Project YES! Critical Design Review Team Search: Matt Paley, Emily Fuentes, Nick Stohl, Ian Andrzejczak, Jackie Myrose, Erik Horn 10/6/09.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team Space Jam Critical Design Review Bridget Chase, Shane Meikle, Jamie Usherwood, Ben Azlein, Megan Scheele, Taylor King, and Paul Guerrie October 5,
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
1 Student Hands On Training I (2009) Construction, Integration, and Test Construction, Integration, and Test.
Cameron Trussel, Elliot Guber, Joel Mendez, Brady Phillips, Branden Campbell, and Dushyant Dhundara Conceptual Design Review for “The Stabilizer”
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata October 6, 2011 The Wright Stuff Conceptual Design Review.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Oddballs Critical Design Review Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend 10/18/07.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick October 18, 2012.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Lightning Rod Critical Design Review Fall 2010 Rev A Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Team Honey Badger R.A.H.D. Critical Design Review October 18, 2012 Josh Power Karyn Science Kyle Team Leader C+DH Annie C+DH Zach Budget + Science C&DH.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Skillz That Killz Critical Design Review Jocelyn Mulkey, Jess Davidoff, Kaitlyn Zimmitti, Taylor Smith, Travis Dowdy, Hunter Hoopes October 8, 2009.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Junk in a Box Critical Design Review
O2n Cloud Nine Critical Design Review
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
S^3 Launch Readiness Review
Space Debris Critical Design Review
Launch Readiness Review
Team TWSS Launch Readiness Review
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

Project YES! Critical Design Review Team Search: Matt Paley, Emily Fuentes, Nick Stohl, Ian Andrzejczak, Jackie Myrose, Erik Horn 10/6/09

Mission Statement Fly to 30 kilometers Collect data on amount of humidity in the air at various altitudes and temperatures –Hoping to find an altitude with low enough humidity to keep ozone from reacting with aluminum Test the effectiveness of foam core to keep the BalloonSat at operational temperature without additional insulation –Design that could allow for more of mass budget to be allotted to science payload

Reasons for Change of Science Mission Ozone degrades after half an hour Not contaminating sample Ozone is extremely reactive: plastics & metals –Aluminum - water vapor –Titanium - weight, cost, manufacturability Small enough but powerful enough motor/chain

Requirements Flow Down: Mission Goal Legend: Type: Reference: GGoalRParent Reference OObjectiveGGoal Parent Reference FFunctionalOObjective Parent Reference PPerformanceCRCross Reference GCGC Gateway Constraint TypeGoal Mission Science Goal GG The Project YES! BalloonSat will fly to an altitude of approximately 30 kilometers. The mission shall be to test how much humidity is in the air relative to various altitude levels and temperatures in hopes of finding where a physical atmosphere sample could be gathered on future missions and brought down without the ozone in the air reacting with an aluminum collection container. At the same time, the Project YES! BalloonSat shall test the effectiveness of foam core at keeping the BalloonSat hardware at operating temperature, without using extra insulation. If a naked foam core layer is sufficient to maintain operating temperature, then the removal of additional insulation would allow for more of the mass to be dedicated to science payload.

Requirements Flow Down : Mission Objective 1 TypeObjective Mission Objectives Level 0 Reference OO1 Team Search shall measure the pressure, temperature and humidity as a function of altitude. G TypeRequirementO1 Objective Requirements Level 1Reference OR1.1 PROJECT YES! shall measure the pressure using both an internal and an external pressure sensor. O1 OR1.2 PROJECT YES! shall take the temperature on the AVR board, in the air pocket, and on the outside of the BalloonSat. O1 OR1.3 PROJECT YES! shall measure the humidity in the air pocket and on the outside of the BalloonSat. O1 TypeRequirement O1 System Requirements Level 2 Reference PR1.1.1 PROJECT YES! shall determine the altitude from the pressure using MATLAB. R1.1 PR1.2.1 PROJECT YES! shall correlate the temperature to altitude using MATLAB R1.2 PR1.3.1 PROJECT YES! shall correlate the humidity to the altitude and temperature. R1.3

Requirements Flow Down: Mission Objective 2 TypeRequirement O2 Objective Requirements Level 1 Reference PR2.1 PROJECT YES! shall measure the temperature inside a box of a single layer of foam core. O2 PR2.2 PROJECT YES! shall further insulate the AVR board to ensure its functioning. O2 TypeObjective Mission Objectives Level 0 Reference OO2 Team Search shall investigate the thermal properties of using one layer of foam core. G TypeRequirement O2 System Requirements Level 2 Reference PR2.1.1 PROJECT YES! shall compare temperatures recorded during the mission to the operating parameters for the AVR board supplied in the user manual. R2.1 CRR2.2.1 PROJECT YES! shall use an additional foam core layer to keep the AVR board above -10° Celsius. R2.2: R3.7 PR2.2.2 PROJECT YES! shall have an air pocket between the two foam core layers. R2.2

Requirements Flow Down: Mission Objective 3 TypeObjective Mission Objectives Level 0 Reference GCO3 Project YES! shall comply with all requirements set by Gateway to Space RFP. G TypeRequirement O3 - Gateway Requirements Level 1 Reference GCR3.1 The BalloonSat total mass shall not be more than 850 g. O3 GCR3.2 The COSG subsidy shall not exceed $ O3 GCR3.3 The payload shall allow for secure mounting to the Balloon Rope via a tube inserted into the design and build of the BalloonSat. O3 GCR3.4 The BalloonSat shall have a visible American Flag on its outside surface. O3 GCR3.5 BalloonSat must be constructed of either foam core or Aluminum. O3 GCR3.6 Team Search shall determine the accent and decent rates of the BalloonSat. O3 GCR3.7 The AVR board shall be kept at above -10° Celsius. O3 GCR3.8 The BalloonSat shall be able to fly again after landing. O3

Requirements Flow Down: Mission Objective 3 Cont. TypeObjective Mission Objectives Level 0 Reference GCO3 Project YES! shall comply with all requirements set by Gateway to Space RFP. G TypeRequirement O3 - Gateway Requirements Level 1 Reference GCR3.1 The BalloonSat total mass shall not be more than 850 g. O3 GCR3.2 The COSG subsidy shall not exceed $ O3 GCR3.3 The payload shall allow for secure mounting to the Balloon Rope via a tube inserted into the design and build of the BalloonSat. O3 GCR3.4 The BalloonSat shall have a visible American Flag on its outside surface. O3 GCR3.5 BalloonSat must be constructed of either foam core or Aluminum. O3 GCR3.6 Team Search shall determine the accent and decent rates of the BalloonSat. O3 GCR3.7 The AVR board shall be kept at above -10° Celsius. O3 GCR3.8 The BalloonSat shall be able to fly again after landing. O3

Parts HS1101 Humidity Sensor (2) Pressure Sensor (1 additional) HOBO (Two temperature sensors) AVR (Temperature and pressure sensors) As of now nothing has been ordered, our goal is to have all parts ordered by Thursday It should take approximately 5-7 business days for shipping, so the hardware should be delivered by October 16 th

Design Draw designs on foam core, cut out pieces (leaving paper in tact for folding, 45 degree edges) and cut out holes for wires, connections and camera hole Attach sensors to foam core walls with hot glue, attach camera/HOBO/batteries with duct tape/velcro, and heater/AVR with screws Routing and securing wires throughout box and to the holes we cut in foam core Structural support made of foam core attached to inner and outer boxes Close box by gluing sides together and sealing with aluminum tape

Design continued

Functional Block Diagram

Testing Plan and Schedule –Making sure our materials will work for the purposes we are assigning to them. Ongoing –Testing the entire design of the BalloonSat itself (Whip test, drop test, stair test) : Whip, Drop, and Stair Testing –Making sure our weather sensors are operational through : Sensor Testing

Testing Plan and Schedule Cont. –Testing the software and codes to ensure they run correctly Ongoing –Testing the subsystems (including heating and CCD camera, mass and power limitations) : Cold Test –Full scale mission simulation : Full System Simulation : Full System Simulation

Monetary Budget BudgetActualETCEAC ComponentQuantityUnitCost EaBudgetQuantityActualEstimateTotal Digital Camera1Ea$ GB Memory Card1Ea$ AVR Microcontroller1Ea$ HOBO Data Logger1Ea$ Heater Kit1Ea$ Switches2Ea$ Foam Core1Lot$ Miscellaneous Structure1Lot$ Test 9-volt Batteries8Ea$2.50$20.00 $0.00$20.00 Butterfly Valve3Ea$10.00$30.000$0.00 Small Motor3Ea$4.50$13.500$0.00 Chain1Ea$3.00 0$ " x 6" Aluminum Plate2Ea$7.98$12.50 $0.00 Dry Ice10lbs$1.00$10.00$0.00$10.00 HS1101 Humidity Sensor2Ea$4.99$0.00 $9.98 $89.00 $0.00$39.98

Mass Budget

Schedule Build Prototype for Testing Whip, Drop, and Stair Testing Completed Buy Any Extra Hardware Necessary Build Main Structure of Box Attach Sensors to AVR Board Test Sensors through Complete Satellite Built Full System Simulation Cold Test Second Full System Simulation Pre-Launch Inspection In-Class Mission Simulation Test Troubleshooting through Design Document Rev C Due Final Weigh-in and Turn In Launch Analyze Data through Design Document Rev D Due Final Presentations Due Design Expo BalloonSat Hardware Turn In We will also be meeting together weekly as an entire team, on Saturday mornings from 9 – 11 am, in order to check in with each other and make sure all aspects of the BalloonSat are still working together as they should be and/or trouble shoot and fix problems as they arise. Smaller groups will meet to work on specific tasks as needed throughout.

Organization Chart

Expected Results Data to create a weather satellite that can accurately measure temperature, pressure, and humidity during altitude changes. There exists a correlation between humidity and altitude. The unique design for heating of the satellite will work more efficiently than that of a normal box shape.

Biggest Worries Data corruption Structural stability Reusability Thermal problems