Ron Johnson Beam Position October 29-31, 2007 1 Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
LCLS Control Group LCLS-Week Oct , 2005 BPM Signal Processing T. Straumann, M. Cecere, E. Medvedko, P. Krejcik SLAC.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill FAC meeting Cavity October 30, 2007 LCLS Cavity BPM Status and Testing.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
RF Synchronisation Issues
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Beam Instrumentation for Orbit Stability I. Pinayev.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
‘BBA’ Goals Understand BPM performance –validate use for precision optics tests –justify & specify hardware/software upgrades Beam – Based ‘Alignment’
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
Beam Commissioning Adam Bartnik.
NanoBPM Progress January 12, 2005 Steve Smith.
LLRF Controls Outline Requirements External Interfaces Schedule Design
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ERL BPM System Mike Billing, Mark Palmer
Intra-Pulse Beam-Beam Scans at the NLC IP
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Fast Orbit Feedback at the SLS
Undulator Cavity BPM System Status
SuperB Linac Beam Position Monitor
SuperB Linac VME Beam Position Monitor
Undulator Cavity BPM Status
Low Level RF Status Outline Overview showing hardware instances
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM Performance and AFE Modifications Cavity BPM Electronics BPM Digitizer Comparison

Ron Johnson Beam Position October 29-31, Stripline BPM Performance and AFE Modification

Ron Johnson Beam Position October 29-31, BPM Performance Take data synchronized pulse-by-pulse Use linear prediction of each BPM from adjacent BPMS Example: Compare bunch charge pulse- pulse 300 pulses 17 BPMs Average rms/mean May include pulse-pulse variation in losses

Ron Johnson Beam Position October 29-31, Performance Predict BPM position reading from linear fit to adjacent BPMs (model-independent) 300 machine pulses Effective beam charge 0.35 nC  x = 2.5 microns  y = 1.7 microns

Ron Johnson Beam Position October 29-31, BPM Performance Q~ 200 pC Resolution requirement is 10 microns for the small aperture BPMs Meets resolution requirements

Ron Johnson Beam Position October 29-31, AFE Modifications CAL – Additional switch to improve isolation CAL – Add on/off control to oscillator CAL – Replace BP filter with packaged unit Chan – Replace 2 nd attenuator with 0-31 dB unit Chan – Put anti-alias BP filter on the PCB Revise limiter Revise layout and connectors

Ron Johnson Beam Position October 29-31, Status Plan to build 53 modules for BSY/LTU/Dump. Includes 3 spares for the injector. And 3 modules for sector 24/25 (at the request of the commissioning team). Installation in January. Most parts for AFE, PAD, and Clock Board on order (certainly long lead items). Bulk of modules ready for installation in March/April.

Ron Johnson Beam Position October 29-31, Cavity BPM Electronics

Ron Johnson Beam Position October 29-31, LTU and Undulator BPM System Specification ParameterSpecification Limit Condition Resolution < 1  m 0.2 – 1.0 nC +/- 1 mm range Offset Stability < +/- 1  m 1 hour +/- 1 mm range / Celsius Offset Stability < +/- 3  m 24 hours +/- 1 mm range / Celsius Gain Error< +/- 10 %+/- 1 mm range / Celsius Dynamic Range, Position+/- 1 mm10 mm diameter vacuum chamber Dynamic Range, Intensity> 14 dBPC Gun 0.2 – 1.0 nC

Ron Johnson Beam Position October 29-31, Cavity BPM Electronics

Ron Johnson Beam Position October 29-31, VME ADC Module

Ron Johnson Beam Position October 29-31, BPM Digitizer Comparison Steve Smith August 8, 2007

Ron Johnson Beam Position October 29-31, Analysis CW input from RF generator Through 140 MHz bandpass filter to reduce generator harmonics Digitize Plot spectrum Find apparent frequency from data Fit sine curve to data Look at residuals to fit Compare phase noise

Ron Johnson Beam Position October 29-31, VME -1 dB FS Fit good to 6.5 ADC counts rms ENOB = 11.5 Harmonics <-80dBc

Ron Johnson Beam Position October 29-31, VME digitizer -1 dB FS Fit good to 16 ADC counts rms ENOB = 10.2 Harmonics <-72dBc

Ron Johnson Beam Position October 29-31, Compare Noise floor Harmonic distortion Other lines in spectrum Input range

Ron Johnson Beam Position October 29-31, Digitizer Comparison VME 5 dB better on noise floor VME 8 dB better on worst harmonic ParameterVMEPADComments Amplitude-12-12dB FullSscale Rms fit error ADC counts ENOB Bits (ref Full Scale) Worst harmonic dBc Phase noise (full spectrum) degrees (includes harmonics) (PAD dominated by 2 nd harmonic) Phase noise (<20 MHz) degrees

Ron Johnson Beam Position October 29-31, Comparison Simplification Reduces the number of accelerator ethernet ports, private ethernet ports, and DIGI ports. Communication with the ADC is over the VME backplane. PAD would require enclosure and PS not yet designed. Simplifies clock distribution (10 vs 18 dBm input) Performance Reduces broadband noise and harmonics. FPGA has more computing power than the Coldfire. Comparable data transfer rates ( measured 28 Mbytes/s for VME ADC). Software Both would need modification of the IOC software. VME ADC needs a driver.

Ron Johnson Beam Position October 29-31, Status Two VME ADC modules produced and tested. Production of 40 additional modules to start in November. Cable plant is designed and in CAPTAR. Clock and LO distribution is being designed (Andrew Young). Power supplies and power distribution is being designed (Steve Smith). Hardware and software will be ready by April.

Ron Johnson Beam Position October 29-31, AFE Modification (Additional Slides)

Ron Johnson Beam Position October 29-31, AFE Modifications

Ron Johnson Beam Position October 29-31, Calibration Calibrate through BPM Via stripline-stripline coupling Performance not yet verified

Ron Johnson Beam Position October 29-31, CAL Modifications

Ron Johnson Beam Position October 29-31, RF BPM Analysis Steve Smith September 5, 2007 Updated Oct. 26

Ron Johnson Beam Position October 29-31, Procedure Calibrate with 2 mm scans: LCLSscan_Horiz_Cal_200pc_2000um_VertOffset3mm_1_HighGain x.sdds LCLSscan_Vert_Cal_200pc_2000um_VertOffset3mm_1_HighGain y.sdds Check against other calibration scans Analyze LCLSscan_Vert_Cal_200pc_200um_VertOffset3mm_2_HighGain y.sdds Take 1 st 50 pulses to fix BPM-to-BPM alignment Predict X2 = linear combination of (X1, Y1, X3) Y2 = linear combination of (X1, Y1, Y3) For remaining events Compare (X2, Y2) to predictions from (X1, Y1, X3, Y3) All data taken at 200 pC charge

Ron Johnson Beam Position October 29-31, Calibration

Ron Johnson Beam Position October 29-31, Check Calibration Scales Analyze two more independent sets of calibration data Confirms scale Note apparent mover inconsistency for last step of X scan

Ron Johnson Beam Position October 29-31, Data Set In middle of run beam (mover?) changes Position jumps ~200 microns Apparent beam angle changes Study only first 150 pulses

Ron Johnson Beam Position October 29-31, X  x = 360 nm

Ron Johnson Beam Position October 29-31, Y  Y = 270 nm

Ron Johnson Beam Position October 29-31, Resolution Conclusion Both X & y resolution are below 500 nm Movers are a pain Beam jitter is troublesome Requires large scans to get a calibration Should move BPMs independently Then beam jitter doesn’t affect calibration

Ron Johnson Beam Position October 29-31, Stability Tests (Sept. 6)

Ron Johnson Beam Position October 29-31, Check Short Term Stability Data: LCLSsynchlog_200pc_Horiz_00um_Vert_3000um_1_HighGain sdds 1000 points at 6 Hz Digitizer trigger glitch points removed Y steering during first 30 points, ignore them Alignment fit to next 50 points Drift, resolution taken from remaining ~900 pulses Resolution:  x = 440 nm  Y = 380 nm Drift ~ 200nm in X, less than 100 nm in Y in 2.5 minutes

Ron Johnson Beam Position October 29-31, Hour Cruise LCLSslowlog_1HourStab_ sdds 30 pulses every minute 5345 pulses total ~ 3 hours Many multi-mm jumps pulses 350 and 700 Clock seems unlocked from 390 to 490 Ignore first 700 pulses Use next 150 pulses (5min) of data for alignment Estimate resolution and drift from remaining pulses Resolution:  X = 1.6 microns  Y = 1.9 microns Drift: Look at fit residual plots (Vertical axes are in mm) ~5 microns in X ~3 microns in Y Over 2.5 hours Biggest motions coincide with beam motion (miscalibration)

Ron Johnson Beam Position October 29-31, Stability Conclusions Stability results are almost good enough Probably need better calibration Maybe mechanical stability Calibration is from 2 days prior to stability run ???