A Handful of Topics. P200 Constituencies We re-negotiated our partnership agreements in CY2009 Long-standing partners JPL and Cornell are continuing as.

Slides:



Advertisements
Similar presentations
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Advertisements

Directions in Project Planning April 11, Measures of Plan Quality Timeliness – are the plan dates current and realistic, with activities starting.
August 2 and 3, 2010 ReSTAR: The Origins of KOSMOS David Sprayberry.
1 ICCHE Annual Conference Higher Education Update Dr. Alan Phillips Executive Deputy Director Illinois Board of Higher Education February 7, 2014.
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
Chandra Users’ Committee, Oct 2006 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 8  725 submitted proposals  *6.4 oversubscribed.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
Instrumentation on OIR Large Telescopes – A Case Study S. R. Kulkarni Caltech Optical Observatories.
Software Compliance: Are we there yet? Looking back and moving forward.
Capability Maturity Model
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
1 m – APOGEE Feed Jon Holtzman Diane Feuillet (NMSU)
OIR C OMMITTEE S TATUS R EPORT 2 nd face-to-face meeting Oct , 2014 Beckman Center of the National Academies Irvine, CA.
W. M. Keck Observatory Subaru Users’ Meeting
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
N By: Md Rezaul Huda Reza n
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
SSWG Meeting #15: May 2006, Cape Town SSWG #15: 7 & 8 May SSWG Agenda: Sunday 7 th May 1.Welcome. Minutes of Previous meeting. Matter arising (David)09:00.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
LCOGT: Where Are We? Where Are We Going? Tim Brown Mar 18, 2010 Eventful Universe, Tucson, AZ FTN, Rob Ratkowski.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
1 Phase 2 Grant Renewals - March A- Overview A.1- Performance-based Funding Y1Y2Y3Y4Y5 Proposal Initial Grant Agreement(s)Extension of Grant.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Foxconn ESS Dec Interlock Partner.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
JACTest Monitoring Center T-10 PB Ad Hoc Task Force Report to the Mack Test Surveillance Panel September 10, 2004 Richmond, VA.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Hiroshi Subaru Telescope Subaru Instruments Status 2008 SUBARU Users’ Meeting : 2009/01/16 NAOJ, Mitaka SUBARU Instruments Status & Prospects.
Role of FOCAS Takashi Hattori (as FOCAS SA) 12/9/2014.
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
Market Trials Update NATF March 2,
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
Generation Adequacy Task Force Update to WMS
Demand Management Overview Title Slide
Proposed Bay TMDL Schedule
GEOG205: Course Objectives
Service Delivery and Support Program Update – Jan. 31, 2018
EVLA Advisory Committee Meeting
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
XRN Nov 19 Release - Status Update
Presentation transcript:

A Handful of Topics

P200 Constituencies We re-negotiated our partnership agreements in CY2009 Long-standing partners JPL and Cornell are continuing as partners (for five and three years respectively) New partner NOAO joins at 1/16 share with particular interest in (single-object) spectroscopy. Time for NOAO participation coming from decreasing Cornell commitment Oxford partnership ongoing…

P200 Instrument Usage/Trends P200 Instrument Usage for 2010A and 2009B Majority (~ 55%) for spectroscopy AO usage increase: expectation of bench removal in 2010A P night survey in 2011 – 2013 inclusive Structural decrease in OSWIFT with LGS decommissioning Instrument2010A (153n) 2009B (174n) DBSP41 (27%)60 (35%) TSpec45 (29%)49 (28%) LFC24 (16%)18 (10%) WIRC7 (5%)8 (5%) PHARO18 (12%)16 (9%) P16407 (5%)9 (5%) CWI6 (4%)0 OSWIFT6 (4%)14 (8%)

Instrument Usage/Trends (Cont) Constituency Trends: –AO Usage PRESENTLY tilted toward JPL constituency; this changes structurally with the 99- night P1640 program –CIT (80%), Cornell (100%), & NOAO (100%) constituencies tend toward spectroscopic use –Concern: no non-Oxford participation in OSWIFT science (1 CIT night in 09A) Instrument2010A (153n) 2009B (176n) DBSP41 (27%)60 (35%) TSpec45 (29%)49 (28%) LFC24 (16%)18 (10%) WIRC7 (5%)8 (5%) PHARO18 (12%)16 (9%) P16407 (5%)9 (5%) CWI6 (4%)2 (1%) OSWIFT6 (4%)14 (8%)

TSpec Update TSpec is an important near-IR spectroscopic capability at P200; prominent nationally (i.e. NOAO listed as instrument to emulate at Kitt Peak – NOAO Town Hall DC) TSpec has had its share of electronics problems – which appear to be behind us – thanks to GustavoR’s extensive support in 2009 A significant number of user reports of TSpec control software crashed (guider GUI) JHickey & MBonati have made simplifications to guider GUI; in recent TSpec (e.g. late Dec) runs software has been considerably more reliable TriSpec & TEDI Installation at P200 cass Jan 2008

COO Operations SW Engineer However, we anticipate there are still TSpec issues to iron-out, so… Creating campus position to focus on Palomar operations instrument control software support (co-located with OIR) Initial concentration on TSpec and DBSP control software Job ad submitted to PMA this week; expect start date in April.

2010B Solicitation Dates 15 Feb – Call for engineering proposals 26 Feb – Engineering proposals due 8 March 2010 – Science solicitation released 2 April – Science proposals due 19 April – TAC meeting 3 May – CIT inputs due to WMKO

J.Zolkower P200 Mirror Support Refurbishment Plan 8 Mirror Support Assembly Russell Porter Illustration Gimbal Assembly Compound Lever Assembly 36 Mirror Supports 39 Bearings / Support Assembly ~ 1400 Bearings in total Russell Porter illustration

J.Zolkower P200 Mirror Support Refurbishment Plan 9 u In mid-2007 severe image distortions were experienced for an extended period of time. u Significant improvement was observed after vigorous exercising of the mirror supports in lateral mode. Mirror Support Background & Recent History Image obtained by Pharo in while the A.O. system DM was in a flat state, Aug AO deformable mirror phase map Aug

J.Zolkower P200 Mirror Support Refurbishment Plan 10 Recent image quality issues Image from LFC focus loop Dec 2, 2008 More recently, occasional bad images are reported by telescope operators that are resolved by moving the telescope to a different place in the sky and then returning to original target.

J.Zolkower P200 Mirror Support Refurbishment Plan 11 Service Plan Time Allocation u 1994 Process Flow (25 assemblies serviced) –Total Time: 18 days; 14 working; 4 non-working –Service rate: 1.78 assemblies / working day –No Set-up or test noted u 2010 Option 1 Process Flow (36 assemblies serviced) –Total Time: 41 days; 31 working; 10 non-working –Service rate: 1.33 assemblies / working day (set-up & test not incl) –4 days for set-up & test u 2010 Option 2 Process Flow (36 assemblies serviced) –Total Time: 33 days; 25 working; 8 non-working –Service rate: 1.71 assemblies / working day (set-up & test not incl) 2010A service program: Reserved 5 weeks Jan 24 - Feb 28 - two weeks of shared risk observing time is scheduled at end of five-week period. -Shared-risk observers identified