Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
Unit-3 Tuned Amplifiers
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Electrical & Control Power Supplies Trevor Hartnett.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
An understanding of the complex circuitry within the op amp is not necessary to use this amplifying circuit in the construction of an amplifier.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
1Date 2004 Strictly Confidential Remote Sense (extracted from a presentation by Robert Kollman)
Intermediate Course (3) Technical Basics - 2 Circuits Karl Davies East Kent Radio Society EKRS 1.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
AT-MEL-MI Hardware Commissioning Review, , Suitbert Ramberger 1 The Normal Conducting Magnets and their Circuits Suitbert Ramberger, AT-MEL-MI.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
1 Chelmsford Amateur Radio Society Intermediate Licence Course Murray Niman G6JYB Slide Set 4 (3) Technical Basics -2: Circuits Chelmsford Amateur Radio.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Report Technical Director Storage-Ring-Installation Completed
MICE RF System Power Supplies, Control and Monitoring Status report
ProtoDUNE SP – Slow control Status
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
SPS cryogenic proximity equipment and SM18 validation
RF operation of REX-ISOLDE
Linac4 RF System Operation for the Reliability Run in 2017
Constant current charging circuit for power pulsing
TUTORIAL An inverting amplifier circuit using Op-amp 741 IC, a feedback resistor, Rf = 95 kΩ and input resistance, Rin is used in a feedback oscillator.
Presentation transcript:

Status of the MICE Amplifier Refurbishment at CERN Suitbert Ramberger & Maurizio Vretenar, CERN, AB-RF-LR

MICE Amplifier Refurbishment Before: After: Acknowledgement: Jean-Michel Giguet, Filippo Caretti, Vladimir Bretin, Jose Marques-Balula

MICE Amplifier Refurbishment Refurbishment is completed: Drawings / Documentation Collected Input Cavity and Line Rebuilt, Silver Plated, Installed Output Cavity and Line Rebuilt, Silver Plated, Installed Tuning Mechanisms Refurbished RF Connectors Prepared HT Capacitors Rebuilt Filament Transformer Installed and Connected Ventilation Circuitry Refurbished HT Line Installed Filament Control Manufactured Water Circuit Tested Filament Circuit Tested …

MICE Amplifier Refurbishment

MICE Amplifier Refurbishment

MICE Amplifier Refurbishment

MICE Amplifier Refurbishment To be done (by MICE collaboration): Delivery to Daresbury RF power testing with proper HV supplies and RF loads Final adjustment of output loops Caveat (as mentioned before): The amplifiers operated at maximum 1.7 MW at CERN 2.5 MW were reached in the 1950s but with sparking problems With 2 loops we think that 2 MW are within reach So, we are curious: How far in power can you get? Powering of two cavities from one PA …