1 Preliminary Cable Labor Estimate Howard Budd University of Rochester Rochester Meeting Dec 4 2008.

Slides:



Advertisements
Similar presentations
Strategies for Clear Communication
Advertisements

ENGLISH AS A SECOND LANGUAGE PRESCRIPTION SYSTEM.
Project Steps We started by… – Researching what we would need – Purchasing what we would need Next… – We waited for supplies to arrive in the mail – We.
Conducting Patient Safety Rounds with Staff. First Steps Set the stage –Unit and Hospital Leadership Support –Identify a “champion(s)” for each unit where.
Chapter 17: The binomial model of probability Part 2
Do Now Please come in quietly, and study your notes on semicolons.
Two-Word Verbs: Separable Inseparable
Phrasal Verb Test 1 21 st September Answer Key #1 1. broke in 2. broken off 3. blow off 4. to back down 5. acting up 6. asked Susan out 7. blew.
 We can also use the present perfect tense to talk about:  1 a past action with a result in the present She isn’t here, but she ___________her mobile.
A student wonders if tall women tend to date taller men than do short women. She measures herself, her dormitory roommate, and the women in the adjoining.
Attentiveness vs. Distraction
Warm Up What was one positive thing that happened to you over break?
Created by Liat Rothfeld December 5, 2010 Begin Lily spent a whole class period creating an illustration in MS Paint. She went to File-Save, gave it.
Algebra Problems… Solutions Algebra Problems… Solutions © 2007 Herbert I. Gross Set 23 By Herbert I. Gross and Richard A. Medeiros next.
1 RUNNING a CLASS (2) Pertemuan Matakuliah: G0454/Class Management & Education Media Tahun: 2006.
Heat Rate to a Chocolate Chip Cookie through various cooking Surfaces Date: Dec 11, 2006 Group Members: Tony Rands Adrian Williams Josh Dustin.
WLS Fiber Pigtails Howard Budd University of Rochester Dec T2K Collaboration Meeting.
MINER A Director’s CD-3b Review 11 June 2007 Kevin McFarland University of Rochester 1MINERvA WBS 1,2,4: Scintillator and Fiber Fiber Milestones: WLS Fiber.
1 Z cables with New Fiber Howard Budd University of Rochester Rochester Meeting Jul
1 Start at Estimating Cable Labor Howard Budd University of Rochester Rochester Meeting Nov
Diamonds & t2k production Howard Budd Oct
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Practicum: Fraction Fish By: Janessa Pope. Context  Edith Bowen Laboratory School  Mrs. Kyriopoulos’s 5 th grade class  Classroom was set up in six.
Design and Technology – Rain Gauge Project
CAN YOU GET TO THE GROCERY STORE IN TIME? Web quest.
Please CLOSE YOUR LAPTOPS, and turn off and put away your cell phones, and get out your note-taking materials. Today’s daily quiz will be given at the.
Aims of session Making reading fun Early reading Developing reading
Book Log Bingo Response Directions
Week 2 9/8-9/12. The Material World Chapter 2 9/3.
A student wonders if tall women tend to date taller men than do short women. She measures herself, her dormitory roommate, and the women in the adjoining.
Yr 7 & 9 Naplan Preparation - Numeracy Facts, tips and hints for doing the Numeracy paper Insert school logo © LearningYou.
Big Ideas & Better Questions, Part II Marian Small May, ©Marian Small, 2009.
Page ?, 11/12/08, Science Topic Objective: SWBAT brainstorm for their science fair project Catalyst: Staple in returned works.
Test 2 Review The test will consist of 3 sections. Section 1 is vocabulary matching. Section 2 is a Rate Per 100 problem. Section 3 is a Unit Rate Problem.
Topic 1.1 Extended Problem solving strategies  One of the main “headaches” of physics has traditionally been the problem solving aspect of it.  Generally,
3-2 Adding and Subtracting Decimals Warm Up Warm Up Lesson Presentation Lesson Presentation Problem of the Day Problem of the Day Lesson Quizzes Lesson.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
PHY131H1F Class 3 Today: Error Analysis Significant Figures Unit Conversion Normal Distribution Standard Deviation Reading Error Propagation of Errors.
LookThinkDiscussAgreeShareWrite What do these things have in common ? They all make things look bigger!
Regression Lines. Today’s Aim: To learn the method for calculating the most accurate Line of Best Fit for a set of data.
Word problems DON’T PANIC! Some students believe they can’t do word problem solving in math. Don’t panic. It helps to read the question more than once.
SFA Monday. Take out old Vocabulary check Record your Comprehension and Vocabulary score. File your test and vocabulary check and read and response Write.
Sight Word List.
Question 14 Exercise page 341 Carwash. This records our frustration with trying to match our answer with the back of the book. Learning did happen.
1º ESO UNIT 9 PRESENT PERFECT I’ve gone to VS I’ve been to Present Perfect VS Past Simple.
Bellwork 8/30/04- 8/31/04 Take a folder and write your LAST NAME then your FIRST NAME on the tab at the TOP of the folder. Place your Student Info Sheet.
What To Do With Remainders By the end of this lesson, you will know four different ways to handle a remainder in real life.
Steps in the Scientific Method. Identify the Problem or Ask Your Question Think about problems or questions you have come across in your daily life. You.
NARRATIVE PERSPECTIVE BROUGHT TO YOU BY POWERPOINTPROS.COM.
Math Minutes, September /9 – 4/5 2. Carrie ran around the school’s track 1 ½ times. She started to walk ¼ of the distance and then began to run.
Hot Dog Launching Lab 10/6/14By Lavanya A. Our Claim: When we tested our 3 rd variable adding 2 ketchup packets, We got very good results. This was.
How are sales advertised in different stores? In a clothing store, items are often marked with signs saying, “20% off” or “40% discount.” In a grocery.
Welcome Back to Math January 25, 2016 Today you will need:a pencil and eraser, your notebook, your tablet Math Message: Write an expression using letters.
Do Now Please write this in your math journal: Percent: the number of parts per 100. Percent Change: the ratio that compares the amount of change to the.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
If You Give a Mouse a Cookie Cause and effect relationships Stefanie R. Sorbet, M.ed.
WRITING FROM OBSERVATION ESSAY 2. TIME TO OBSERVE On your computer, type adjectives that describe the type of individual in the image that you see. Words.
Precision vs. Accuracy Word of The Day Quantitative vs. Qualitative Let’s Practice!
On Desk: 1. Pencil 2. Calculator 3. Math Journal 4. Learning Log Learning Log: 1. HW: p. 19, #10d, 13 p. 38, #1, 29, 30, Learning Check – Finish?
Investigation 5. Part 1  What do resistors do in circuits?
Updated for the 2016 Season. Agenda GRAL Handbook Personnel & Equipment Flow of Information Table Worker Duties.
EOG Strategies! Take your time and do your best… I know that each one of you can achieve success!
Excel is our friend. Really. Excel is a spreadsheet program used a great deal in business and in science. It can do a lot of things but we will mainly.
A student wonders if tall women tend to date taller men than do short women. She measures herself, her dormitory roommate, and the women in the adjoining.
Friday 9/15/17 Notebook Entry: Think about how your group worked together to design and build your boat. What do you think went well? What do you think.
HAVE + STH + DONE Causative have.
Personalize Practice with Accelerated Math
DO NOW Find the sum or difference ) -3 + (-4) 3) 7 + (-5)
Lesson Quizzes Standard Lesson Quiz
Presentation transcript:

1 Preliminary Cable Labor Estimate Howard Budd University of Rochester Rochester Meeting Dec

2 Attempt to estimate labor To estimate the amount of time it takes a person to build a part you need to know the number parts and amount of labor I started by tackling what I thought was the hardest, the post polishing labor time One the labor sheet, we record seperately prepolish and post polish tech time. However post polished cables are in various stages of production and so the number of parts is not defined Janina was working on T2K production so effectively all post polishing production for cables stopped, so there was no way to estimate post polishing production time

3 Estimating Labor time Continuation of the presentation given in Nov Using same technique as I think I can get the quickest answer Tech lists the number tasks he performs for each task and the amount of labor which is charged to the project With the number of tasks and time I can do a least square fit to determine the amount of time each task takes per cable I presented the after polish results in Nov I haven’t changed the calculation as Janina worked on t2k for a significant portion of Nov. Next page gives that result

4 Results for Fit for Post Polish Tech Time Post Polish time fit Preglue = 0.93 min Boot = 13.5 min Test Light Tight = 6 min Sort = 0.19 min Paint = 1.95 min Total so far = 22.6 minutes/Cable Same as presented 3 weeks ago

5 Before polish Labor time From the start of when Mike Herron joined us he was keeping track of what he did each day. This included the tasks and usually the number of times he did each task. He created information which I would evenually ask him for even though I didn’t ask at the beginning When there was a task which involved a large number times, such as reaming connectors, sometimes he didn’t record the number he did and sometime he gave a guess as the number he did. I took the guess when it was there as the number of times he reamed the connectors For assembling connectors he usually gave the exact number There were some tasks which didn’t take much time, in which he did not list a number I could use, so I just put in some small placeholder

6 Mike’s time Mike time= (all times minutes) Reaming =.61 Cut tube = 0.11 Assemble Cable = 6.9 Label Cable = Inspect before polish = 1 ( a placeholder) Inspect after polish = 1.19 Repair after polish = 1 ( a placeholder)

7 Heng Bao’s time Heng Bao started recording the number of tasks when I asked her on the week of Thanksgiving. She defined 4 tasks and there was 5 days of task. In addition the numbers of these 4 tasks she did were about the same each day. Hence, the time of each individual tasks from the fit is probably not meaningful However, the number of these 4 tasks is probably meaningful and probably gives a realistic about of time she is spending on each cable Heng Bao time = 9.91 minutes Total before polish = minutes Will probably try to look at the labor sheets to see if this is in the right ball park, but that will take a little while

8 Optical Cable QC Labor Time The QC files are written with the date and time in the name, Hence I can use this to estimate the QC labor time. The QC consists of Turn on LED and wait atleast 1 hour During this time the tech gets to be tested and clean the connectors with alcohol and blow them dry 3 direct measurements & 3 goldens Measure the cables 3 goldens and 1 direct Put the cables away

9 Cable QC labor We do a linear fit of number of cables measured vs the amount of time between the first direct measurement and the last direct measurement. The constant gives an estimate of the 4 direct measurements + the golden measurement. There is probably other inefficiencies in there The linear estimate Constant = minutes Time/cable = 3.63 minutes This time does not include the setup time of turning on the LED and cleaning the cables. Lets say this takes 1 hour. Hence Constant = minutes

10 Labor QC Estimate Need to set up a model for QC, could be wrong In order to understand the status of production better we are trying to group cables in lots of 50 Lets see what happens if we measure in groups of 50 + the 12 before booting cables. In addition we are tying to QC 25% of the cables before booting. This means that the time to QC 50 booted cables is *3.63 minutes = minutes 7 minutes/cable ( with an 25% measured before booting)

11 Other Labor Estimates We assume that Cables are brought to and taken from lab 7 in groups of 100. Each trip takes about 1 hour. 120 minutes/100 cables = 1.2 min/cable Putting Cables in boxes Dmitre put the Tracking Prototype cables in boxes and filled out the QC sheets in about 3-4 day for 760 cables Time = 4*8*60/760 =.4 min/cable

12 For a Grand Sum of The total is = minutes hours/cable In Project we have 1.39 hours/cable Note this is preliminary as in doing this I have found mistakes as I have done it. Note, no R&D has been taken place by the techs while recording their numbers, so clearly this does not reflect what happened during the tracking prototype

13 Status Cable numbers in this file need to be checked Will do it today with Janina Using these new time as weights we get we have made labor weighted 1853 cables 4379 to make (NOT including recent additions or our failures, need to put this in) Total cables to make = 2536 cables 2192 hours, 1.25 tech years to finish cables

14 Discussion I have done some of this yesterday, so it will need some checking Have not included additional cables or ODUs Cable Labor Janina can work probably 40% on mapping Mike 50% Hang Bao about 50% Not clear on Dmitre or Note 50% time of a day is not efficient on clear cable QC If this were put into effect we would need to continue to see if the predictions were born out.