Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.

Slides:



Advertisements
Similar presentations
EPIC Calibration Meeting, Mallorca Low energy calibration with the Vela SNR K. Dennerl, 2009 March 31 Low energy calibration with the Vela SNR Mallorca,
Advertisements

EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
XMM Calibration/Ops Meeting Mallorca 1-3 Feb Proposed new window mode for MOS Cameras Tony Abbey, Leicester University.
XMM EPIC MOS Andy Read EPIC Calibration Meeting Leicester University 30/09/04 Addendum to 1ES0102 Study - Search for similar low-energy.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
6 November 2007Cal-Ops Meeting Mallorca Recent Results from EPIC MOS Life Test Facility Tony Abbey and Craig Brown University of Leicester Space Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
Energy Calibration using SNRs: preliminary results Andrea Tiengo INAF, IASF-Milano Mallorca, 6 November 2007 EPIC Calibration Meeting.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
MOS 3x3 mode slow slew survey Richard Saxton October 2006.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
XMM EPIC MOS Andy Read EPIC Calibration Meeting Saclay 24/09/03-25/09/03 Analysis of the X-ray PSF PSFs in the CCF MCG C273.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Ringberg 2-5/April/2002 Broad-Band MOS v PN Cross-Calibration Study •8 Observations.
XMM EPIC MOS Steve Sembay Mallorca 02/02/05 Temporal and spatial variability of the MOS RMF 1.Introduction and brief history of the.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
XMM EPIC MOS Steve Sembay Mallorca 06/11/07 Report on three NRCO calibration observations On axis observation of absorbed Seyfert.
XMM-Newton 1 D Lumb -- SCI-ST. EPIC TTD Nov01 EPIC Background Template Files Why we need them - previous attempts insufficient Adding together high galactic.
1 XMM-Newton Extended Source Analysis Software Steve Snowden & Kip Kuntz  Publicly Released 5 April 2006  XMM-Newton Extended Source Analysis Software.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
Chandra X-Ray Observatory CXC ACIS Ops team December 2, ACIS Ops Future Response to BEP Watchdog Reboots ACIS Ops Team.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Experience with combined Fe55 / Tycho SNR calibration
EPIC Calibration & Operations Meeting
Tony Abbey – University of Leicester
Temporal &Spatial Dependency of the MOS RMF
Update of EPIC pn long-term monitoring
Long-term trends in EPIC pn energy response
SLC-Aware IOC Magnet Functional Requirements
Presentation transcript:

Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005

Mallorca, 1st of February 2005 Page 2 XMM-Newton Introduction 1) PN specific 2) MOS specific 3) SCOS2000

Mallorca, 1st of February 2005 Page 3 XMM-Newton PN specific – Offset tables No fixed offset tables used for PN. Dump of the offset table inserted before the Start of the Observation: + offset data information always present for an observation - increased overhead: –~7 minutes for FF,Ext.FF, LW –45 seconds for SW, Ti and Burst Repetition number changed from 100 to 50 for FF.

Mallorca, 1st of February 2005 Page 4 XMM-Newton PN specific – EPCE unit EPCE experienced an autonomous warm reboot in rev. 841: –Visible through a drop of the currents of the quadrant-dedicated converters in the EPVC –EPCE runs PROM version => reboot autonomous and smooth. No impact on science. –Investigations => same problem in rev. 741 Actions: –NCR#114 raised –Explanation: SEU that stopped the code –Creation of a DP that detects any EPCE reboot(based on the parameter that counts the warm boot)

Mallorca, 1st of February 2005 Page 5 XMM-Newton MOS specific – EMDH K  EMDH K successfully tested in flight and definitely uploaded in rev  EMDH K improvements: – –Ability to upload up to 250 bright pixels instead of 50 with version J+ – –Cover the possible impact of the failure of the CCD extended range temperature sensor

Mallorca, 1st of February 2005 Page 6 XMM-Newton MOS specific – THIN1 filter assessment Low energy patch observed on a bright source Test to check whether this patch is due to a filter degradation (otherwise CCD degradation): –In rev. 900, on 1ES –Filter wheel moved by 20 steps away from the THIN1 position, in the opposite direction to the calibration source. THIN1 filter does not show degradation of its most exposed area.

Mallorca, 1st of February 2005 Page 7 XMM-Newton MOS specific – filter wheel sanity check Routine control of the filters sanity (degradation, micro holes,…)  Diagnostic Reset Per Pixel mode used

Mallorca, 1st of February 2005 Page 8 XMM-Newton SCOS 2000 XMM-Newton shall be operated with SCOS2000 Rev. 940, fully executed via SCOS2000 (TC,TM) –All modes have been planned –TM comparisons with respect to SCOS1, FITS file comparison Next rev. = rev. 954 Expected to switch to SCOS2000 in phase 3 by April 2005 Definite use of SCOS2000 (phase 4) 3 months later (July 2005)