PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
A Handful of Topics. P200 Constituencies We re-negotiated our partnership agreements in CY2009 Long-standing partners JPL and Cornell are continuing as.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
MCAO Adaptive Optics Module Mechanical Design Eric James.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
SOFIA Proposal Timeline Millimeter/THz Development at the NRAO CDL 1 18-Feb-2011: NRAO Science/Engineering Advisory Panels in place 25-Feb-2011: NRAO Science.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Some Introductory Comments H.A. McAlister March 16, 2009 CHARA Collaboration Year Five Science Review Nice, France.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
A Year in the Life Of a State Data Coordinator December, 2013.
© JABEE 2015 Fundamental Concept of JABEE Evaluation and Accreditation JABEE evaluation and accreditation is to confirm the engineering educational program.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
SRG Gantt Chart Template
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
SPF MAG Quarterly Report – Feb 2015
Olathe South ACT Timeline
Main Street Improvements
X-ray Pump-Probe Instrument
Centralized Classroom and Event Scheduling: Fall 2018
13-block rotation schedule
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
FourStar 4K x 4K JHK imager
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Water Storage Investment Program
February 2007 Note: Source:.
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Welcome Update on ESS Construction Project
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2015 January February March April May June July August September
Presentation transcript:

PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008

PALM Palomar AO instruments PHARO SWIFT P1640 Visitor instruments Fiber nuller LAMP Future instruments 888 Cam

PALM Proposed observing schedule May-July schedule is still uncertain due to proposed changes in LGS science night distribution. April –April 9: 1 night NGS engineering (PHARO re-commissioning) –April 10-11: 2 nights NGS science May –May 9-12: 4 nights P1640 commissioning –May 13-14: 2 nights LGS engineering –May 15-26: 12 nights LGS or NGS science June –June 12-13: 3 nights SWIFT commissioning –June 14: 1 night LGS engineering –June 15-25: 10 nights LGS or NGS science July –July 8-10: 3 nights P1640 commissioning –July 11-14: 4 nights NGS science –July 15: 1 nights LGS engineering –July 16-23: up to 8 nights LGS science

PALM PHARO Modifications Cradle modified to move PHARO 2.50” forward. FM3 mounted to kinematic base. FM3 enclosure & cart suport post added. Schedule Early Feb.: Initial image quality tests. Mid-March: Lab commissioning with PHARO. AO in the lab through April 7. April 9: 1 night NGS engineering (PHARO re-commissioning)

PALM Project 1640 Schedule Pre-ship review planned for March 27, in New York. Plan to ship by April 15. Arrives at Palomar by April 28. AO in lab April 13 - May 7. April : Install SSMs (if not done previously) April 28 - May 7: P1640 lab commissioning. May : 4 nights P1640 commissioning July : 3 nights P1640 commissioning If SWIFT is delayed, P1640 could trade the three July commissioning nights for those in June. If P1640 is delayed (some concern over vendor delays), May nights might have to be given back.

PALM SWIFT Schedule Pre-ship review planned for early May, in Oxford (no date set). Plan to arrive at Palomar by May 21. AO in lab May 27 - June 10 (currently published schedule). May : Instrument checkout without AO. May 27 - June 10: Instrument lab commissioning June : 3 nights SWIFT commissioning Subsequent commissioning runs requested in Aug. and Sep. If SWIFT is delayed (some concern over detector procurement and testing), first commissioning run might slip to July. However, only 10 days lab time (possibly less) are available prior to this run.

PALM-3000 Electronics rack locations West side South side PHARO in rack 4 SWIFT and P1640 expect rack 6