LED Solder Press Status Report Presentation One  By Ryan Bigl &  Kyle Levesque.

Slides:



Advertisements
Similar presentations
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
Advertisements

REO AssetTracker Application Overview v1.1 MaximLogic LLC.
Optical Manufacturing Solutions 1 Probe Assembly.
Synapse UpFront The Future of Production Planning.
Introduction to LabVIEW 8.5
Project 704Ψ Design team: Sarah Steward Chad Harrington Kyle Levesque.
LED Solder Press Final Presentation Final Presentation Senior Projects 2 Senior Projects 2 By Ryan Bigl & By Ryan Bigl & Kyle Levesque Kyle Levesque.
Dynamic lot sizing and tool management in automated manufacturing systems M. Selim Aktürk, Siraceddin Önen presented by Zümbül Bulut.
A Solder Reflow Oven Dylan Gifford David Cobler. A typical $30,000 Reflow Oven Solder Paste Surface Mount Technology.
Problem statement Design an automated miniature solder press that will… Be able to solder pre-glued surface mount LED emitters to a metallic circuit board.
Team Bi-directional -Keith Beland -Christian Brinegar -Justin Marsha.
12/13/2003By: Strobridge & Sulkoski1 G.U.S.T.E.R. General Universal System for Testing External Rotors.
LED Solder Press  Status Report Presentation  Senior Projects I  By Ryan Bigl &  Kyle Levesque.
Luxeon Solder Press  Status Report Presentation  Senior Projects I  By Ryan Bigl &  Kyle Levesque.
Project 704Ψ Design team: Sarah Steward Chad Harrington Kyle Levesque.
Catheter Tube Assembly Process
Introduction CNC (Computer Numerical Control) Machines are automated machines, which uses programs to automatically execute a series of machining operations.
National 4/5 Graphic Communication Advantages of CAD 3D Modelling.
AUTOMATION & PRODUCTION TECHNOLOGY. PROJECTS Students learned about group dynamics and the Engineering Design Process How can we build the tallest structure.
How engineers in 1954 expected a computer to look like in 2004.
PROCAL MULTI DISCIPLINE CALIBRATION SOFTWARE CALIBRATION PROCEDURE MANAGEMENT CONFIGURATION & CUSTOMISATION STAND-ALONE CERTIFICATE PRINTING.
Overview Test Interface (TIU PCB‘s) are extremely expensive.
Dynamic Traffic Light Timing Tony Faillaci John Gilroy Ben Hughes Justin Porter Zach Zientek.
Applied Technology High School ATE 1012 Grade 10 Eng. Rose Hasan.
Smart Material Museum Exhibit Spring Design Review #2 Senior Design Group 13 Glen Ashworth Daniel Roque Isaac Piersall Laura Wainikainen.
DIY Engine management system: Take full control of your car
TEAM MEMBERS Dan Carlson Team Leader Dave Ugai Communicator Erik Bieging BWIG/BSAC.
NDIA Conference:10/22/2003:Page 1 UNCLASSIFIED Copyright © 2003 Raytheon Company All rights reserved Space and Airborne Systems Electronic Warfare Systems.
Robotic Backhoe with Haptic Display Design Overview
Dynamic Traffic Light Timing Tony Faillaci John Gilroy Ben Hughes Justin Porter Zach Zientek.
9/9/2015IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 07 Process Planning.
Process Planning and Computer Aided Process Planning
INDUSTRIAL ELECTRONICS CONTROL EET425/4 Lecturers Indra Nisja School of Electrical System Engineering Northern Malaysia University College of Engineering.
“The means through which our needs are met.”. I. Two Types of Production Systems a. Manufacturing: making goods in a workshop or factory. b. Construction:
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Slide 1 Mixed Model Production lines  2000 C.S.Kanagaraj Mixed Model Production Lines C.S.Kanagaraj ( Kana + Garage ) IEM 5303.
Inventory Group Marcus Jameson, Evan Sheline, Jeff Stine, Michael Breitweiser, Spencer Hill Dr. Giolma – Advisor Tony Franckowiac - Sponsor.
IPod analyses Paul, Ethan, Niels. Casing: Plastic cover Dual injection molding ▫White cover ▫Transparant layer on top of this Advantages ▫Lower part cost.
GCSE ELECTRONIC PRODUCTS NAME:CANDIDATE NUMBER:Our Lady & St John Catholic College—471111PAGE Our Lady & St John Catholic College, Blackburn Centre Number.
SUPER TOASTER Wes Brown Eastern Kentucky University Computer Electronic Networking.
SOLAR POWERED SMART BLIND (SPSB) SYSTEM Smart Home Automation
Managing a large accountAdWords API. Google AdWords API. Want a more tailored AdWords Account? Here’s an automatic solution.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
Design Team : Advisor: Dr. Edwin Project Web Site: Client: Paul
Digital Doorbell Team 2 Tyler Blaker, Mike Woessner, Jose Pina, Bill Kessler, Jesse Yanik, Justin Bayham, Brandon Roberts, Mike Goggins, Ralph Voltz.
Proposal for Optimisation and Automation of Beam Impedance Measurement Developed and Presented by Muzhaffar Hazman Thanks to Olav Berrig.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Advisor: Zhao Zhang Team Members: Chris Chambers Christopher Reis Alex Dean Luke Breuer SPALDING GYMNASTICS SCOREBOARD Client: Spalding Advisor: Zhao Zhang.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Problem Statement The goal of this project is to complete the basic automated functions of the Dream Green putting surface. The objective is to produce.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report/Presentation Closing.
EXTRUSION BASIC CONCEPTS
The Consolidation Process The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the.
Material Requirements Planning (MRP)
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Google AdWords API. Want a more tailored AdWords Account
Starter Look at the images below. What do you see? Write your answers on your mini white board.
Jigs and Fixtures A Basic Look Computer Integrated Manufacturing
7/9/2018IENG 475: Computer-Controlled Manufacturing Systems 1 IENG Lecture 07 Process Planning.
The Consolidation Process The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the course on the.
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
The “Yarn Bully” Transport Cart
Introduction to LabVIEW
Yr 7 Electronic Torch Unit
IENG 475: Computer-Controlled Manufacturing Systems Process Planning
Preliminary Design Review Tablo Game Projection System
Presentation transcript:

LED Solder Press Status Report Presentation One  By Ryan Bigl &  Kyle Levesque

Problem statement Design an automated miniature solder press that is able to…  Solder pre-glued surface mount LED emitters to a metallic circuit board.  Test the LED after completion  Be faster and more efficient than hand assembly.  Not need human aid, after initial setup is completed.

Solutions  Build a X table with an adjustable jig for metallic circuit boards.  Make a single press/ dual soldering iron system with electronically fed solder.  Allow user to initially select predetermined board size and stores data throughout the run.

System Overview  User interface and controls  Pneumatic controlled motion  Computer controlled soldering irons and feed system  Computer recorded test system  Preprogrammed board sizing

Original Time Breakdown

Old Project Division Ryan  Pneumatic system  Wire feed system  Web page  User Manual  Presentations Kyle  Solder probe system  User interface system  Test system  Presentations

A few new decisions…..

New System Overview  Basic User interface and controls  Basic Pneumatic solder iron motion  Computer Controlled soldering irons and feed system  Computer recorded test system

New Time Breakdown

New Project Division Ryan  Solder feed system  Adjustable jig system  Web page  Presentations Kyle  Basic Pneumatic system  Solder probe system  User manual  Presentations  Test system

completed Goals  Define system setup and feasibility.  Make a task list and divide up hours for project.  Meet with LedDynamics to present ideas.  Redefine project from the companies considerations and time management.

Upcoming Goals  Decide what soldering system to use through testing and research, (either liquid or solid).  Design Jig mounting setup for multiple board sizes, (Adjustable fence).  Decide on solder iron wattages and design though research and testing.  Communicate with LedDynamics about final system design and budget.  Manufacture “test” boards for soldering system. Both

Budget ItemQuantityDescriptionSale Price $Sale Total $ Controller1Microcontroller50.00 Air regulator and filter system 1Single regulator and dual filter trapUNKNOWN Solder Cylinder1Double-acting cylinder with end position cushioningUNKNOWN Pneumatic Tubing4 ft.Flexeel hose25'/ Wire Feed1 or 2UNKNOWN Solder22 reels Soldering Tips2size: 3/64" (.047", 1.1 mm) Jig base Stocksee desc. Steel or plastic plate stock: 1" x 12" x 18" ASTM B test Stocksee desc.Aluminum flat stock.125" x 12" x 2’7.71 Complete Total

Project Contacts  Oliver Piluski, LED Dynamics  or  John Kidder, Senior Projects Teacher   Andre St. Denis, Senior Projects Teacher 

Questions?