E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.

Slides:



Advertisements
Similar presentations
Insertion Devices and Magnets GroupJ A Clarke, Daresbury Laboratory Undulators and Wigglers for Future Linear Colliders Jim Clarke ASTeC Daresbury Laboratory.
Advertisements

GSI – 13 March – 2004 ELISe collaboration Photonuclear Reactions at Storage Rings V. Nedorezov Institute for Nuclear Research RAS, Moscow,
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
K.T. McDonald DoE Review Aug. 10, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
5 th Rencontres du Vietnam - Aug. 7, 2004 Polarized Positrons…E166 A.W.Weidemann 1 Introduction (What, who) Motivation (Why) Experiment and Polarimetry.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
K.T. McDonald DoE Review July 29, E-166 Experiment E-166 is a demonstration of undulator-based polarized positron production for linear colliders.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard.
Undulator-Based Production of Polarized Positrons Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University.
E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Magnets/Beamline Equipment/ Instrumentation J. C. Sheppard.
Left: The polarization of the undulator radiation as a function of energy. Right: Calculated positron longitudinal polarization as a function of energy.
NLC - The Next Linear Collider Project Sheppard/Pitthan June 26, 2015 Towards an Undulator Based NLC Positron Source Towards an Undulator Based NLC Positron.
K. LaihemE166 collaboration LCWS06 Bangalore March 12th 2006 The E166 experiment Development of a polarized positron source for the ILC. Karim Laihem on.
Undulator-Based Production of Polarized Positrons An experiment in the 50 GeV Beam in the SLAC FFTB E-166 Undulator-Based Production of Polarized Positrons.
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) K.T. McDonald, J.C. Sheppard, Co-Spokespersons SLAC Experimental Program Advisory.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
NLC - The Next Linear Collider Project Rainer Pitthan Polarized Positrons A Close Look at Fukuda et al. There is much to be learned from the long effort.
Higgs & Precision Electroweak Group Summary Rick Van Kooten, Indiana University, LC Workship, Cornell, 16 July 2003 Berger et al., hep-ph/ (published)
EPAC June 2003 Undulator-Based Production of Polarized Positrons A proposal for the 50 GeV Beam in the FFTB E-166 Undulator-Based Production of Polarized.
NLC - The Next Linear Collider Project Sheppard/Pitthan July 14, 2015 POWER Meeting June 8=9,2002 Durham, England POWER Meeting June 8=9,2002 Durham, England.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
M. Woods (SLAC) Beam Diagnostics for test facilities of i)  ii) polarized e+ source January 9 –11, 2002.
EUROPE. September 08 to 11 September 12 to 14 September - 15.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Linear Collider Positron Source System Integration Jim Clarke, James Jones, Ian Bailey, Leo Jenner, James Rochford,Alexander Mikhailichenko, John A. Osbourne,
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
1 Options for low energy spin manipulation Ken Moffeit, SLAC 2009 Linear Collider Workshop of the Americas 29 September to 3 October 2009 K. Moffeit, D.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Damping Rings and Sources Summary- Cornell ALCPG meeting, July George Gollin, Univ. Illinois, 7/16/03 1 Damping Rings and Sources Summary Cornell.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
Positron Production for Linear Colliders Vinod Bharadwaj Ronkonkoma, Sep 9, 2003 Positron Production for Linear Colliders Linear Colliders Conventional.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
Undulator-Based Positron Production in the Final Focus Test Beam (E-166) The International Polarized Positron Production Collaboration K.T. McDonald, J.C.
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Polarized Positrons at the Jefferson Laboratory Idaho State University, Idaho Accelerator Center, Jefferson Lab, LPC Clermont-Ferrand, LPSC Grenoble, Old.
K. Floettmann KEK, Nov , 2004 GAMMA BASED POSITRON SOURCE OPTIONS FOR ILC Klaus Floettmann DESY.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Summary of the workshop on polarized positron source based on Compton back scattering L. Rinolfi CERN POSIPOL Workshop CERN April 2006 POSITONS.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Radiation from electrons passing through helical undulator or colliding with circularly polarized laser wave V.Strakhovenko Budker Institute of Nuclear.
J.C. Sheppard, SLAC Americas Region September 28, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford GigaZ and Polarization Upgrade Discussion.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Dollan, Laihem, Lohse, Schälicke, Stahl 1 Monte Carlo based studies of polarized positrons source for the International Linear Collider (ILC)
Positron Source for Linear Collider Wanming Liu 04/11/2013.
CsI(Tl) Calorimeter and status of the E166 experiment E166 experiment CsI ( Tl) calorimeter construction. Test beam results vs. Geant4 simulation Schedules.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
A.P. Potylitsyn, I.S. Tropin Tomsk Polytechnic University,
Progress with Spin Tracking in GEANT4
Helical Undulator Insertion Device The heLiCal collaboration
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
E166 - LEPOL - Low Energy Positron Polarimetry for the ILC
End Station Test Beam (ESTB) at SLAC
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
SuperB Workshop Frascati March 16, 2006
UPDATE OF POSITRON PRODUCTION CODE KONN
Presentation transcript:

E166 Collaboration About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) About 45+2 members from 16+1 institutions from all three regions (Asia, Europe, the Americas, and Daresbury) John Sheppard, Kirk McDonald (co-spokesmen) John Sheppard, Kirk McDonald (co-spokesmen) E166: Polarized Positrons for Future Linear Colliders Kirk T. McDonald & John C. Sheppard, Co-spokespeople

2 Overview of E166 Demonstration experiment for production of polarized positrons Demonstration experiment for production of polarized positrons In the FFTB at SLAC with 50 GeV, e - /pulse, 30 Hz In the FFTB at SLAC with 50 GeV, e - /pulse, 30 Hz 1 m long helical undulator produces circular polarized  ‘s 0-10 MeV 1 m long helical undulator produces circular polarized  ‘s 0-10 MeV Conversion of photons to positrons in 0.5 rad Ti-target Conversion of photons to positrons in 0.5 rad Ti-target Measurement of polarization of positrons by Compton transmission method Measurement of polarization of positrons by Compton transmission method

3 Status of E166 Negotiating for June, 2005 and September, 2005 runs in FFTB Negotiating for June, 2005 and September, 2005 runs in FFTB All equipment at SLAC and installed in FFTB tunnel All equipment at SLAC and installed in FFTB tunnel except Undulator which is in final alignment at SLAC (800  m id tube aligned to 700  m id protection collimator) except Undulator which is in final alignment at SLAC (800  m id tube aligned to 700  m id protection collimator) Ready for power system tests and beam Ready for power system tests and beam