Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

A Strategy for Designing a House Layout Considerations Traffic flow Minimize plumbing runs Southern light John Galinato Jan 2004.
Parts of a Computer.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Groundswell UK- Core Beliefs Inclusive solutions to homelessness There is no Them & Us – only Us! Involvement works! We believe in people! The whole community.
P2.4 Central heating model © Pearson Education Ltd Copying permitted for purchasing institution only. This material is not copyright free. This document.
Grass cut and shrub picture requirements Following this procedure will ensure that you get paid for the work completed. All rights to this document are.
Assistive Technology: Making it Real! Brian W. Wojcik, Ed.D., ATP SEAT Center Illinois State University.
Tarek Rakha and Christoph Reinhart
Inspection Cell Aim:- –To provide a conceptual layout design that allows the successful transfer of packages from the vault to the cell and throughout.
Decentralized Resource Management for a Distributed Continuous Media Server Cyrus Shahabi and Farnoush Banaei-Kashani Presented by Leung Chi Kit.
Rob Taylor.  A Mind Map is a diagram used to represent concepts, ideas, tasks or other items linked to a central theme.  In a Mind Map, the central.
Module 9: Transferring Data. Overview Introduction to Transferring Data Tools for Importing and Exporting Data in SQL Server Introduction to DTS Transforming.
Number of unit : 3 Course type : Core Prerequisite: None.
Informative sketch Elementary Shape and Shading Simplifying Shape Explanatory Drawings: Exploded Views & Instructional Drawings.
Warehouse Layout Analysis for Ferro Electronics By Roberto E. Estrada Rajan Batta Rakesh Nagi April 13, 2001.
1 Validated Stage 1 Science Maturity Review for {JPSS Algorithm} Presented by Date.
MIND MAPPING.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
Car with Parachute Workshop 1 : Make a canopy of any shape
Chapter 1 Introduction to VBA Development in Excel.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
By Mircea Jivoin. Objectives Achieving the warehouse management over the internet using the SOAP Web Services Achieving the warehouse management over.
Accessing to Spatial Data in Mobile Environment Presented By Jekkin Shah.
GMP on blood/plasma collection establishments Group 2.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Tips and Tricks of Food Labels Unit 6 What are Food Labels? O Food labels are located on the package of all food products. O They provide serving size,
St4 Prop Tube Mapping 05/15/2011 Ming Liu This is a mapping diagram for St-4 prop tubes Facing a module/FEM: – ECL Channels counted from right (1) – to.
Value Stream Mapping at NCS Presented to: Gunnison Date: 4/2/2014.
Asia Map Quiz Name: ______________________
Assistive Technology: Making it Real! Brian W. Wojcik, MS. Ed, ATP SEAT Center Illinois State University.
California Integrated Waste Management Board Agreement with San Francisco State University to use Satellite Technology to Locate Waste Tires in California.
Sl. No. ParticularsPercentage of consideration 1On Booking / Signing of Agreement15% 2Upon Commencement of Ground Floor20% 3Upon.
Things to think about: Cushions Fabric? Plant - Cotton/linen Animal - Leather/Suede/Silk/Wool Man made- Nylon/Leatherette/PVC Style? How is it going to.
Radon Radioactive gas in your home? What is radon? Radon is radioactive Radon is radioactive It decays and emits an alpha particle It decays and emits.
SIZE - Top SERVER ROOM Designed by – openbox |
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Assistive Technology: Making it Real! Brian W. Wojcik, Ed.D., ATP SEAT Center Illinois State University.
Developing Extra Care Housing  Purnima Wilkinson – emh Group  Gary Turner – Westleigh Partnerships Limited  Sally Taylor – Enable Care and Support.
Display Screen Equipment Or Are you sitting comfortably? Toolbox Talk.
1. Design: Plan in detail Get the analysis document from this folder. There are two GCSE ICT tasks in unit 2: Power Point for the garden centre and Database.
北京双仕达广告有限公司 2011 年 广告资源推介书 新起点、新征程、新高度. ◎ 价值篇 ◎ 评估篇 ◎ 资源篇.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Business Identity System: Logo Business Card (front & back) Letterhead.
Traditional English houses
Considerations from machine protection and the ELQA teams
Concept Lighting Proposals
LBNF CAD models, Drawings and Component list
for home lighting design
TBM thermal modelling status
Swedish Radiation Protection Authority
Hire Toyota Innova in Delhi for Outstation Tour
Manual Task Mapping Template
بسم الله الرحمن الرحیم روش تحقیق و مقاله نویسی موضوع:
First and Third Angle Projection.
Memo Report – 1 per TEAM (80 points)
Objective Understand web-based digital media production methods, software, and hardware. Course Weight : 10%
Analytical Method Validation PAI Readiness / Certification
GROUND FLOOR LAYOUT TYPICAL FLOOR LAYOUT UNIT LAYOUT Regular Suite sqm.
Label: Horizon, Vanishing Point, Vertical, Horizontal
CCTV Inspection Results
Course Structure.
Analysis of School magazine examples
Facilities Inspected Facility Parking Map Reference Comments
Warren Apartments – Black Ground Floor: Inaccessible Element
The New Leavelle McCampbell Middle School
Things to think about: Cushions Fabric? Quality control?
Examinations Council of Zambia
Presentation transcript:

Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection Cell considerations. Results presented as recommendations.

1. Locations One centrally located Overpacking Cell. Eleven Inspection Cells, one on the ground floor at the front of each vault. The inclusion of an extra transfer tunnel is recommended, along side the existing tunnel.

1. Locations

2. Overpacking Cell The Overpacking Cell should only overpack packages. Layout Design A has been chosen.

3. Inspection Cell Inspection Scheme 2. Scheme 2 Level 1 All packages Documentation validation  Direct visual inspection  Master/Slave Manipulator held CCTV’  Radiation Level 2 Percentage of the packages or suspect packages  3D Mapping

3. Inspection Cell Inspection Cell Layout C2.