A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
1 MICE TARGET STATUS 23 rd February 2007 CM17 - CERN Paul J Smith University of Sheffield.
MICE MICE Target Mechanism CM38 – Napa Valley P J Smith on behalf of the MICE target team.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Chris Booth Sheffield 29th March 2006
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
MICE Target Report Video Conference 29/11/07
Presentation transcript:

A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield

Target One Installed in ISIS – 25 th August Gate Valve opened, target and frame controls checked out – 27 th August Delays adjusted, readout calibrated – 2 nd & 3 rd September 2

Calibration run with frame raised. Frame lowered, preliminary depth & delay scans to find edges of the beam. Problems with unconnected beam-loss cable rectified. Depth adjusted to get various beam-loss values 50 to 500 mV – see plots. Data taken with beam-line magnets on and counters active. Total ~6000 pulses taken. Finished with calibration run. Target One – 5 th September 3

4 Minimum Distance from Beam Centre Exploring the beam edges Increasing beam loss Calibration run

Studies of beam profile around injection and “bloom” at ~2 ms. Depth & timing scans to optimise beam loss in last 1 ms (≥60%). Studies at increased stator voltages (±125V, ±135V c.f. nominal ±115V) to optimise clearance at next injection. Beam-losses mV delivered for systematic particle vs. beam-loss studies (Adam). Lengthy run at uniform 500 mV for beam-line studies. Another ~6000 pulses taken. Target One – 6 th September 5

6 Calibration run

7 Very preliminary, uncalibrated results from Adam! Arbitrary Units!!

Target performed flawlessly over both days. Total 11,803 actuations over weekend. Target One – 7 th September 8 Access this morning. P Hodgson & D Findlay examined inspection port. D Findlay very happy – “No evidence of any dust”. Will inspect again after further 15K actuations. Permission to run for total 50K in start-up period.

Nominally identical to Target One. Known to have slightly bent shaft – distorted during welding. Assembled in clean room – Sunday 23 rd August. –“By hand”, just as free in bearings as Target 1 Installed in R78 – Tuesday 25 th Electronics commissioned, drive tested – Wednesday 25 th Immediately revealed some odd effects: –Distinctly noisier than first drive –Significantly less reproducible behaviour – see plots Thorough check of electronics & optics Thursday 26 th. –No problem revealed. 9 Target Two – Demonstrator

Returned to clean room, dismantled & inspected Friday 27 th. – Movement had “sticky” feel by hand. –Lower bearing significantly scratched. Transferred to metrology for detailed microscopy & measurement. T2 Min depth 10 Target Two – Continued

Lower bearing Measurement & documentation still in progress. Preliminary conclusions: –Wear on DLC coating of bearings (after <1K actuations!). –No wear on shaft, but pick-up of DLC. –Possibly due to excess pressure due to distorted shaft. 11 Target Two – Continued

Target 2 – Way forward? New shafts and bearings to be produced. New way of fitting stop, to avoid welding distortion. Assemble ~9 th October & re-test. (See Ken’s schedule slide.) Results well before end of October ISIS shutdown. In addition, build “Target 3”. –Same shafts as targets 1 & 2 –Same geometry bearings –New materials/coatings to avoid DLC on DLC problems - Start with Vespel –Schedule indicates assembly by Christmas just possible! 12

Conclusion Target One is running very well on ISIS. The ISIS beam profile has been mapped, and target settings determined for various beam-losses. Particles have been produced reliably for early detector and beam-line commissioning. The target is performing consistently and stably. An operations manual exists, and non-target experts are starting to learn how to use the target controls! Target Two is delayed, but we have a way forward. ISIS have agreed a programme of 50K pulses during the start-up, even without the demonstrator. 13