Launch Readiness Review River Rock 2010 University of Puerto Rico June 9, 2010.

Slides:



Advertisements
Similar presentations
Building a Weather Station for a Near-Space Payload AEM 1905: Spaceflight with Ballooning University of Minnesota.
Advertisements

AnaSonde Assembly. What is the AnaSonde? *Reads temperature, pressure, and humidity data from the atmosphere *After it is sent into the atmosphere, it.
RockOn! Canister Integration RockOn! 2009.
Full Mission Simulation Report Temple University Fred Avery, Gene Council, Ny’Jaa Bobo, Salvatore Giorgi, Jay Shukla 4/21/12.
Tool Use Strip wire. Soldering Iron Step 1: Tinning the iron Tinning helps to make soldering easier and quicker while keeping the iron in good condition.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Critical Analysis Review NMSGC Student Launch Program University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Full Mission Simulation Test Report UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus May 14, 2010.
1 UPR-R(river) P(rock) X Progress Report April 28, 2011.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
UPR-R(river) P(rock) Conceptual Design Review University of Puerto Rico Río Piedras Campus December 17, 2008 (10:00 MDT)
Launch Readiness Review SloshSAT University of Northern Colorado Sage Andorka Dan Welsh Maurice Woods III Motoaki Honda Zach Sears 6/11/2010.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Launch Readiness Review JASMM Virginia Tech Team Members: Robbie Robertson Zack HarlowJeremiah Shiflet Daniel Martin Matt James Anthony Rinaldi Senior.
UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus October 16, 2010 CoDR Ver 0.1.
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
1 Full Mission Testing: Third Teleconference West Virginia University Rocketeers Student team: N. Barnett, R. Baylor, L. Bowman, M. Gramlich, C. Griffith,
Launch Readiness Review Team Name University/Institution Team Members Date.
2012 CoDR 1 UPR-R(river) P(rock) X U n I v e r s I t y o f P u e r t o R I c o CoDR October 4, 2011 Presentation Version 1.0.
NORTHWEST NAZARENE UNIVERSITY CHAD LARSON, BEN GORDON, DAVID VINSON, SETH LEIJA, ZACH THOMAS, DREW JOHNSON NNU Team Conceptual Design Review.
RockSat-C 2011 CoDR CSU RocketSat-C Conceptual Design Review Colorado State University Isaiah Franka Jordan Rath Abby Wilbourn Mike Yeager 10/1/10 1.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
Launch Readiness Review MinnSpec University of Minnesota Bryce Schaefer, Chris Woerhle, Art Graf
UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus April 24, 2012 FMS Report.
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
Full Mission Simulation Report New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Launch Vehicle  Launch Vehicle Summary  The length of the rocked is inches, and the mass is ounces.  We have a dual Deployment Recovery.
Release & Deployment ITIL Version 3
Critical Design Review Team Name University/Institution Team Members Date.
Residential Plumbing Where does the water in your home come from and where does it go?
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
BODHPS PROTOTYPE B Testing and Documentation of improved prototype with a record of power output.
Flight Readiness Review Student Launch Initiative SCS Rocket Team Statesville Christian School April 2, 2008.
FE-I4a Single Chip Card issues V. Tyzhnevyi HEP group, University of Manchester.
AnaSonde-3M Assembly. What is the AnaSonde-3M? The AnaSonde-3M reads temperature, pressure and humidity data from the atmosphere. After the AnaSonde is.
Critical Design Review Team Name University/Institution Team Members Date.
MinnRock Design and Canister Layout Team members Bryce Schaefer (team coordinator)- AEM Cameron Japuntich- AEM Liz Sefkow- ME Mitch Andrus-
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:10/25/2010.
UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus February 17, 2012.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
Launch Readiness Review
RockOn! October 26, 2008 RockOn! A Sounding Rocket Payload Workshop Colorado & Virginia Space Grant Consortium, Wallops Flight Facility.
Northwest Nazarene University Chad Larson, Ben Gordon, Seth Leija, David Vinson, Drew Johnson, Zach Thomas June 1 st, 2012.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Section 1: Mission Overview Mission Statement Mission Objectives Section 2: The Payload! User’s Guide Compliance Beta Prototype Testing Section 3: Check-In.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RockSat-C 2012 LRR Launch Readiness Review University of Minnesota Alex Richman, Jacob Schultz, Justine Topel, Will Thorson 5/27/2012.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Launch Readiness Review
Launch Readiness Review
Team Name Conceptual Design Review
Launch Readiness Report West Virginia University
Presentation transcript:

Launch Readiness Review River Rock 2010 University of Puerto Rico June 9, 2010

Lauren Colón Lisandra Cordero Pedro J. Dávila Luis García Rafael Gavilanes Gladys Muñoz Laura Obén Marilena Ortíz Oscar Resto Ozzie Resto Esteban Romero Noel Sánchez Verónica Zayas Team Members:

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A Type of RestrictionRestrictionStatus Mass allotment:19.6 lbs Volume allotment:Full Canister The payload’s center of gravity (CG):Yes Activation met under requirement: (either 1.SYS.1 or 1.SYS.2) Yes 1.SYS.1 Structure mounts:Top and bottom bulkheads Sharing:NO Sharing Atmospheric exhaust line with the MinnSpec University of Minnesota experiment.

Our canister is already fully integrated. We are still working on our software. We expect to have everything done before next Wednesday. Final Cleaning and assembly will be perform on Friday June 11. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Test: We completed the Pressure Tight Seal. We found some leakages, but they were corrected. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

We are ready! We are still working on some minor details of the software, but we expect to solve them this weekend. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Software –We will be ready! User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Are you ready for Wallops? –What tools do you plan to bring? Digital Volt Meter, Oscilloscope, Hand Drill, Drills, Whrenches, Gloves, Kin wipes, Antistatic Pads, Utility Knife, Clippers, Soldering Iron and Tin, etc, etc, etc……. –What tools are you assuming you have at your disposal? Anything that will not affect our experiment. –Are you brining extra hardware? Extra Semiconductor Sensors and Boards, Lexan Plates, Nanometric Filters, Teflon tubing and Fittings, TTL chips and transistors, Cables, etc, etc., etc ……. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Yes we went through the procedure. No question Yes, we will be prepare. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A

Yes, we have reviewed the schedule. User Guide ComplianceFinal PayloadIntegration Update/PlanTesting Results Level Of ReadinessRequired ToolsInspectionsQ/A