1 PSI 27/6/2006 C.Bemporad “THE TAMING OF MEG” News on Calibration Methods Cockcroft-Walton Accelerator  -sources on wire  -lines from neutron capture.

Slides:



Advertisements
Similar presentations
Peter-Raymond Kettle MEG Review February Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
An Advanced Linear Accelerator Facility for Microelectronic Dose Rate Studies P.E. Sokol and S.Y.Lee Indiana University.
Neutron background measurements at LNGS Gian Luca Raselli INFN - Pavia JRA1 meeting, Paris 14 Feb
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
Direct Reactions. Optical model Represent the target nucleus by a potential -- Attenuation length.
1 February 9th 2005 LXe calibrations, PMT tests, cryostat construction 1. Alpha sources on wires 2. 9 MeV  from neutron capture in Nickel 3.  0 4. further.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
Neutron background measurement at LNGS: present status Measurement carried out in collaboration between LNGS ILIAS-JRA1 and ICARUS groups.
Yasuhiro NISHIMURA Hiroaki NATORI The University of Tokyo MEG collaboration Outline  → e  and MEG experiment Design of detector Calibration Performance.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
1 1.  - ray production by the reactions Li(p,  )Be and B(p,  )C tested at the Legnaro INFN Laboratory 2.Monte Carlo simulation of point-like Americium.
Possible calibration methods for the final LXe calorimeter A. Papa 01/20/2004.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
MEG 実験用液体キセノン検出器の現状 東京大学素粒子物理国際研究センター 澤田龍 他 MEG カロリメータグループ 2007 年 9 月 24 日 日本物理学会 第 62 回年次大会 北海道大学.
Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator G. Signorelli Sezione di Pisa MEG Review meeting - 20 Feb On.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
1 NaI calibrationneutron observation NaI calibration and neutron observation during the charge exchange experiment 1.Improving the NaI energy resolution.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Possible calibration methods for the final LXe calorimeter A. Papa 02/11/
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 BVR, July 18th 2005, CB + T. Iwamoto CALIBRATION AND MONITORING METHODS (C&M) FOR THE LIQUID XENON CALORIMETER AND FOR THE WHOLE MEG DETECTOR
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Assessment of Physics, Applications and Construction Issues for the Proposed Magurele Short-Pulse Facility Silviu Olariu National Institute of Physics.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
The large-angle photon veto detector for the P326 experiment at CERN R. Fantechi INFN – Sezione di Pisa on behalf of the P326/NA62 Collaboration Villa.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Stereo Collab Meeting | CEA Saclay July-2015 Conclusions.
Overview of the MEG * CDCH * one of the following ( MEG UP MEG2 MEG + ) Marco Grassi on behalf of the CDCH Group.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Muon Ionisation Cooling Experiment Overview
M. Migliorati, C. Vaccarezza INFN - LNF
CELLION Technical Report
The Electromagnetic calorimeter of the MEG Experiment
Target and Horn status report
Liquid Xenon Detector for the MEG Experiment
CMS Goal of the experiment
MEG実験の液体Xe検出器について 東大 ICEPP  森研究室 M1 金子大輔.
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Advanced Research Electron Accelerator Laboratory
MAGiC Shielding Simulations
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Presentation transcript:

1 PSI 27/6/2006 C.Bemporad “THE TAMING OF MEG” News on Calibration Methods Cockcroft-Walton Accelerator  -sources on wire  -lines from neutron capture on Ni  °-decay

2 DELIVERY OF THE COCKCROFT-WALTON ACCELERATOR DEFINITION OF THE PROTON BEAM LINE BELLOWS SYSTEM FOR THE TARGET INSERTION INTO COBRA REQUEST FOR SPACE BEHIND THE MEG AREA FINANCING ETC. THE MEG EXPERIMENT COCKCROFT-WALTON ACCELERATOR & PROTON BEAM-LINE

3  The C-W accelerator is delivered on June-July 2007, after the start of the MEG data taking  The installation of the C-W accelerator at PSI and the C-W tuning requires at least one month  The C-W accelerator installation should not interfere with the MEG running  From time to time, some interventions and repairs on the C-W will be needed  The mutual effects between the C-W accelerator and the COBRA magnet must be small. Keep an adequate distance between them.  A large amount of space is needed (and available) in the MEG area for the bellows system and for the p-beam optical elements  It is convenient that the turning on and the tuning of the C-W accelerator take place while the MEG experiment is in normal running POINTS TO BE CONSIDERED

4  Need for space at the back of the MEG area for the accelerator installation “Radiation Safety” independently surveyed area  Bellows system for p-beam and Li target introduction into COBRA  p-beam opposite to the  -beam and on the same line (simpler !)  C-W accelerator at  7 m from the COBRA centre Optical elements needed for beam focusing and centring (4 steering magnets, 2 quadrupoles) The C-W accelerator construction and the bellows system preparation depend on a decision on the availability of the space downstream of the MEG area A RATHER COMPLEX PROJECT ! 1) MEG collaborative work 2) Help from the National Laboratories of Legnaro (advice and spare items) (Letter to/from and from the Lab. Director G.Puglierin) CONSEQUENCES RELIABLE AND EASY CALIBRATIONS ARE ESSENTIAL TO MEG An earlier C-W installation translates into a saving in time, in effort, in money (The experiment can be tuned when the PSI beam is not allocated to MEG and during machine-off periods)

5 PROBLEMS WE ARE IMMEDIATELY FACING; URGENT SOLUTION NEEDED ! C-W accelerator in the engineering phase. Some characteristics depend on the accelerator position and hall space availability. Wait for a decision ? Delayed delivery ! The order and the construction of the bellows system depend on the C-W position. The cost of the bellows system is approx euro If immediately ordered, it could be ready by November Desirable a BVR positive recommendation about the use of hall space for the C-W installation during this June 27th meeting. Present INFN financial difficulties. Decision on our requests (To be based on hall space availability !) during the July 3rd, or successive Commission 1° September meeting

6 Cockroft-Walton Accelerator in a fixed position and Bellows system for inserting the p-beam and the LiF target into COBRA (not to scale) P-beam and target inserted into COBRA P-Beam and target out of COBRA

7 THE PRESENT MEG AREA The Bellows System and the p-beam optics (4 steering magnets and 1 quadrupole doublet) can be arranged in the MEG area

8 Present position of the shielding walls behind the MEG area MEG AREA AREA ON THE BACK OF MEG

9 Proposed position of the new shielding walls Behind the MEG area

10 Possibility of bellows system, beam optics, C-W accelerator installation in a single MEG area (not advisable )

11

12 SINGLETRON COCKCROFT-WALTON ACCELERATOR

13 BELLOWS SYSTEM FOR THE INTRODUCTION OF THE PROTON BEAM AND OF THE LiF TARGET INTO COBRA  The bellows system project is ready (the beam section from the accelerator to the bellows system must be completed)  It is advisable that the bellows system be built during the summer 2006, be fully tested under vacuum and be tuned before the end of the year  Development of the safety system and of the computer controls  Improvements in the LiF target and holder. Cooling. Beam centring and beam current readings. Beam optics controls Avoid, if possibile, a time-overlap between the installation of the bellows system and the delivery, mounting, tuning of the C-W accelerator ESTIMATED COST OF THE BELLOWS SYSTEM  85 Keuro (if the beam optics elements and power supplies are all available at no cost)

14

15

16

17 microphoto of LiF TARGET very small p-beam irradiation cells of approx. 30  m intermediate p-beam irradiation

18 heavy irradiation at p-beam spot IMPROVE Lithium Fluoride TARGETS BETTER CARE OF TARGET COOLING AND GOLD PROTECTION

19  -sources on wire recent improvements

20 Polonium Wire-Sources RINGS IN LIQUID XENON PMT Q.E. Measurements Now in print on Nuclear Instruments & Methods Great if used in the bulk of any Liquid Detector !

21 CHECK OF PMT PROPERTIES IN THE FINAL CALORIMETER DURING THE EXPERIMENT Americium WIRE SOURCES 5 WIRES, 5 DOT-SOURCES PER WIRE Wire of  100 micron diameter Material: gold plated steel or tungsten Total length 150 cm Spacing of dot-sources 12.4 cm Linear dimension of dots 1-2 mm Activity  200 Bq per dot Quantum efficiency determinations in Large Prototype

22 first SORAD/ISOTOPE PRODUCTS AMERICIUM WIRE-SOURCES made by a thermocompression method Irregular rings, well simulated by the Monte Carlo Method…… !

23 EXTRA R&D BY SORAD New modified sources shipped to Pisa on June 18 th Elimination of the wing and of its shadow

24 EXTRA R&D BY SORAD interesting new method: Thermocompression of an Am-source strip wound around the wire

25 thermal neutron capture on nickel and 9 MeV  -line

26 large-prototype PROBLEM: in the LXe the line is worse; larger background due to fast neutron reactions n2n, n1 , n2 , n3 , ….. NaI  /E=2.5% Calorimeter monitoring by NEUTRONS AND NICKEL-LINE (Americium Source) “hourly calibration” NaI

27 WAY-OFF:  reduce the neutron energy by use of a Californium source  better reject  -particles from sources on wire  select thermal neutrons events by a delayed gate window (  100  s) and a trigger from fission prompt  ’s (lower rate) A “GENERATOR” OF 9 MEV  ’s FROM NICKEL MUST BE READY IN TIME FOR THE FIRST MEG RUN present problems with status of large Sodium Iodide Detector

28 hydrogen target to be used inside COBRA (new test: JUST NOW in Pisa !)

29

30

31 “THE TAMING OF MEG” all proposed calibration methods were tested and most of them are up to expectations WE ARE READY…..