GLAST I&T January 29 2004 T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM1/3 PSR, April 20, 2005 GLAST LAT Tracker Tower-1/3 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectDecember 2, 2003 R. Johnson Engineering Meeting 1 GLAST Large Area Telescope: Tracker Subsystem WBS Tracker EM Vibration Test Status.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Mini-Tower test results
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
Introduction and Overview
Design Integration and Analysis
GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4
Tracker to Tracker Clearance Reduction Contributors
Presentation transcript:

GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up

GLAST I&T January T Borden 2 Outline  Tracker Tower Mock-Up  Test Fixtures  Hardware Modifications  Schedule  Concerns  Conclusions  Mini Tower

GLAST I&T January T Borden 3 Tracker Tower Mock-Up  Why have two Tracker mock-ups?  One-mock up needed for I&T at a minimum  Second mock-up (Tracker EM) can be used for Vibration test and I&T  Identify multi Tower installation issues (pointing, alignment, clearance)  Allows first mock-up to be available in early April for I&T  EM Tracker available mid April, with help from INFN, for Vibration test then ship to SLAC for I&T  Two Tracker Tower mock-up plan:  EM Tower – Remove bottom tray from EM Tower in Italy and modify at SLAC – Reassemble EM Tower in Italy and vibration test at Alenia – Ship EM Tower to SLAC  “New” Tracker mechanical model from prototype parts – Second EM Bottom Tray modified at SLAC – COI side walls at SLAC – Prototype trays at SLAC and INFN (need these shipped back to SLAC) – All other small parts available at SLAC

GLAST I&T January T Borden 4 Test Fixtures  Drawings of Grid and Tracker – required to start  1 X 1 Grid fixture – For integration or Mini Tower?  Updated interface for integration or use 1X4?  Use for mini Tower  1 X 4 Grid – from Mechanical in flight configuration  For integration testing?  For Flight Tower testing?  Alignment fixtures  Purpose design?  Both mock-ups can be used to align Towers  All interface parts and fasteners – make set for I&T  Lifting fixture – from Tracker or I&T?

GLAST I&T January T Borden 5 Hardware Modifications  Bottom Tray modification Tooling  1 X 1 Top ring  Mini Tower Support  Track 1 X 4 completion for on time delivery

GLAST I&T January T Borden 6 Schedule  Start February 2 nd  See attached schedule  Inputs needed  Drawings from Tracker and Mechanical subsystems  Parts from Tracker subsystem – Bottom Tray and inspection criteria for repair – Mid span flexures and bonding process – Sidewalls – Fasteners – Cables – Who supplies lifting fixture?  Parts from Mechanical subsystem – 1 X 4 Grid  Agreement on complete Tower test plan and fixtures

GLAST I&T January T Borden 7 Concerns  Can Resources be made available in a timely manner, both workforce and funding  No full time designer available until February 16th  Can Tracker and Mechanical subsystems provide needed materials and support

GLAST I&T January T Borden 8 Conclusions  Build up two Tracker mock-ups  I&T mock-up for integration  EM Tracker for vibration test and I&T needs

GLAST I&T January T Borden 9 Mini Tower  Design Sidewalls and top tray simulator ring  Flight Lifting fixture can be used  Design and fabricate test stand parts as needed (need test stand requirements)  Assemble Mini Tower with 5 th tray