Target meeting1 Positron Target Prototype - Status Leo Jenner.

Slides:



Advertisements
Similar presentations
Target Wheel Prototype Progress LC-ABD / LCUK – Apr Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Advertisements

A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
Ian Bailey Lancaster University / Cockcroft Institute Baseline Target Prototype Status TILC09, Japan.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Mike Jenkins Lancaster University and The Cockcroft Institute.
Jan '09Positron Target Status1 Positron Target Prototype - Status Leo Jenner.
Prototype Status. 2 Status Update Safety Cage arriving soon Safety Cage arriving soon Torque transducer up and running Torque transducer up and running.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
PH Senior Physics Colloquium I Fall 2008 Instructor: Max Seel Office: Rekhi 311, , Tue. & Thur. 3 p.m, 138 Fisher.
Job Survey Results For MSW Graduates University of Michigan School of Social Work Office of Student Services.
Status of the HELICAL contribution to the polarised positron source for the International Linear Collider The positron source for the International Linear.
06 Apr 09Target Prototype Metting1 Positron Target Prototype – Hardware Status Leo Jenner (T-25)
STFC Technology Target wheel eddy current modelling James Rochford On behalf of the Helical collaboration.
Mon Oct 27LC-ABD, Dundee1 Positron Target Prototype - Status Leo Jenner.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
1 Thrust from the engine Friction Will the car speed up, slow down or stay at constant speed?
Kinetic energy Derivation of kinetic energy. Kinetic Energy 2 starting equations F = m x a (Newton’s 2 nd law) W = Force x distance.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Eddy current modelling for ILC target ILC meeting 31 st Jan- 3 rd Feb 2007 IHEP-Beijing James Rochford.
Crossing Night 1 min 2 min 5 min 10 min each time, 2 persons share a torch they speed of slower person Target: all cross the bridge.
AP Calculus Unit 1 Day 1 What is Calculus?. Calculus is the study of CHANGE There are 2 Branches: 1)Differential Calculus 2)Integral Calculus.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
Day One: ◦Strength/Wind Speed:  1. ◦Direction:  2. ◦Area Warning Status:  3. Action Plan: ◦4.
aav t v = aav = average acceleration; v = change in velocity;
Acceleration. average acceleration The average acceleration of an object is defined ratiochange in velocity to be the ratio of its change in velocity.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
Photon Conversion Target Wheel Eddy Current Simulations - Update Ian Bailey and Ayash Alrashdi Lancaster University / Cockcroft Institute.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
YOSEMITE BY ARSAL.
A Positron Target Concept for the ILC
FTP & LTHR Test Start in 1:00 Next This Session:
Positron Capture Simulations: Runge-Kutta vs Boris
Warm Up Solve by factoring. x2 + 10x + 25 x2 – 16x + 64 x2 + 18x + 81.
Progressive Shift Parameters Worksheet
$$$ DEAL OR NO DEAL $$$.
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Measuring Motion Chapter 12, Section 1 Part 1.
♠ ♠ ♠ ♠ ♠ ♠ ♠ ♠ Objectives القرص الدوار والدولاب مجلس أبوظبي للتعليم
30 miles in 1 hour 30 mph 30 miles per hour
Measuring Motion Chapter 12, Section 1 Part 1.
Measuring Motion Chapter 12, Section 1 Part 1.
Reoch-Zonneveld Workout
ASSESSMENT 11 assessment groups should inspect
Vertex Form.
How to Add temperature & plug/monitor info?
Measuring Motion Chapter 12, Section 1 Part 1.
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Will the car speed up, slow down or stay at constant speed?
Reoch-Zonneveld Workout
1 min each time, 2 persons share a torch they speed of slower person
Reoch-Zonneveld Workout
LINQ to SQL Part 3.
Reoch-Zonneveld Workout
Motion Review for Egg Car Calculations
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
CHESS energy, 9x6 electrons and positrons, coupling tests
Reoch-Zonneveld Workout
Reoch-Zonneveld Workout
Presentation transcript:

target meeting1 Positron Target Prototype - Status Leo Jenner

target meeting2 ILC

target meeting3

4

5 rpmB fieldTT ? calc calc

target meeting6 speedav t1std t1av t2std t2av speed2std av speed2d v / v (%) (rpm)(Nmm)

target meeting no fieldfieldcarmen carmen + friction carmen + field friction av max max eye min eye average

8 B-field Immersion Speed 2000 rpm 1500 rpm 1000 rpm 500 rpm 8

9target meeting