HARPS-NEF PDR December 6 & 7, 2007 1 HARPS-NEF Program Project Manager Tim Norton.

Slides:



Advertisements
Similar presentations
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
MAROON-X: An instrument for identifying another Earth
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
Rachel Weaver Program Manager Maryland Energy Administration
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
Server Virtualization: Navy Network Operations Centers
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
Hospital Facility Managers Association of Delaware Valley.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
-1- Project Name Project Name Weekly Project Report Project Manager : __________________ Date : ___________________.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Revisiting the study Composition of the congregation – More than 20 years = 27% – years = 31% – 6-10 years = 17% – 0-5 years = 24% High participation.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
COSMO Large Coronagraph Preliminary Design Review
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Update 05/09/16. AGENDA  Re-cap of 5/4 Council Approved changes  Staff’s Alternate Budget Proposal  Goals  Financial details  Recommendations – pending.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Commissioning Planning
Open Road Tolling Procurement Update
Camera PDR/CD1 Planning 19 September 2008
Jim Fast Pacific Northwest National Laboratory
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
A New Quality Program for the Water Industry
Operations Update 15 November 2012
Cohasset Town Hall Renovation Advisory Committee (THRAC)
Capital Budget Development
United States Tennis Association “A Plan for Success” Public Facility Funding Program Fiscal Years
X-ray Pump-Probe Instrument
Processing Permit Requests within Limited Access Rights-of-way
User instrument policy
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Background Information P.Napier
Rod Zivkovich Executive Director of Finance and Support Services
The Common Shielding Project
Introduction and Overview
PSS verification and validation
Instrument Overview Larry Springer HMI Program Manager
Richland Creek Water Supply Program Program Update
MAORY Status of the project
Presentation transcript:

HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton

HARPS-NEF PDR December 6 & 7, HARPS NEF Project Teams Harvard University –Funding through the Harvard University Origins of Life Initiative –Overall Instrument Responsibility at the Center for Astrophysics Harvard College Observatory Smithsonian Astrophysical Observatory Geneva Observatory –HARPS Design & Background –Science and Engineering Resource Contributor –Major Funded Hardware Contributor ING’s William Herschel Telescope –ING Facility & Operations as agreed thru MOU

HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Schedule

HARPS-NEF PDR December 6 & 7, Schedule Comments Fast schedule to Build/Assemble/Test relies on significant reuse of design Orders MUST be placed in January with expected 9-12 month lead times for gratings/grisms/optics Procurements before CDR of items with 4-6 month lead times (i.e. major machining) Installation at WHT requires early facility agreement/processing Design verification requires early prototype and/or field work ( i.e. fiber run/rotator)

HARPS-NEF PDR December 6 & 7, Budget Overview Commitment from Harvard Geneva Proposal Accepted for Hardware Funding Status of Major Capital Expenditures –CCD order placed with E2V –Cryostat Build at ESO in Process, Model Delivered –Calibration Light Box Fabrication in Process –RFQ’s submitted/received responses: Echelle Grating (ASz prepared Spec & RFQ) Cross Dispersion Grism (ASz prepared Spec & RFQ) Collimator Parabola (ASz working alternate vendors) Camera Optics (RFQ updates in process)

HARPS-NEF PDR December 6 & 7, ING/WHT Facility Questions Facility Modifications and Installations: –What does the ING/WHT require in terms of building modification processes, documentation, building code review, inspection or other? –Does the ING/WHT recommend we use local contractors or can we make arrangements for staff support? Site preparation, electrical preparation, general labor for construction services Prototype of Fiber Routing –Will access to the WHT be available for prototyping? –When is the best time (least impact to WHT operations)?