MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 23, 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Commissioning needs K.Long. Machine start: Target ready to go Water leak: –In branch in trench serving D2, Q4 – Q6: Small leak exacerbated by header tank.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
1 Operations Overview L. Coney UC Riverside MICE CM32 – Glasgow – June 2012.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: -
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference May 7, 2009.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Linda Coney MICO June 6, 2011 MICE Online Report.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
Online & Operations Summary Linda R. Coney UCR MICE CM32 – RAL Feb 2012.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Completion of the MICE-US construction project
MICE Operations Scenario Run 1
Presentation transcript:

MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011

Commissioning Needs-Soler2 Commissioning Needs MICE shift 23/3/11 —Shift went well and most systems tested (see P. Hodgson’s report last week) —However, BPM was not able to be tested Beam Position Monitor: —Contacted Pierrick Hanlet and Alan Bross to see what could have been the problem —Discovered that HV was badly configured after EPICS tests —There are two CAEN SY127 crates (one on top of large SY527 crate and one next to BPM) o These need to be “daisy chained” but were not o SY127 cable connected to SY527 cable (which is at CAEN for repair) o With instructions from Pierrick, connected one SY127 to the other and terminated connections properly (however need to test)

April 4, 2011Commissioning Needs-Soler3 Commissioning Needs Henry removed MICE DAQ PCs from rack DAQ-04 —It includes: Grid data mover PC, "micestore", all miceacq* servers and DAQ KVM system. —PCs are currently in R76 —Old rack to be removed and new rack to be installed —Goal is to reinstall PCs around 14 April —Consequences: o No data taking until reinstalled o KVM box has been removed - machines that connect through it will need to use a local keyboard and monitor (miceraid1&2; micecss1; micepps1; targetctl1). o No backups of eLog, MICEmine, etc. (micestore removed) o Cannot test BPM again until system reinstalled

April 4, 2011Commissioning Needs-Soler4 Commissioning Needs Beam Magnets: —Water leak in trench next to receiver fixed by John Govans —Q6 water remains off until access at the end of this ISIS period Target in R78 —Ran successfully for actuations —However, it kept on getting stuck —Ken stopped it on 1/4/11 at ~17:00. —Target will need to be dismantled for inspection to understand why it is sticking

April 4, 2011Commissioning Needs-Soler5 Commissioning Needs Matt Hills is commissioning H2 system with cryostat —However, H2 line has developed leak: 0.73 mbar/hour —System shut down and leak to be fixed next week when Matt returns

April 4, 2011Commissioning Needs-Soler6 Run plan ISIS schedule: —1 March – 14 April 2011: ISIS run o 15 April – 17 April 2011: machine physics o 18 April – 1 May 2011: Easter shutdown o 2 May – 8 May: run up and machine physics o 9 May 2011: machine permits —10 May – 9 June 2011: ISIS run o 10 June – 12 June 2011: machine physics o 13 June – 26 June 2011: shutdown o 27 June – 3 July: run up and machine physics o 4 July 2011: machine permits —5 July – 4 August 2011: ISIS run o 5 August – 7 August 2011: machine physics o 8 August – 4 September 2011: shutdown? (subject to change) This Friday 8 April (12:30-13:30): Machine scheduling meeting (any requests?)