PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
LHC progress Report LHCC Wednesday 23 rd March 2011.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday fill with 1092 bunches (6 h stable beams)
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Friday 31st August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 14:00 beam dump Access:
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Tuesday 20 September 2011.
Thursday
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Thursday 20th July - morning
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday Luminosity production 1380 bunches
31/3/2010 Difficult day… but at the end stable beams.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Mon 8/8 – Tue 9/8 Stable beams #2009
Presentation transcript:

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5 hours (13 pb -1 ) 14:30. Beam dump (fill 1976) due to BLM on TCSG.L7B1 while going in collision (long running sum). 18:00 Verification of the effect of solenoids on vacuum in point 8. No effect on vacuum pressure in D1.L8 18:30 beam dump due to RF trip at the end of the squeeze (fill 1977) 22:30 Stable beams #1979: Initial luminosity 1.3x10 33 cm -2 s -1. Larger emittance from the injectors 04:30 QPS trip on RCO/RCD/RCS.A56. End of fill #1979 after 6 h (~23 pb -1 ) Following fill lost during the ramp (QPS trip – RQTL7.R7B1) 07:00: Trip of Sector 12 Mon 25/7 – Tue 26/7

13:20 Filling. Emittances small but comparable to previous fill Fill – B1H – B1V – B2H – B2V Difficult to believe the values particularly for Beam 1...

Mon 25/7 – Tue 26/7

14:30. Beam dump due to BLM on TCSG.L7B1 while going in collision (80s running sum). Lower lifetime particularly on B1 after horizontal separation scan in point 1.

BLM thresholds After verification with collimation team (Stefano), MPP (Markus), BLM team (Barbara): – The Master threshold for 10 monitors protecting TCSGs in IP7 have been increased by a factor 10 (for integration windows higher than 10ms) to provide more margin for optimization in particular in view of possible increase in intensity, luminosity Vacuum thresholds close to TCPs (now at 4x10 -7 mbar) likely require increase to 2x10 -6 mbar  to be confirmed with vacuum team today

17:30: Re-inject after blow-up verification in the SPS  blow-up was not effective due to drift in working point  now back to emittances of ~2  m Solenoids off at injection to verify the possible correlation with e-cloud  No correlation of vacuum pressure with solenoid current for L8 (but for R8). e-cloud not responsible for pressure spikes Vacuum in point 8 (L8)

18:30 Lost tune feedback signal in the last part of the squeeze (H2)  possible issue with the detector  Ralph investigating Loss of 1 RF module (M2B1 crowbar - 3 rd time: thyristor likely to be changed  piquet defining the need for/preparing the intervention possibly today (4 hours access) during daytime Fill 1977

Fill 1979 Finally in physics at 22:30. Initial luminosities rather low: 1.3E33 Emittance varying along the bunch train  already coming from SPS.

Emittance To be reviewed with SPS this morning. In the night preliminary re-adjustment. Fill 1976 – Before tuning in the SPS Fill 1977 – After tuning in the SPS

Vacuum activity in point 8 Still pending the understanding. Vacuum activity correlated with low lifetime and separation in point 8

Morning: Access for RF / QPS – Possibility of access for experiments In parallel verification of beam quality in the SPS and off line investigations of the vacuum issues in point 8 Restart in the afternoon (aim for intermediate emittance or slightly lower intensity if blow-up in the SPS proves not to be reproducible) Plan

Fill overview FillTerminati on Peak L (cm -2 s -1 ) Length (h)Int. L (Average ATLAS/CMS) (pb -1 ) Dump cause 1975STABLE1.6E Cryo valve PROFIBUS (SEU?) 1976ADJUST1.6E33-- BLM TCSG.L7 1977SQUEEZE--- RF Module trip 1979STABLE1.3E33