1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.

Slides:



Advertisements
Similar presentations
Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Advertisements

Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
January 24, 2008 Heinz-Dieter Nuhn, SLAC / LCLS Undulator BLM PDR Review 1 Undulator BLM PDR Review Heinz-Dieter Nuhn, SLAC / LCLS.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
June 19, 2008 Heinz-Dieter Nuhn, SLAC / LCLS LCLS Magnet Damage Management 1 LCLS Magnet Damage Management Heinz-Dieter Nuhn, SLAC.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter.
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
Undulator Physics Update – October 27, 2005 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Physics Update Heinz-Dieter Nuhn, SLAC.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
BLM review Mario Santana Leitner OUTLOOK ON FLUKA SIMULATIONS FOR UDULATOR DAMAGE AND BLM RESPONSE Mario Santana Leitner, Alberto.
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Undulator Overview FEL Performance Assessment
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
Henrik Loos Applications for 11 November 2008 SLAC National Accelerator Laboratory New High-Level Applications for 2009 Henrik.
D. Schultz FAC 6/17/08 1 Undulator Travel and Girder Assembly Undulator commissioning Translation limits Interference The plan.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
1 Heinz-Dieter Nuhn 1 Undulator Commissioning August 2009 FEL2009 Undulator Commissioning, Alignment and Performance Heinz-Dieter.
April 16, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Physics Issues 1 Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
1 Heinz-Dieter Nuhn 1 Undulator Plans June 2009 FAC Undulator Commissioning Heinz-Dieter Nuhn – LCLS Undulator Group Leader June.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Air Operated Valve Calibration NMV21
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Undulator Working Group Summary Heinz-Dieter Nuhn – Alexander Temnykh Presented at Friday, March 9, 2012.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Jaak Lippmaa HIP, Helsinki University
Possible causes for SPS ZS2 misalignment
EBTF Design Review Technical Meeting Group
Beam Finder Wire Assembly Undulator System
Beam-Based Alignment Results
Overview Pre-Beam Checkouts
Undulator System Components Status Dean Walters
High Level Physics Applications for LCLS Commissioning
LCLS Undulator System Status and Schedule
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Linac Diagnostics Commissioning Experience
Response to Recommendations
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Introduction [Documents and Parameters]
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
Presentation transcript:

1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009

2 Heinz-Dieter Nuhn 2 BFW Results June 2009 FAC LCLS Undulator Components Quadrupole BPM Manual Adjustments Segment Cam Shaft Movers WPM HLS BFW Sand-Filled, Thermally Isolated Fixed Supports Horizontal Slides Not visible Vacuum Chamber and Support

3 Heinz-Dieter Nuhn 3 BFW Results June 2009 FAC Beam Finder Wire Location on Girder Beam Finder Wire Housing Beam Direction Undulator Segment Vacuum Chamber

4 Heinz-Dieter Nuhn 4 BFW Results June 2009 FAC BFW Assembly (Body Sectioned) Wire card (Down Position) (Inactive Mode) Lower Limit Switch (Actuated Position) Pneumatic Solenoid Valve (Cylinder Vent Position) Internal Return Spring (Expanded Position) Electrical Connectors (Down Position) Internal Kinematic Stop Plates (Open Position) Bellows Seal (Compressed Position) BEAM Potentiometer (Out Position) Assembly model courtesy: J. Bailey, ANL

5 Heinz-Dieter Nuhn 5 BFW Results June 2009 FAC BFW Card Material: Macor Thickness: 3/16” (4.8 mm) Coating: Kovar Full Stroke: 25.4 mm X-wire end point: mm Beam center: 40 mm Gap between beam and X-wire: mm Y-wire end point: mm Beam center: 37.2 mm Gap between beam and Y-wire: mm Beam in OUT Position Beam in IN Position Beam travels out of slide plane

6 Heinz-Dieter Nuhn 6 BFW Results June 2009 FAC BFW Card Wiring: Tooling Copper Tabs Rods for hanging BFW wire with weights Micrometer stage BFW Card Card holder ‘Carbon wire & weight’ Wires soldered to copper tabs Wires from copper tabs connect to BFW feedthrough Feedthrough to be grounded and RF shielded Courtesy: C. Field, Y.Sung

7 Heinz-Dieter Nuhn 7 BFW Results June 2009 FAC BFW Wires X-Wire Y-Wire Nominal Beam Axis in IN Position Card Out Direction (½ stroke length shown) Wire Radius µm Note: Wires are fixed! Beam scanning will be achieved through girder motion.

8 Heinz-Dieter Nuhn 8 BFW Results June 2009 FAC BFW Functions Beam Direction A misaligned undulator will not steer the beam. It will just radiate at the wrong wavelength. The BFW allows the misalignment to be detected. (also allows beam size measurements) UndulatorQuadBFW Replacement Vacuum Chamber Wires BFW Planned Applications Loose End Alignment Beam Profile Scanning Planned Applications Loose End Alignment Beam Profile Scanning Girder

9 Heinz-Dieter Nuhn 9 BFW Results June 2009 FAC Location of BFW Detectors 40 Detectors are used for BFW readout 33 PEP-II style radiator/PMT units: one after each BFW device 5 ANL Beam loss monitors: next to PEP-II devices on girders 1, 9, 17, 25, Beam loss fibers: BLF U01-U16 covering upstream girder, BLFU 17-U33 covering downstream girders Wire charge diagnostics is not installed

10 Heinz-Dieter Nuhn 10 BFW Results June 2009 FAC Scan Procedure Incorporated in Matlab GUI Start matlab gui BFWscan_gui Choose girders (1-33), X-wire or Y-wire, scan range, and scan step size For instance Girder: Wire: ‘X’ and ‘Y’ Range: -250 microns to +250 microns Step size: 50 microns. When started, the gui will then for each selected girder Move the girder cams to place the upstream girder end to the beginning of the scan range relative to the estimated collision point. (Motion is pivoted at the quadrupole) Move the wire card to “IN” position (while beam stopper is inserted) Take measurements from the 8 detectors, add the results to the graphs and go on to the next location. When done, return the girder to the position at which it was started. Move the wire card to “OUT” position. Move the girder back to its standard location. The gui will stop the beam upstream of the undulator line during wire card insertion/extraction and during motion to the next position.

11 Heinz-Dieter Nuhn 11 BFW Results June 2009 FAC Scan with BFW11 Y-Wire Dump CerenkovDump Scintillator ANL BLM 25 Expected Collision Position BLF:U17-U33BLF:U01-U16 PEP-II BLM25 PEP-II BLM17 ANL BLM 33

12 Heinz-Dieter Nuhn 12 BFW Results June 2009 FAC BFW Alignment before FEL Commissioning

13 Heinz-Dieter Nuhn 13 BFW Results June 2009 FAC BFW Alignment after FEL Commissioning

14 Heinz-Dieter Nuhn 14 BFW Results June 2009 FAC DMP Cerenkov Detector Amplitudes Noise levels is due to coarse step size of 50 microns. 20 microns steps ize scans are planned for the near future.

15 Heinz-Dieter Nuhn 15 BFW Results June 2009 FAC Transverse Electron Beam Sizes

16 Heinz-Dieter Nuhn 16 BFW Results June 2009 FAC ANL/PEP Loss Monitor Responses

17 Heinz-Dieter Nuhn 17 BFW Results June 2009 FAC BLF Responses Girder Range Covered by Fiber

18 Heinz-Dieter Nuhn 18 BFW Results June 2009 FAC FEL Scattering on BFW wire Fringes indicate transverse coherence

19 Heinz-Dieter Nuhn 19 BFW Results June 2009 FAC The 33 Beam Finder Wire (BFW) devices in the undulator system are working very well. They enable monitoring of several parameters Loose-end alignment Beam sizes, i.e. betatron matching BLM calibration Transverse FEL coherence. Radiation levels produced by the scans are much lower than originally estimated allowing unrestricted use. Use has so far been restricted to higher electron beam energies due to the possibility of wire damage when interacting with the lowest energy FEL beam. The 33 Beam Finder Wire (BFW) devices in the undulator system are working very well. They enable monitoring of several parameters Loose-end alignment Beam sizes, i.e. betatron matching BLM calibration Transverse FEL coherence. Radiation levels produced by the scans are much lower than originally estimated allowing unrestricted use. Use has so far been restricted to higher electron beam energies due to the possibility of wire damage when interacting with the lowest energy FEL beam. Summary

20 Heinz-Dieter Nuhn 20 BFW Results June 2009 FAC End of Presentation