The LHC Machine and Experiments

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
Highest Energy e + e – Collider LEP at CERN GeV ~4km radius First e + e – Collider ADA in Frascati GeV ~1m radius e + e – Colliders.
1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
The CERN-JINR Collaboration J. Engelen March 27, 2006.
The Large Hadron Collider By Kathleen McKay. What is the LHC? The most powerful particle accelerator in the world. A synchrotron (ring-shaped particle.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
14 August Magnetic Field in the ATLAS Muon Spectrometer Masahiro Morii for the ATLAS Group Harvard University Laboratory for Particle Physics and.
1 Perspectives for quarkonium production in CMS Carlos Lourenço, on behalf of CMSQWG 2008, Nara, Japan, December 2008.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Il Trigger di Alto Livello di CMS N. Amapane – CERN Workshop su Monte Carlo, la Fisica e le simulazioni a LHC Frascati, 25 Ottobre 2006.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
Discovering the Higgs Boson J. Pilcher Talk for Graduate Students January 9, 2004.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 Triggering on Diffraction with the CMS Level-1 Trigger Monika Grothe, U Wisconsin HERA-LHC workshop March 2004 Need highest achievable LHC Lumi, L LHC.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
The Compact Muon Solenoid. What does CMS do? The Compact Muon Solenoid is a general purpose particle detector installed at point 5 of the Large Hadron.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
ATLAS Tile Hadronic Calorimeter:
Jessica Leonard, U. Wisconsin, December 19, 2006 Preliminary Exam - 1 H->  Jessica Leonard University of Wisconsin - Madison Preliminary Examination.
First CMS Results with LHC Beam
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
The Modular Design of CMS
The LHCb Installation Story
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
The Status of the LHC Machine and the Experiments
The Compact Muon Solenoid Detector
The First-Level Trigger of ATLAS
L H C A T L A S International Collaboration on the LHC Project
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Presentation transcript:

The LHC Machine and Experiments Gigi Rolandi – CERN PH Gigi Rolandi - CERN 30 June 2005

The LHC machine First full LHC cell (~ 120 m long) : 6 dipoles + 4 quadrupoles; successful tests at nominal current (12 kA) 8.4 Tesla Gigi Rolandi - CERN More than half of the 1232 dipoles are produced 30 June 2005

Lowering of the first dipole into the tunnel (March 2005) The magnet production proceeds very well and is on schedule, also the quality of the magnets is very good Gigi Rolandi - CERN 30 June 2005

28th June: 49 dipoles installed Gigi Rolandi - CERN 30 June 2005

LHC construction and installation Cryogenics (QRL) in the tunnel Interconnection of the dipoles On the critical path for the first collisions, is the installation of the LHC in the tunnel, in particular due to delays in the cryogenic services lines (QRL) which initially had problems, and for which a recovery plan was implemented successfully Dipole installation in the tunnel Gigi Rolandi - CERN 30 June 2005

LHC installation and hardware commissioning plan Gigi Rolandi - CERN 30 June 2005

QRL installation is now proceeding smoothly. The main remaining problem is the fast ramp up of production of service modules to feed the installation sites at the speed required. Machine installation has started. Hardware commissioning finished by end June 2007. Ready for beam. Lyn Evans’ conclusions from the his presentation at the last RRB on the LHC status (end April 2005) Gigi Rolandi - CERN 30 June 2005

Objectives for the Pilot RUN Reach a Luminosity of 1032 Low Luminosity run at 25 ns separation Difficult to speculate further on what the performance might be in the first year. As always, CERN accelerators departments will do their best ! Lyn Evans Gigi Rolandi - CERN 30 June 2005

LHCb Spectrometer OT Muon System Magnet RICH1 VELO RICH2 TT Calo. System Gigi Rolandi - CERN 30 June 2005

LHCb Experimental Area RICH1 shielding-box in front of magnet magnet Hcal Ecal Fe muon filters Gigi Rolandi - CERN 30 June 2005

LHCb Level-1/High Level Trigger and DAQ PT Level-0: 40 MHz1 MHz Level-1: 1 MHz40 KHz Level-1 data (VELO, TT, L0-info) with a possibility to include Tracker, Muon, L0-Calo HLT data (all data) 40kHz @ 50kB/event 1MHz @ ~5kB/event Network Switches sub- farm sub- farm sub- farm sub- farm sub- farm commercial components … storage device network decision 2000 Hz Gigi Rolandi - CERN 30 June 2005

Gigi Rolandi - CERN 30 June 2005

LHCb will be ready to fully exploit LHC since day one LHCb Status Good achievement made for the construction of many subsystems Construction of the muon chambers is proceeding with tight planning Pilot Run  commission run for calibration alignment (J/Psi ….x-sections…) LHCb will be ready to fully exploit LHC since day one Gigi Rolandi - CERN 30 June 2005

ALICE ALICE TOF TRD HMPID TPC PMD ITS Muon Arm PHOS Detector Size: 16 x 26 meters Weight: 10,000 tons TOF TRD HMPID TPC PMD ITS Muon Arm PHOS Gigi Rolandi - CERN 30 June 2005

magnet volume: 12 m long, 12 m high 0.5 T solenoidal field still largest magnet magnet volume: 12 m long, 12 m high 0.5 T solenoidal field The ALICE Magnet: ready for the experiment to move in! Gigi Rolandi - CERN 30 June 2005

Largest ever TPC 88 m3 Gigi Rolandi - CERN 30 June 2005

Initial working detector well on track for collisions in summer 2007 ALICE INSTALLATION ‘initial working detector’ for initial pp and HI physics Pb-Pb initial L ~ few 1025 cm-2s-1 (1/20 of design) => large cross section processes Some of the most interesting results of RICH came out in the first few days: Global event properties. aim for ‘complete detector’ for collisions in 2008 50% of TRD , 3 out of 5 PHOS Initial working detector well on track for collisions in summer 2007 Gigi Rolandi - CERN 2/2/2005 LHCC Status Report J. Schukraft

Compact Muon Solenoid CALORIMETERS SUPERCONDUCTING COIL IRON YOKE ECAL HCAL Scintillating PbWO4 crystals Plastic scintillator/brass sandwich IRON YOKE TRACKER Silicon Microstrips Pixels Total weight : 12,500 t Overall diameter : 15 m Overall length : 21.6 m Magnetic field : 4 Tesla MUON ENDCAPS MUON BARREL Drift Tube Resistive Plate Cathode Strip Chambers Chambers Chambers Resistive Plate Chambers Gigi Rolandi - CERN

CMS Assembly Sequence Surface Underground Construct barrel yoke & cable Prepare infrastructure in USC Prepare solenoid vac tank Install shielding in UXC Construct endcap yoke & cable Prepare infrastructure in UXC Assemble hadron calorimeters Install muon chambers in yoke Complete ECAL barrel & cable Assemble coil & insert in vac tank Install Tracker and cable Insert barrel HCAL inside coil Install beam-pipe Close experiment and commission TEST MAGNET FIRST PHYSICS Lower underground in big entities Install ECAL endcap & pixel Gigi Rolandi - CERN

Cold mass of CMS coil complete CMS Magnet Status Cold mass of CMS coil complete Swiveling and Insertion tests With dummy coil Gigi Rolandi - CERN

CMS Heavy Lowering 15 heavy lifts of about 1 week duration each. Heavy lowering will start in Mar 2006, after magnet test 15 heavy lifts of about 1 week duration each. Heaviest piece (central wheel + solenoid) 2000 tonnes. Gigi Rolandi - CERN

70% of DT chambers assembled, 15% installed CMS Barrel Muon Spectrometer 70% of DT chambers assembled, 15% installed Gigi Rolandi - CERN

60% CSCs installed, 50% commissioned with cosmic rays CMS Endcap Muon Spectrometer All 400 chambers produced ! CSC installation 60% CSCs installed, 50% commissioned with cosmic rays Gigi Rolandi - CERN

CMS Tracker TIB Shells Gigi Rolandi - CERN

CMS Commissioning Now : detectors being commissioned with cosmic rays also in large chunks, addressing system issues. Q1 06, cosmic challenge: slice test of CMS during the Magnet Test Test with cosmic rays will continue in the pit after installation and re-cabling Pilot run: Assume that we get a reasonable amount of collision data which are completed by Beam Gas/Beam Halo Muon datasets LVL1/HLT/DAQ: Timing-in, data coherence, sub-system synchronization, calibration, debug algorithms, … ECAL and HCAL calibration :Intercalibrate barrel crystals - “Phi Symmetry Method” ~2% and Cross check and complete source calibration for HCAL channels ~2% Tracker and Muon alignment : Align the tracker strip detector significantly below the 100 mm level, Align the muon chambers at the 100 mm level Gigi Rolandi - CERN

CMS Status Civil Engineering is off the Critical Path Magnet: Coil connected. Start swivelling preparations in June 2005. Q1-06 end magnet test and cosmic challenge & start heavy lowering April 06 HCAL, Muons : construction on schedule and well advanced. TO WATCH: ECAL: Crystals production, new contracts signed with two vendors. TRACKER: Hybrid production and tracker integration at CERN. *ECAL endcaps and pixels (even though ready) will be installed during winter 2007 shutdown in time for physics run in 2008. Initial CMS* detector will be ready and closed for beam on 30 June 2007. Gigi Rolandi - CERN 30 June 2005

Requires special machine conditions– similar to polarization at LEP. TOTEM beta* = 1540 m, 43 bunches, low emittance Plus large t elastic scattering at 18 m 3 x 1-day runs at 1540 plus 2 short runs at 18 m Roman Pots at 10 , high beam stability, low BGs Requires special machine conditions– similar to polarization at LEP. The difficulty and challenge of TOTEM operation is coming from the requested precision for both optics & beams. Roman Pots at ~10 imply : collimators must be set to 6/7 s. e* ~ 1 mm, ~ 4 times smaller than nominal :  collimator gaps  1 mm

ATLAS Gigi Rolandi - CERN 30 June 2005 Diameter 25 m ATLAS superimposed to the 5 floors of building 40 Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m Overall weight 7000 Tons Gigi Rolandi - CERN 30 June 2005

ATLAS Installation 5 out of 8 coils installed End of coil installation by july 05 Gigi Rolandi - CERN 30 June 2005

ATLAS MDT Chamber production Gigi Rolandi - CERN 30 June 2005

ATLAS LAr EM Barrel Calorimeter and Solenoid Commissioning The barrel EM calorimeter is installed in the cryostat, and after insertion of the solenoid, the cold vessel was closed and welded A successful complete cold test (with LAr) was made during summer 2004 in hall 180 End of October the cryostat was transported to the pit, and lowered into the cavern LAr barrel EM calorimeter after insertion into the cryostat Solenoid just before insertion into the cryostat Gigi Rolandi - CERN 30 June 2005

ATLAS combined test beam in 2004 Towards the complete experiment: ATLAS Full “vertical slice” of ATLAS tested on CERN H8 beam line May-November 2004 x z y Geant4 simulation of test-beam set-up For the first time, all ATLAS sub-detectors integrated and run together with common DAQ, “final” electronics, DCS, etc. Gained lot of global operation experience during ~ 6 month run. Common ATLAS software used to analyze the data Gigi Rolandi - CERN 30 June 2005

ATLAS Commissioning Commissioning with physics data proceeds in four phases: Phase 3 : Cosmics running  initial physics alignment / calibration of the detector  debugging of sub-systems, mapping dead channels etc. Phase 4 : One beam in the machine  beam-halo muons and beam-gas events  more detailed alignment / calibration etc. Phase 5 : First pp collisions : prepare the trigger and the detector tune trigger menus / measure efficiencies begin to measure reconstruction efficiencies, fake rates, energy scales, resolutions etc. Phase 6 : Commissioning of physics channels Improve measurements begin to understand backgrounds to discovery channels … Gigi Rolandi - CERN 30 June 2005

ATLAS Commissioning – cosmic rays First Cosmic ray observed by ATLAS Hadron Tilecal calorimeter in the pit on June 20th One track reconstructed in Muon chambers Two tracks reconstructed in Inner Detector Will happen every ~ 10 s Gigi Rolandi - CERN 30 June 2005

ATLAS Status Component construction is (almost) complete for several sub-systems, The completion of the Inner detector is proceeding with very tight planning. emphasis has shifted to integration, installation and commissioning Large-scale surface system tests, in particular the combined test beam runs, have been a very major activity in 2004 There is very good progress of the schedule-critical magnet assembly, and on the general installation status and activities in the cavern The commissioning has started: organization, planning, activities Atlas is on Track for collisions in summer 2007 and physics still in 2007 Gigi Rolandi - CERN 30 June 2005

CONCLUSIONS Laboratory fully committed to the LHC project Machine : past year achievements have been impressive giving robustness to the schedule Main objective remains to complete LHC installation towards end of 2006 and to get first beams by summer 2007 Experiments : generally on track for ready for beam in middle 2007. Emphasis now on commissioning and preparation for pilot run. Gigi Rolandi - CERN 30 June 2005