Tile-HCAL Main 2.7.03 V. Korbel, DESY1 Agenda for Tile-HCAL main meeting, 2.7.03, 8:30-17:00 Introduction VK Status of TFS R&D ITEP/MEPhI M. Danilov LPI.

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
Some aspects of the DAQ for the Tile-HCAL Prototype Volker Korbel, DESY, for the CALICE/Tile-HCAL group Montpellier, France, November 2003 Hadr.
, DESY HCAL meetingG. Eigen, U Bergen/DESY2 Agenda of Worldwide Calorimeter & Forward Detector Project Day TIME TITLE OF TALK SPEAKER 14:
The Tile-HCAL Physics Prototype; concept, status, time plan Volker Korbel, DESY, for the CALICE Coll. Montpellier, France, November 2003 Groups involved:
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
J-C BRIENT LLR AGENDA CALORIMETRY and other subdetectors session J-C. BRIENT LLR Status report on the W-Si ECAL 30’ V. VRBA IP-ASCR Silicon pad sensors.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
V. Korbel, DESY , ECFA-DESY, Prague 1 New Results and further Plans for the TESLA Tile HCAL What did we establish so far ? Found: scintillators.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
June 4, Scint 2007 Scintillators and ILC 1 Scintillator calorimeters at ILC Jaroslav Cvach Institute of Physics ASCR, Prague CALICE Collaboration 1.Accelerator.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
Development of Digital Hadron Calorimeter Using GEM Shahnoor Habib For HEP Group, UT Arlington Oct. 12, 2002 TSAPS Fall ’02, UT Brownsville Simulation.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
J-C Brient-DESY meeting -Jan/ The 2 detector options today …. SiD vs TDR [ * ] [ * ] J.Jaros at ALCPG-SLAC04 ECAL ECAL tungsten-silicon both optionsHCAL.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Performance of Shower Maximum Detectors Saori Itoh (Shinshu Univ.) GLC calorimeter group (KEK,Kobe,Konan,Niigata,Shinshu,Tsukuba) Introduction Detector.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
1 CALICE Tail-Catcher Muon-Tracker(TCMT) Preliminary Test Beam Results Kurt Francis NICADD/Northern Illinois University For CALICE Collaboration ALCPG.
Test Beam Request for the Semi-Digital Hadronic Calorimeter
the CALICE test beam set-up and running experience
SiD Calorimeter R&D Collaboration
(My personal) CALICE Report
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
LC Calorimeter Testbeam Requirements
Presentation transcript:

Tile-HCAL Main V. Korbel, DESY1 Agenda for Tile-HCAL main meeting, , 8:30-17:00 Introduction VK Status of TFS R&D ITEP/MEPhI M. Danilov LPI A. Terkulov DESY A. Terkulov, S. Reiche Status of: --Photodetectors MA-PMs S. Reiche SiPMs E. Popova APDs J. Cvach --Preamps I. Polak, VK,... --Other topics V.K., HV/LV power supplies and voltage distribution --minical installations --LED monitoring, calibration The minical DAQ, overview Erika Garrutti First results from minical multi-cell studies with LED, cosmics N.N. The DESY electron test beam, resume from yesterdays meeting V.K. The program of the minical tests V.K. contribution of external institutes to analysis of test data...., discussion Continued >>>

Tile-HCAL Main V. Korbel, DESY2 Agenda for Tile-HCAL main meeting, II Program of the Japan ECAL tests at DESY V.K. Status of scint. Calo studies at NIU Vishnu Zutshi Future: speakers, volunteers...? --Simulation plans for simulation studies R. Poeschl programs available for simulation studies V. Morgunov --The status of PPT h/w V.K., all the stack structure, granularity studies, design active equipped detector volume which scintillator tiles to use which quantities of photodetectors to use materials to order!!!! Discussion,.... tail catcher N.N --VFE RO board, status of Dubna studies Igor Tiapkin --the DAQ h/w for the PPT beam tests Paul Dauncey --concepts of DAQ s/w for beam test global detector network ?.... Conclusions, next main meeting, V.K. proposed: , DESY??

Tile-HCAL Main V. Korbel, DESY3 DHCAL meeting at the Talks of: Jae Yu, Univ. of Texas at Arlington, GEM chambers for Digical, 3M, $/m 2 Vishnu Zutshi, scint. Digical >> today V. Ammosov, status of RPC, FE I. Tiapkin, Digital FE electronics J. Repond, FE for RPC type PPT, 6250 ASIC’s (64 channels each), FNAL VK, PPT stack structure, >> see today's meeting V. Gapienko, simulation studies, digital gas/scint. vs analogue HCAL J. Repond, simulation studies from L.Xia, (Argonne), radial shower shapes in gas and scint. >> all talks will be in the web these days... Next meeting of DHCAL end Oct. 03, day later Tile-HCAL main ? Some remarks: mean shower radius is larger in scint. than in gas Digical this comparisons are irrelevant for the analogue Tile-HCAL where we measure energy instead of pad patterns channels needed for 1x1 cm2 cell Digical (~ Euro) agreement found to use common PPT stack structure with fixed gap width 2 identical (?) stacks needed ( 6 t each) for 2 different test-beams nobody thinks so far on FE for semi-digital RO, 2-3 bit/channel?

Tile-HCAL Main V. Korbel, DESY4 What has been achieved so far ? TFS in production at DESY and ITEP: 117 TFS with SiPM’s in ITEP/MEPHI, scint from Vladimir 126/126 TFS from BC-408/SC-306(Protvino) diagonal curved grooves, machined at DESY 60 cm WLS-fibres are ready and polished BC-408 ready, TFS production is under way Protvino tiles machined in 2 weeks? first TFS studies in minical with BC-408 and 3MA-PMs now 36 pixels with 3/4 fibres to pixel in this month minical modification in 1-2 weeks, support bars for tilt to beam and crane handling increase gap width by 0.6mm (to confirm by measurements) minical electronic window ready, carries 3 MA-PMs and 36 pre-amps DAQ software is set up, needs data for improvements and optimisation Have plans/concept to put actual data on web for distributed analysis

Tile-HCAL Main V. Korbel, DESY5 What next? 14+(6) APD’s arrived at DESY, 20 more to be handed over in Prague APD test at CERN/CMS, , 20 APD’s only other 20 to test in 2 weeks in Prague or CERN? 25 pre-amp-chips from LAL arrive the ??? Pre-amp cards designed and ordered in Prague pre-amp cards (3 with 18 channels each) available end July need to order soon more super-reflector, new type?

Tile-HCAL Main V. Korbel, DESY6 APD-test at CERN With use of CMS test lab. and standard CMS preamps: gain vs bias voltage can we achieve a gain of 200 (500) ?? capacity vs bias voltage (in 25 pF range?) dark current vs bias voltage excess noise??? >> need quick answer whether we accept these APD‘s

Tile-HCAL Main V. Korbel, DESY7 Design of pre-amps for APD‘s 18 channel pre-amp cards 3 cards needed + 1 spare 2 mask for 9 APD‘s each, 5 mm sockets APD photo-cathode is 3x3 mm 2 4 holes in mask for mixing of 4 TFS-fibres + 1 hole for LED-fibre 5 masks to produce potentiometers to adjust bias voltage coupling capacitors to pre-amps (10 nF, 500V) socket for 18 channel special LAL-pre-amp line drivers to feed 30m LEMO cables to ADC’s

Tile-HCAL Main V. Korbel, DESY8 DESY test-beam, „Strahl 21“ energy 0.5 to 7 GeV, 1KHz (3 GeV) to ~1Hz (~ 7GeV) need vacuum beam line in test area to get proper >5 GeV ?? rates sufficient to get >10000 event samples spill structure: 1 MHz, 80 msec periods, repetition rate: 12.5 Hz beam availability in 2003/2004/2005 test in magnetic field? Which field strength? 2 solenoids, 1.0T free diameter ~70cm test in H1-compensator, 4T, free diameter? all information on beams, energy resolution, rates, operation,.... >>> folder of collected documents, copy in counting room groups interested: KEK/Tokio (Sept. 2003) CALICE ECAL (later this year?) Univ. of Texas, digital scint. (2004?) Most groups of RPC or GEM digital HCAL

Tile-HCAL Main V. Korbel, DESY9 can we use drilled center hole?

Tile-HCAL Main V. Korbel, DESY10 Manpower for minical test at DESY

Tile-HCAL Main V. Korbel, DESY11 The minical program

Tile-HCAL Main V. Korbel, DESY12 The minical program

Tile-HCAL Main V. Korbel, DESY13 KEK, the minical program purpose of the beam test at DESY in 2003 Tohru Takeshita of Shinshu University Yoshiaki Fujii, KEK (1) co-working with people who are interested in plastic tile calorimeter. (2) to test the performance of the direct attached APD shower-max detector by electron beams. Especially the position resolution. (3) to test the fine segmented pre-shower detector whose read out is via optical fibers by electron beams. Especially the position resolution. (4) to train young students having experienced at DESY. (5) we need your detector to measure the energy behind ours. (6) would like to use the Tile-HCAL DAQ

Tile-HCAL Main V. Korbel, DESY14 KEK, the minical program Pre-shower, A and B: 2x20 strips, 20x1x1cm 3, RO with MA-PMs 2x20 strips, 20x1x1cm 3, RO with 5x5mm 2 HPK APD fibre grooves in centre of strips 3M radiant mirror film

Tile-HCAL Main V. Korbel, DESY15 Studies for a CALICE HCAL ECAL HCAL 1.8 coil Tail catcher

Tile-HCAL Main V. Korbel, DESY16 Studies for a CALICE HCAL, some details Single absorber plate handling Adjustment bolts with distance disks Support frame

Tile-HCAL Main V. Korbel, DESY17 The active layer Questions for PPT: real overall gap width: 9.0 +/-0.5mm? thickness of insertion frame: 8.5cm? x1.0mm steel for frame +18mm abs? stiffness requirements? material of insertion frame, steel? less Fe in absorber, more in cassettes? e.g. 2x2.0mm steel walls and 16mm abs? size of individual frames, ~1 m 2 ? 29 layers minical 3x3 tiles, 5x5cm2 each thickness: 5mm tile, 1mm fibre, 0.5mm tolerances 3mm aluminium Cassette for minical

Tile-HCAL Main V. Korbel, DESY18 Energy weighting optimisation; Simulation study to set to limits to reach: ----split each calo tile in 2 tile-buffers, one for hadronic energy fraction, other for elm. fraction 1. Reconstruct energy without weighting, just sum all tiles With weighting of elm. fraction, optimise weighting to get best energy resolution (  ) of event sample 3. Add elm. and hadr. energy of cells (2 tiles behind each other) try to find cells with dominant elm. contribution, try amplitude dependent weighting, opt.  of sample 4. Compare with 2., optimise identification of “cells to weight” (containing sizeable fraction of elm. energy) 5. Vary cell granularity (1-4 tiles) find optimum  of sample 6. Vary tile sizes, start again at 3.

Tile-HCAL Main V. Korbel, DESY19 Tile-HCAL, Prototype channels, inner core:

Tile-HCAL Main V. Korbel, DESY20 Studies for a CALICE HCAL PPT: inner and outer active volume? tile granularity inside? cell granularity inside ? coarse tile/cell granularity outside ~ 20*20*x cm 3 ?

Tile-HCAL Main V. Korbel, DESY21 Studies for a CALICE PPT-HCAL Questions to discuss/fixe: material of absorber plates: steel stainless steel flatness requirements, costs gap width gap tolerances gaps adjustable? cassettes, material, sizes? cassette thickness vs absorber plate thickness final construction of stack module 1 or 2 modules for different test beams? Who builds stacks? test in magnetic field? Which field strength? Probably mini-minical in e-beam Weight of 38 abs. plates is 6 t !

Tile-HCAL Main V. Korbel, DESY22 Outlook Final Tile-HCAL concept August 2003 ? Here we are VII, 2003 Here we are VII, 2003 HCAL prototype to be built for I, 2004 HCAL prototype to be built for I, 2004 Minical Prelim. design Hard work to do soon: simulation/reconstruction studies HCAL stack prototype design/construction specification of TC needed, # of layers,cells decide on # of photodetectors: APD’s,Si-PM’s...