Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb. 2004 Component layout Design Manager:

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Noise Canceling in 1-D Data: Presentation #9 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 23 rd, 2005 Full chip.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 5 MAD MAC nd February, 2006 Top Level Integration.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 4 th, 2005 Chip.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #2 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Noise Canceling in 1-D Data: Presentation #6 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 23 rd, 2005 Functional.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #1 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Viterbi Decoder: Presentation #9 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 9: 29 nd Mar Chip Level Simulation Design.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
ADPCM Adaptive Differential Pulse Code Modulation
Presentation transcript:

Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager: Yaping Zhan Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun

Status , Integrated Circuits Design Project Design Proposal (Done) Architecture Proposal (Done) Gate level Design(Done) Component Layout (DRC & LVS): (Done) basic components: 100% functional blocks: 100% To be done: Component Simulation: (10%) Chip Layout Spice Simulation of Entire Chip

Schematic: top level , Integrated Circuits Design Project Viterbi Decoder clk rst In_valid In_data Out_valid Out_data BCU ACS Trace Back ML Search

Floorplan Goal: High speed clk rst clk rst clk rst clk rst In_validIn_data out_dataout_valid

Underneath , Integrated Circuits Design Project

Primitive Gates INVXORAND , Integrated Circuits Design Project

1-Bit Register , Integrated Circuits Design Project

1-Bit Full Adder , Integrated Circuits Design Project

1-Bit Half Adder , Integrated Circuits Design Project

8-Bit Register , Integrated Circuits Design Project

8-Bit Adder , Integrated Circuits Design Project

8 bit 2:1 Mux , Integrated Circuits Design Project

8 bit Comparator , Integrated Circuits Design Project

Multiplier , Integrated Circuits Design Project

BCU , Integrated Circuits Design Project clk rst In_valid Data_in out0 out1 out2 out3 out4 out5 out6 out7 out8 out9 out10 out11 out12 out13 out14 out15

ACS , Integrated Circuits Design Project clk rst In0 In1 In2 In3 In4 In5 In6 In7 In8 In9 In10 In11 In12 In13 In14 In15 out0 t0 out1 t1 out2 t2 out3 t3 out4 t4 out5 t5 out6 t6 out7 t7

ML Search , Integrated Circuits Design Project clk rst in0 in1 in2 in3 in4 in5 in6 in7 min

Trace Back , Integrated Circuits Design Project clkrst t0 t1 t2 t3 t4 t5 t6 t7 s0 s1 s2 s3 s4 s5 s6 s7

Top level BCU ACS ML Search Trace Back , Integrated Circuits Design Project

Major Component Measurements ComponentDimensions (LXW)(µm) 8 bit Adder40 x 16 8 bit Register36 x 9 Multiplier14 x 25 8 bit Mux37 x 8 8 bit Comparator42 x 11 Total Transistor Count: 21, , Integrated Circuits Design Project

Questions? , Integrated Circuits Design Project