Cost Until end 2000:negligible 2001:3 kDM per irrad  Problem –Cyclotron split in commercial and research part. Irradiation facility still a commercial.

Slides:



Advertisements
Similar presentations
Frequently Asked Questions ?. Lost/Damaged Books Students are expected to pay for damages to library books or for the lost of any books. Students who.
Advertisements

Status and future measurements on Micron detectors Outline: Irradiation and measurement in dry atmosphere Measurements in vacuum.
Study of Behaviour of Silicon Sensor Structures, Before and After Irradiation Y. Unno, S. Mitusi, Y. Ikegami, S. Terada (KEK) O. Jinnouchi, R. Nagai (Tokyo.
IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
RaDIATE 1 st Annual Collaboration Meeting May Cost-effective Irradiations Discussion Radiation Damage In Accelerator Target Environments.
IEKP - Universität Karlsruhe (TH) 1 Preliminary Pinhole Studies (not final) F. Hartmann IEKP - Universität Karlsruhe (TH) Creation of defined.
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Explicit Congestion Notification ECN Tilo Hamann Technical University Hamburg-Harburg, Germany.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC Karlsruhe IEKP - Universität Karlsruhe (TH)
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
General Tracker meetingA. Furgeri 1 Irradiation results and Annealing scenarios for HPK IEKP – University of Karlsruhe Alexander Furgeri
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
LHCf 2015 Questions from LMC: – LHCf run scheduled shortly after initial commissioning – can it be delayed? – Present plan below. LHCf to removed at first.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Simulating Potential Layouts for a Proton Therapy Treatment Center Stuart Price-University of Maryland Bruce Golden- University of Maryland Edward Wasil-
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
Conclusions Beate Werner, Ursula Schmedtje, Fernanda Nery EEA Session 5 Eionet NRC Freshwater meeting, June 2015.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Temperature dependence of sensor leakage current Contents Introduction Measurement Result Summary Junkichi Asai (RIKEN BNL Research Center) (Hiroki kanoh.
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, V. Cindro a, I. Dolenc a, A. Gorišek a, G. Kramberger a, M. Mikuž a,b, J. Hartert.
Examples and disciptions for measurements On pixel and strip sensors.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
HEC strange signals 1 09 Feb 2012 E.Ladygin Status of HEC spikes study in Protvino E.Ladygin, M.Kazarinov, A.Kozelov.
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
Low Resistance Strip Sensors – RD50 Common Project – RD50/ CNM (Barcelona), SCIPP (Santa Cruz), IFIC (Valencia) Contact person: Miguel Ullán.
Study Medication  Time schedule  Résumé Development of an improved tablet formulation  Long term stability  Reasonable production conditions  Focus.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
p-on-n Strip Detectors: ATLAS & CMS
LO: To use long or short division (Grade C). Long Division Eg 442 ÷ x26=26 2x26=52 4x26=104 10x26=260 5x26=130 3x26=78 6x26=156 7x26=182.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
Magnification showing pads and “bias ring” First Look at SiD Charge Division Sensors at SCIPP.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
Status of the Planar Edgeless Silicon Detectors Gennaro Ruggiero TOTEM Collaboration Meeting 09/11/2005.
TCAD Simulation – Semiconductor Technology Computer-Aided Design (TCAD) tool ENEXSS 5.5, developed by SELETE in Japan Device simulation part: HyDeLEOS.
1 Updates on Punch-through Protection H. F.–W. Sadrozinski with C. Betancourt, A. Bielecki, Z. Butko, A. Deran, V. Fadeyev, S. Lindgren, C. Parker, N.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Static Surface Charges on Differently Passivated Silicon Strip Sensors Axel König, HEPHY11 th Trento Workshop, LPNHE Paris.
Influence of humidity on the IV characteristics A.Chilingarov Lancaster University ATLAS SCT Week CERN,
Development of Silicon Microstrip Sensors in 150 mm p-type Wafers
INFN and University of Florence Test Beam Meeting Tracker Week
Karlsruhe probe equipment and QA proposals/expertise
Axel König, HEPHY Vienna
Sep th Hiroshima Xi’an Test-beam evaluation of newly developed n+-in-p planar pixel sensors aiming for use in high radiation environment.
INFN and University of Florence Test Beam Meeting Tracker Week
Results from the first diode irradiation and status of bonding tests
Compact readout unit for the EP-RADMON radiation monitoring sensors
Baby MIND beam test status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Peter Kodyš, Zdeněk Doležal, Jan Brož,
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

Cost Until end 2000:negligible 2001:3 kDM per irrad  Problem –Cyclotron split in commercial and research part. Irradiation facility still a commercial part  expensive. Future:From Oct.2001 beam line for irradiation in research division: 0.5 kDM per Irradiation –Negotiation ongoing; but needs clarifying of procedure (same procedure without changes) This is the main reason why we need full sensors NOW

Some facts Beam time is not an issue It looks like Rpoly can stand ~500V  Biasing by bonding is possible (add.manual bonder is always available)

More facts related to irrad Bulk damage are in principal not bias dependent, dependent of C, O and N content Full bias at p irrad does not match the LHC conditions: e.g. Very high currents (would maybe blow up the sensor (100mA)) Full bias does not shape the field in the oxide in the right way (surface damage)!

Simulated LHC conditions with respect to surface damage! Vbias

Procedure 4 sensors stacked plus 20 teststructures in one go (~15min) T= -10°C at beam Humidity: Flow of dry nitrogen For the next irradiation to finalize parameters: –Several different Vbias are planned –On full sensors 1V at backplane to build up field in oxide, with all AC pads to GND (approx. LHC condition) –On teststructures: Vbias= 0, 1, 10, 100V (AC shorted) –One teststructure with Vbias =100V and no shortening of AC. –One teststructure without bias and further X-rays up to 50kGy (nice to know: we have 160 Hamamatsu teststructures)

Schedule Pre-measurement of teststructures from ST and Hamamatsu (until June 6) Marcello try to get grade X from Hamamatsu (otherwise 1 of 400  m sensors) Take the worst ST full sensor (with respect to pinholes) Irradiation the week June 6

Cost during production 1% of sensors ~270  ~70 Irrad 5% TS  70 Irrad (incl. TS) 35kDM