27.5.04TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
TRD Production at GSI Joerg Hehner TRD Collaboration Meeting Bucharest
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Supermodule Space-Frame Integration Backpanel L6C1, L0 Bernd Windelband, Uni Heidelberg ALICE-TRD status meeting, at KIP.
TRD ROC Status Clemens Adler TRD Status Meeting TRD ROC Status.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
Test Results Of Gain Uniformity Measurements Heidelberg Chamber maximum deviation [%] L1C0#001 33,45 L1C0#002 25,94 L1C0#017 24,41 L2C0#001 16,76 L2C0#002.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Scanning Tunneling Microscope How to use the STM Developed by Malory M. Peterson, Summer 2006 Nanotechnology Grant National Science Foundation #
TRD Collaboration meeting GSIClemens Adler First TRD Production Chambers Production Tests Results Documentation.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
TRD Collaboration meeting GSIClemens Adler TRD Production in Heidelberg Manpower/Resources/ Timescales.
TRD Status meetingClemens Adler TRD Production Status -Material -Tooling -Timescale.
TRD Status meeting GSI Clemens Adler TRD ROC Status.
TRD Status meeting IKFClemens Adler TRD ROC Status -Dubna -Bukarest -GSI -Frankfurt -Heidelberg.
8.7.04TRD Status meeting HdClemens Adler TRD ROC Status.
TRD Collaboration meeting GSIClemens Adler First Production Chambers Production/tests/results.
Technical Forum Alice week Clemens Adler Transition Radiation Detector Status Participating Institutions: Athens University, NIPNE Bukarest, JINR.
TRD Status meeting HeidelbergClemens Adler Chamber production Production status/ Material status.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Production NIPNE Completely finished and tested: L1C sent to GSI L2C sent to GSI L2C sent to GSI L3C Total: 36 =
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Engineering Design Review for TRD-Readout Chamber
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Building a clock PART 1: The Body. Gathering materials  The wood that you will be using is called Maple. You can identify it by knowing that it is: Heavy.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Construction of “Curio” style Cabinet by Miguel Del Real.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
WP3_Bham; 10July 2014; John Wilson1 Gluing: more investigations (Simon and Sam) New clamping method provides a good base for systematic studies. Sketch.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Diamond Radiator Fabrication and Assessment Brendan Pratt Fridah Mokaya Richard Jones University of Connecticut GlueX Collaboration Meeting, Jefferson.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Ork Watch Tower – First Floor Measurements may vary on your printer
Electric Car Project Riley Walz, 7-7.
Module/Ladder Assembly
Presentation transcript:

TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status

TRD Status meeting GSIClemens Adler Production Status George and Petre from Bukarest were at Hd for 3 weeks: –We built 2 complete chambers + Glued 3 Frames + half wired 2 chambers Problems encountered: –Everything, especially: –Wire Winding –Padplane gluing

TRD Status meeting GSIClemens Adler Problems (new): Winding Winding machine: –Frame vibration: Cathode: wire jumps off Meteor Anode: wire breaks Currently: Brake on wire roll+slow velocity works. Control Problem: –At end of winding, winding machine does not stop. (happend twice) ->under investigation

TRD Status meeting GSIClemens Adler Problems (cont.): Padplanes gluing Scheme so far: –Roll on glue onto Fischer Panel Problem: always unglued areas. Same Problem reported by Oleg

TRD Status meeting GSIClemens Adler Padplane glueing (cont.) Different approach: Result: very flat and glued everywhere. +less glue needed

TRD Status meeting GSIClemens Adler Padplane gluing (even more) Back Panels display a warping after gluing the Padplanes: measured on padplane side: up to 600 microns lower in the middle than at the edges This behaviour is observed on 3 different Panels. But: gain uniformity is OK. Maybe no Problem, but watch it.

TRD Status meeting GSIClemens Adler (old) Production problems L-profiles are bent more than expected -need additional clamps on gluing table. After gluing to Radiator: L6C1 Chamber: <0.2 mm flatness: -> seems to be no Problem, when care is taken during gluing process (use additional clamps on gluing table). Profile Production: L-profiles: keep inhouse Front profiles: Investigate outside company

TRD Status meeting GSIClemens Adler Wiretension machine Prototype at Hd, working, but still some minor glitches to work out.

TRD Status meeting GSIClemens Adler Production To Do Last meeting: Second Video measureing table need rails and camera holder. Produce wire ledge gluing tool H.Daues‘ design for TPC Design distance ledge gluing tool Current status: Standalone camera holder, new lens needed Not done Done for L1/2C0 types

TRD Status meeting GSIClemens Adler Production Sites Dubna: 2nd transport is almost prepared (some Padplane problems induced a slight delay) -> Material for 12 L1C0, L2C0 Chambers Bukarest: 1st material transport underway. Mihai &Co. is heavily preparing tooling (Glass tables, Lifting device for wire frames, X-Y table for X-ray source etc).

TRD Status meeting GSIClemens Adler Material Status L2C0 Padplanes: –significant amount of broken traces (~50% of PP of type 1) –still lots of shorts on padside L6C1 Padplanes: –arrived last week –middle piece is not machined to specs (>20% of PP unacceptable) L1C1 Padplanes: –arrived last week –middle pieces fit very nicely Optiprint visit in 1 week to discuss quality issues L-Profiles: 24 x C0 shipped to Dubna, 8 x C0 to Bukarest (~37 x L5/6C1 ready) next type: L1C1 Front Profiles: 18xL1, 16xL2 to Dubna 4xL1, 4xL2 to Bukarest L1 in production (16 x L6 ready)

TRD Status meeting GSIClemens Adler Material in Graphs L-Profiles: Front-Profiles: Status

TRD Status meeting GSIClemens Adler More issues Padplane test system will be moved to Frankfurt next week Chamber test setup near final –Rainer will prepare test document