



Advertisements
Similar presentations
Satellite Communication
Advertisements

Communication With a High Altitude Balloon Team HAB-Comm: Ryan OvermanBrian Thomas Thomas RawlsTrenton Katter.
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
High altitude airborne developments have presented huge advantages in the US military’s arsenal through: environmental monitoring precision navigation.
Aolani “heavenly cloud” University of Hawaii Shantel Hunt, Nick Fisher, Dan Fong, James Ah Heong, Monica Umeda.
1 May 18, 2007Team # 7103: METEOR Instrumentation Platform M.E.T.E.O.R. Instrumentation Platform Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.
EEE440 Modern Communication Systems Satellite Systems.
Team Thermasense Thermal Wireless Sensor. Where Does Thermasense Fit In? Re-Entry problems: Space vehicles are heavily instrumented. Wires can introduce.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
08/16/01.
1 SHOT II Communication System Experiment University of Minnesota Max Schadegg, Cole Christensen, Ian Macmillen, Steve Haviland June 10 th, 2010 University.
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Wireless Data Acquisition for SAE Car Project by: J.P. Haberkorn & Jon Trainor Advised by: Mr. Steven Gutschlag.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
LSU 10/09/2007System Design1 Project Management Unit #2.
Communication and Ground Station 12 October 2008.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
Speed of Sound Team BalloonWorks. Table of Contents Mission Goal and Objectives Science and Technical Backgrounds Mission Requirements Payload Design.
SCADA and Telemetry Presented By:.
Team Flying Camels Nawar Chaker Paul Savage Tim Jacobs Pete Dokter Adam Swartley Capstone Project January 22, 2005.
Communications & Networks
InSeT System Inertial Sensor Tracking System Underground Mine Safety For Personnel Utilizing Inertial Sensors Technical Presentation.
Patrick Lazar, Tausif Shaikh, Johanna Thomas, Kaleel Mahmood
Mobile Distributed 3D Sensing Sandia National Laboratories Intelligent Sensors and Robotics POC: Chris Lewis
Proposed Approach  Research available commercial satellite communications services  Explore viable battery technologies  Investigate GPS receiver functionality.
Team Balloon Satellite II Multi-Disciplinary Senior Design CSEN 4201 Level II Mid-Term Report 17 October 2003 Mentor: Tony Kim.
Presented by Amira Ahmed El-Sharkawy Ibrahim.  There are six of eight turtle species in Ontario are listed as endangered, threatened or of special concern.
Undergraduate Space Research Symposium University of Colorado Boulder
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
DESIGN & IMPLEMENTATION OF SMALL SCALE WIRELESS SENSOR NETWORK
Satellite Communications
Command and Data Handling (C&DH)
By : Anand Yadav. What is Zigbee?  The CC2520 is Texas Instrument’s second generation ZigBee/IEEE RF transceiver for the 2.4 GHz unlicensed.
Summary Thus far we have: ECE 4710: Lecture #39
HSMM-Mesh From Space South Texas Balloon Launch Team BLT-26.
The Balloon Launch “Spacecraft” and Environment ACES Presentation T. Gregory Guzik February 20, 2003.
Hardware Overview Autopilot Control Board- Serves as common platform for other components and has autopilot code and flight plans Battery- Powers the board.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
1 University of Maryland DYMAFLEX SHOT II Pre-Flight Presentation June 29, 2012.
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
Aerospace Digital Communication Instrument Senior Design 1 Presentation.
Path The purpose of this project is to design a universal data recording device to monitor the health of a Dresser-Rand compressor during operation. In.
Aerospace Digital Communication Instrument Senior Design Presentation.
Arizona Space Grant Symposium April 19, 2008 SWE Imaging Payload Command and Data Handling Jordan Cluster.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
Component Selection and PCB Fabrication Supervisor: Dr. Peter Driessen Presenter: Justin Curran.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Group #15 Matt Frank Russell Geschrey.  This project was chosen because of an interest in wireless communication systems, namely BAN's (body area networks)
Simplifying Customer Software Integration Tim Myers April 9 th, 2011 Colorado Undergraduate Space Research Symposium Payload Configuration GUI.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Project METEOR – R.I.T. Satellites!!. Project METEOR – R.I.T. Overview of Project METEOR: METEOR Video
SATELLITE COMMUNICATION Sanjida Hossain Sabah Lecturer, BRAC University.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
Planetary Lander PDR Team Name
InSeT System Inertial Sensor Tracking System
PROJECT METEOR: RITSAT1 P08102
Project METEOR [P08102 RITSAT I]
Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
University of Maryland DYMAFLEX SHOT II Post-Flight Presentation
Which of the following is a digital communications mode?
Satellites!!.
Abdullah Saad Ahmed Alqahtani ( ) VSAT Abdullah Saad Ahmed Alqahtani ( ) AVP4/ VSAT TTC.
Abdullah Saad Ahmed Alqahtani ( ) VSAT Abdullah Saad Ahmed Alqahtani ( ) AVP4/ VSAT TTC.
Team RAPTORS Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
Presentation transcript:

1 November 10, 2006Team # 7103 M.E.T.E.O.R. Instrumentation Platform Sponsor: Harris Corporation Matt Lipschutz Rashmi Shah Adam Gutterman Jessica DeSignor Rick Frisicano Peter Rozwood

2 November 10, 2006Team # 7103 Overview MMicrosystems EEngineering and TTechnology for the EExploration of OOuter Space RRegions Balloon Platform Rocket Picosat Track Objective: Develop a low-cost balloon- assisted in-air rocket launch system capable of placing small (~1kg) satellite payloads into a low- earth orbit (LEO).

3 November 10, 2006Team # 7103 Instrumentation Platform Project Objective: –Further develop an independent balloon-lofted computational platform capable of monitoring the environment and communicating in near real time with ground control stations Key Customer Needs: –Transition component infrastructure to MSP430 microprocessor –Design and implement RF power amplifier for video transmission –Design and implement custom portable microcontroller-based text overlay –Develop modular transient thermal model –Analyze and redesign legacy components such as radios and sensors

4 November 10, 2006Team # 7103 Prior Power System Analysis System power efficiency was unacceptable Battery setup was prone to failure –Negative (-)9V was supplied from single unregulated 9V battery Linear regulators –Voltage rails: +12, +/-9, +5, +3.3 –+/-9 and +3.3V rails each powered single device

5 November 10, 2006Team # 7103 Improved Power System Design Efficiency: –Linear: 3.3V at 20% efficiency to 80% efficiency using new switcher (from 18V) –Linear: 12V at 75% efficiency to 95% efficiency using new switcher (from 18V) Surface mount parts (latest switching power supplies) New voltage rails (+/-12, +5, +3.3) all use switching voltage regulators Possibility of mitigating noise issues through filters

6 November 10, 2006Team # 7103 Central Microprocessor MSP430 chosen for homogeneity and low power consumption Primary functions: –Process ground control commands –Data collection: GPS: position, altitude, speed Sensors: temperature, pressure, humidity and accelerometer –Generate data packets for the following: Transmission to ground based receivers Video text overlay On-board data storage –Send commands to peripheral devices

7 November 10, 2006Team # 7103 Sensors Purpose: Characterize atmosphere to accurately predict launch conditions Redesign of sensor network –Utilize I2C bus on MSP430 –Replace analog sensors with digital equivalents Increase sensor accuracy Decreased power consumption Simplified data acquisition

8 November 10, 2006Team # 7103 Video Subsystem Multiplex between five fixed-position analog (NTSC) video cameras –Video information will be relayed to ground control stations to monitor the rocket before, during, and after launch, as well as monitoring the status of the ascent balloon and descent parachute. –Video information will also be utilized during retrieval to estimate orientation.

9 November 10, 2006Team # 7103 Custom Text Overlay Text is overlaid on video transmission –Acts as a redundant sensor information downlink –Text overlay is receivable without the use of specialized radios or reception equipment Text overlay system must be “portable” –Problems with obsolete components creates demand for a portable software solution with a minimum of specialized hardware

10 November 10, 2006Team # 7103 TV Transmitter Improvements Increase range for which the video signal may be received –Current system range: 4 miles –New system range: Up to 100 miles Increase power transmitted –Power transmitted > 1W –Ideal: 5W –Allow for the use of smaller less specialized receive antenna –Enable the mobile station to chase the payload while viewing its status

11 November 10, 2006Team # 7103 TV Transmitter Design Subsystem design meets customer needs –Transmitter: Continuously transmits video signal to ground –RF power amplifier: Increase transmit power to at least 5W Subsystem design meets customer specifications except: –Maximum attainable range: 80 miles Mitigations –Range cannot be increased since receiving network is predetermined

12 November 10, 2006Team # 7103 Radio Data Link Facilitates communication between platform and ground –Downlink: Sends position reports and sensor data Can be received directly with specialized receivers Data posted automatically to Internet using existing infrastructure: requires only a URL to access –Uplink: Receives commands from ground station and sends them to central processor

13 November 10, 2006Team # 7103 Results of Previous Launch Data received by multiple sources and posted to internet –Time of flight: approx 1.5 hours –Range: 62 mi –Max altitude: ft –Max speed: 70 mph Data transmission failed at peak of flight

14 November 10, 2006Team # 7103 Radio Data Link Improvements Modularity of system: Uses multiple components that can be removed or replaced if necessary Simplify operation –Configuration is via GUI on PC –No reconfiguration required at launch time; system will operate normally at power-up Redundancy –Extra GPS and circuitry: Position reports are still sent even if central microprocessor fails

15 November 10, 2006Team # 7103 Thermal Analysis Create transient thermal model of the instrumentation platform during flight Problems: Electronics generate heat Properties of air change significantly during flight Operating temperature range of electronic components

16 November 10, 2006Team # 7103 Thermal Model Styrofoam Enclosure Electronics “block” Aluminum mesh Feed-through holes

17 November 10, 2006Team # 7103 Thermal Results

18 November 10, 2006Team # 7103 Risk Assessment Loss of communication with ground control Insufficient battery life Inadequate processing power for text overlay microprocessor Central microprocessor failure Thermal issues (overheating/freezing) Excess humidity Midair collision

19 November 10, 2006Team # 7103 MSD II project Schedule 3/17/07: Send out board layout design 4/07/07: Final debug 4/14/07: Burst-balloon launch 4/21/07: Zero-pressure balloon launch 5/10/07: Cumulative design review 5/18/07: Final presentation Budget estimate: –$4500 (Includes burst and zero-pressure balloons, two complete boards, two launches)