Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Beam-Based Alignment with New Parameters Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Isaac Vasserman Magnetic Measurements and Tuning 10/14/ I. Vasserman LCLS Magnetic Measurements and Tuning.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Alignment.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
BBA Related Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center 1 LCLS Linac TDR, December.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
EM vs. PM Quads Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Undulator.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
Alignment and stability session
Magnetic Measurements At SLAC
TEST MODULE WG Cradles for CLIC module supporting system
Magnetic Measurements For The LCLS Undulator System
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Integration Test Status
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
Presentation transcript:

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Magnetic Measurements and Alignment Issues

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Undulator Alignment Process Optical Alignment requires direct line of sight between instrument and target  fiducials need to be either on aisle side or on top of component Optical Alignment requires direct line of sight between instrument and target  fiducials need to be either on aisle side or on top of component

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Alignment Operation and Tolerances (PM Quads) Quadrupole alignment Quadrupoles too small to carry fiducials is accomplished by relative alignment to adjacent undulator Carried out in MMF using CMM, no optical alignment involved undulator wrt to BBA-aligned quadrupoles relative alignment requirements: 70 µm in Y, 300 µm in X Using the undulator fiducials to align quadrupoles: fiducialization quadrupole axis to quadrupole fiducials to undulator fiducials X, Y 30 µm Undulator Cradle, quadrupole, BPM are aligned wrt undulator fiducials Carried out by optical alignment, supported by HLS and portable stretched wire measurements Quadrupole ab-initio position tolerance driven by BBA requirements; BBA quality is correlated to quality of initial alignment – mover motion range is about 3-times StD of alignment  BBA residual offsets are among others a function of quality of initial alignment Alignment StD of 150 µm sufficient for BBA to converge, goal is alignment StD of < < 100 µm Quadrupole alignment Quadrupoles too small to carry fiducials is accomplished by relative alignment to adjacent undulator Carried out in MMF using CMM, no optical alignment involved undulator wrt to BBA-aligned quadrupoles relative alignment requirements: 70 µm in Y, 300 µm in X Using the undulator fiducials to align quadrupoles: fiducialization quadrupole axis to quadrupole fiducials to undulator fiducials X, Y 30 µm Undulator Cradle, quadrupole, BPM are aligned wrt undulator fiducials Carried out by optical alignment, supported by HLS and portable stretched wire measurements Quadrupole ab-initio position tolerance driven by BBA requirements; BBA quality is correlated to quality of initial alignment – mover motion range is about 3-times StD of alignment  BBA residual offsets are among others a function of quality of initial alignment Alignment StD of 150 µm sufficient for BBA to converge, goal is alignment StD of < < 100 µm

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Alignment Fiducials and Abbe’s Law Abbe’s Law postulates that in order to avoid 1 st order errors, the measurement needs to take place in the principle plane of the dimension Hence: Horizontal measurement wrt fiducial in horizontal plane Vertical measurement wrt fiducial in vertical Abbe’s Law postulates that in order to avoid 1 st order errors, the measurement needs to take place in the principle plane of the dimension Hence: Horizontal measurement wrt fiducial in horizontal plane Vertical measurement wrt fiducial in vertical

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Effect of violating Abbe’s Law (1) Already placing the top fiducial not exactly in vertical plane of rotation creates too much of a roll correlation, assuming 1 mrad roll Need to change fiducial position into plane of rotation, or need to control roll about 0.1 mrad Already placing the top fiducial not exactly in vertical plane of rotation creates too much of a roll correlation, assuming 1 mrad roll Need to change fiducial position into plane of rotation, or need to control roll about 0.1 mrad

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Effect of violating Abbe’s Law (2) Roll Tolerance presently defined = 1mrad To reduce roll correlation to become insignificant, tolerance needs to be 0.1 mrad This requires to set elevation of both fiducials to better than 10 µm  cannot be done with optical measurements Roll Tolerance presently defined = 1mrad To reduce roll correlation to become insignificant, tolerance needs to be 0.1 mrad This requires to set elevation of both fiducials to better than 10 µm  cannot be done with optical measurements

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC “Gap open to Aisle” Fiducial Design Gap open to aisle requires two fiducials per cross- section on top of undulator Additionally, two reference surfaces to set roll using machinist level, one near either end Do we need roll reference in any case, e.g. is present roll tolerance consistent with vacuum chamber stay clear? Gap open to aisle requires two fiducials per cross- section on top of undulator Additionally, two reference surfaces to set roll using machinist level, one near either end Do we need roll reference in any case, e.g. is present roll tolerance consistent with vacuum chamber stay clear?

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC MMF Lay-out

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC New MMF lay-out Modified Lay-out Highlights Separation of magnetic measurements operation from fiducialization and assembly Allows different temperature zones: mag.meas +/-0.1degC CMM / assembly+/- 1 degC Loading / Storage+/- 2.5degC Assembly line type lay-out Storage capacity for most (all) undulator segments Modified Lay-out Highlights Separation of magnetic measurements operation from fiducialization and assembly Allows different temperature zones: mag.meas +/-0.1degC CMM / assembly+/- 1 degC Loading / Storage+/- 2.5degC Assembly line type lay-out Storage capacity for most (all) undulator segments

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Installation Schedule

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Installation and Alignment Schedule: Assumptions Goal: Get ready for commissioning in July / August 2007 SPEAR3 approach, complete as much work as possible before installation during pre-assembly Aggressive concurrent scheduling Optimize time not man-power Only one shift work Goal: Get ready for commissioning in July / August 2007 SPEAR3 approach, complete as much work as possible before installation during pre-assembly Aggressive concurrent scheduling Optimize time not man-power Only one shift work

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Pre-assembly of installation units Pre-assembled granite tables and cradles Pre-assembly of granite tables Mount support feet Mount support table and mechanical adjustment system Mount cam movers Install temperature acquisition system Install temperature insulation Complete cabling, plug-in ready Pre-align table supports and undulator supports Pre-assembly of cradles Attach cam mover kinematics Install roll-away rails (& mover system) Install undulator, quadrupole and BPM Install vacuum system Complete cabling, plug-in ready Fiducialize and align Pre-assembled granite tables and cradles Pre-assembly of granite tables Mount support feet Mount support table and mechanical adjustment system Mount cam movers Install temperature acquisition system Install temperature insulation Complete cabling, plug-in ready Pre-align table supports and undulator supports Pre-assembly of cradles Attach cam mover kinematics Install roll-away rails (& mover system) Install undulator, quadrupole and BPM Install vacuum system Complete cabling, plug-in ready Fiducialize and align

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Alignment Scheme All components use registration keys to preserve pre-alignment Install and measure alignment network Install floor anchors and foot plates Align foot plates to better than 0.5 mm Install granite tables onto foot plates Re-measure alignment network Align undulator mechanical supports Install cradles Install HLS and WPM Re-measure alignment network Align undulators All components use registration keys to preserve pre-alignment Install and measure alignment network Install floor anchors and foot plates Align foot plates to better than 0.5 mm Install granite tables onto foot plates Re-measure alignment network Align undulator mechanical supports Install cradles Install HLS and WPM Re-measure alignment network Align undulators

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Installation and Alignment Schedule (Version 0.1)

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Integration

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Integrating Monitoring Systems into Cradle / Support System Since the cradle needs to be easily removable, we cannot attach the monitoring systems to it. Hence, both WPM and HLS need to be mounted to support table. However, the mounting has to be accomplish in a way which will force the sensors to follow the cradle motion

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Integrating Monitoring Systems into Cradle / Support System

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC HLS Stability and Resolution

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC Integrating Monitoring Systems into Cradle / Support System

Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics and Engineering June 28 & 29, 2004 Robert Ruland, SLAC WPM Stability and Resolution