P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.

Slides:



Advertisements
Similar presentations
Conduction Conceptests
Advertisements

Fired And Unfired Pressure Vessels
Thermostats, Pressure Switches, and Other Electric Control Devices
Refrigerators.
Basic Refrigeration Cycle
Application of Steady-State Heat Transfer
Heating Control Devices
Mini Jet Sample Dyeing M/C Daelim Starlet Co., Ltd.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
Oxygen Concentrators.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Vacuum Vessel Production Readiness Review
Engineer Presentation
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
Wind Turbine Design and Implementation.. Team Members Members: Luke Donney Lindsay Short Nick Ries Dario Vazquez Chris Loots Advisor: Dr. Venkataramana.
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
Dakota Nickerson, Kyle Pflueger, Adam Leschber, Andrew Dahlke M.E. Undergrad 1.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
P09451 Mid-Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
Pressure Vessel Stress Calculations Brian. Stress calculations for a 5 foot Long 2 foot in diameter cylindrical pressure vessel during normal operation.
Senior Design: Validation of Design December 15, 2008.
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
One Dimensional Steady Heat Conduction problems P M V Subbarao Associate Professor Mechanical Engineering Department IIT Delhi Simple ideas for complex.
P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE.
COMMERCIAL REFRIGERATION
STEAM HEATING.
Hydronic Mechanical Controls
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
Underwater Robotic Fish Week 3 Review Presentation Project #15029 Multidisciplinary Senior Design Rochester Institute of Technology Phase II: Buoyancy.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
Water piping design.
FEASIBILITY OF COMPONENTS CLARA ECHAVARRIA & JONATHON LOCKE.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
ME 414 : Project 1 Heating System for NASA North Pole Project Team Members Alan Benedict Jeffrey Jones Laura O’Hair Aaron Randall May 5, 2006.
NSTX TF Bundle & Center Stack Curing Oven Mike Viola Joe Rushinski Frank Jones April 14, 2003.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
Ankle Linear Force Comparison A (reference)BCD Current Passive-Dorsi-flex AFO Dorsi-flex assist AFOPlantar-flex assist AFOPlantar/Dorsi assist AFO Segment.
Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th :00 AM – 12:30 PM Project
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
Presented to: By: Date: Federal Aviation Administration Burnthrough Test Method for Aircraft Thermal/Acoustic Insulation: Burner Replacement Investigation.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
ANL Bubble Chamber Superheated Active Target System B. DiGiovine N 2 O and C 2 F 6 as Active Fluids.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Why Maintenance Tasks are Important Produced by Joe Marchese.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
SEPTEMBER 2002 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Detector Heater Panel Testing Alexis Smith September 17, 2002.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
[1] 3D Micromanufacturing Lab. CO 2 INCUBATOR. [2] 3D Micromanufacturing Lab. What is an Incubator In biology, an incubator is a device used to grow and.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
Zach Bolotin Cody Hatch Robert Swartz Moog Flight Simulator Visual Display.
Project: P08371 Portable Command Post Rick Chadwick ME Harith Wijetungage IE Scott Pudlewski EE Sponsors: Technet Global Services DiLorenzo Electronics.
Design, Evaluation and Application of a Fuel Cell Vehicle
Advisor: Dr. Shangchao Lin
Advisor: Dr. Shangchao Lin
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
P10229: Composites Autoclave
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Piping and Instrumentation for Process Industries
Presentation transcript:

P10229: Composites Autoclave Brian Cario: ME Matt Brady: ME Matt DiFrancesco: ME Brandon Allen: EE John Mink: EE

2 Detailed Design Review Agenda Project Background Project Objectives Functional Risk Mitigation Pressure Vessel Design Stand Design Structural Finite Element Analysis RG&E Pressure Vessel Proposal Heating and Circulation Design Insulation Finite Element Analysis Plumbing and Pressurization Design Electrical Design Controls and Software Design Budget and Bill of Materials Preliminary Test Plan Next Steps Desired outcome: approve final design raise awareness of funding situation

3 Background: Purpose of an Autoclave Device for Curing Components Made of Composite Materials Under Heat and Pressure High-Strength, Low Mass Very Low Void Ratio 10x Wet Layup Image Courtesy directindustry.com

4 Project Objectives Senior Design 1Senior Design 2 TasksConcept Generation and Selection Complete Pressure Vessel Construction Detailed Design, Ready for Construction Test Pressure Vessel Spec Stock PartsFinal Assembly Test Autoclave DeliverablesComplete Autoclave DesignComplete, Operable Autoclave Partially Built Pressure VesselManual for Operation Some Parts Obtained

IDRisk ItemEffectCauseLikelihoodSeverityImportanceAction to Minimize RiskOwner Describe the risk briefly What is the effect on any or all of the project deliverables if the cause actually happens? What are the possible cause(s) of this risk? 1 to 5 L*S What action(s) will you take (and by when) to prevent, reduce the impact of, or transfer the risk of this occurring? Who is responsible for following through on mitigation? 1Inadequate BudgetEnd product will be incompleteInitial estimated cost is insufficient5525 Leverage other groups, colleges, departments for extra support Deliver product with reduced functionality Entire Team 8 Autoclave releases too much heat into the surrounding room Surrounding room will get too warm for occupants to safely work Inaccurate insulation calculations and research 248 Complete a thorough heat analysis with Pro E, ensure that external temperature remains below 125F Matt D. Surface of vessel might cause injury if touched 9 Door is not completely fastened to the vessel during operation Pressure will be lost from vessel Improper fastening of door3412 Clear instructions on proper closure and fastening of door. Team Air from room may be replaced with HOT N2 Gas Sensor system for detecting improper closure which will prevent operation if improperly closed 10Autoclave requires too much power to heat Heating system will not be able to function as needed Excess heat loss into vessel and surroundings 4520 Explore alternatives for vessel design to minimize heat loss Matt D. Try adding some insulation to inside of vessel 11Autoclave experiences overpressure Pressure vessel structure is compromisedMechanical failure of inlet valve 122 Add blow-off valve to vessel Matt B. Potential danger to room occupantsSoftware failureSet inlet regulator to max desired pressure 12Autoclave experiences over Temperature Damage to pressure vesselExcess current draw248Current-limiting fuseBrandon Damage to workpiece(s) Thermocouple failure248Have multiple thermocouples within vesselJohn/Brandon Software failure155Have thermal fuse ( F) within circuitBrandon 13Circulation motor fails Uniform temperature is not maintained withing vessel Mechanical failure133 Multiple air thermocouples to detect non-uniform air temperature, with software to turn off system Matt D. Damage to workpiece(s) 14Autoclave is unstable Personnel injury Weight of pressure vessel 248Design wide, low standBrian Vessel damage High Center of Gravity Bulding damage

Controls Flowchart

User Interface Screenshots

Circuit Diagram

Stand Design

Pressure Vessel Model

Pressure Vessel FEA Model

Structural FEA Summary

FEA Summary ComponentMax Stress (psi)MaterialYield Strength (psi)Factor of Safty Pressure Vessel psi) API 5L X42 Steel Pipe Rear End Cap psi) Plain Carbon Steel Front Door psi) Plain Carbon Steel Front Door Hinge A36 Carbon Steel Front Door Hinge Pin A36 Carbon Steel Tank Flanges psi) Plain Carbon Steel Tank Support Straps A36 Carbon Steel Vertical Stand Supports519.81A36 Carbon Steel Horizontal Stand Supports A36 Carbon Steel Flange Bolts Grade 8 (1.25" Diameter) Based on bolt torque of 650 ft-lbf per RGE specification

Heating and Circulation

Insulation FEA- External Only 94 lbf/(in-s) = 67kW

Insulation FEA-Internal Added 15.2 lbf/(in-s) = 8.6 kW

Steady State Surface Temp Outer Surface Temp: °F

Steady State Heat Flux lbf/(in-s) = 385W

Plumbing Schematic

Facilities Validation Proposed location: composites lab 230V 3-phase power supply available in lab Met with Neil Kromer (building 78 manager) on , no foreseeable problems with installation

RG&E Proposal

Funding Commitments to Date $2000 – ME Department $1500 – MET Department $500 – BAJA Team

Bill Of Materials Part I Electrical DescriptionPart NumberSourceQuantityUnit PriceTotal Price High Temperature WireTBDGoodman's50' roll$27.50/50ft$27.50 Back Panel (22”x22”)N/APlastics Lab9Free DC RelaysN/APlastics Lab3Free Din-rail/TerminalsN/APlastics Lab9Free High Current Bulkhead Connector1575Pave Technology Co1$ #22AWG Bulkhead Connector1588Pave Technology Co2$115.00$ Thermistor502JH1kUS Sensor5$10.00$ Phase 45A RelayGA312D45ZCrouzet1$ AWG Red Wire22awgRedChrome Glow50ft$0.25/ft$ AWG Black Wire22awgBlackChrome Glow50ft$0.25/ft$ Phase 240V Safety Switch7524K22McMaster1$83.89 Subsystem Total$ Pressure Vessel and Stand DescriptionPart NumberSourceQuantityUnit PriceTotal Price 2" x 2" x 1/4" (48" length) A36 HR Angle SteelN/ARochester Steel and Surplus13$9.00/ Section$ " x 48" (3/16 thick) A36 HR Sheet SteelN/ARochester Steel and Surplus1$45.00 Titan 6" Casters with full brake Tractor Supply4$29.99$ " x 1' A36 HR Steel BarR12Metals Depot1$12.01 Rust-Oleum Hammer Black Paint170995Lowes2$14.98 /qt$ / x 1" Hex Bolts48872Lowes1$3.18 /25$3.18 5/ Hex Nuts40958Lowes1$4.51 /25$4.51 2' x 2' x 1/2" A36 Steel PlateP112Metals Depot1$ ' x 8' x 3/64" 3003 Aluminum SheetS3040Metals Depot3$40.96$ /8" x 1/8" Aluminum Rivet45309Lowes1$4.94 /100$4.94 Tested RG&E Vessel Parts and Labor-RG&E1$3, Includes ~$2500 in parts Gas Cylinder Clamp2283T12McMaster1$40.12 Mesh for Part Rack9243T381McMaster1$59.02 Door Hinge Bushing2938T62McMaster2$4.65$9.30 Door O-Ring9396K418McMaster2$22.91$45.82 Subsystem Total$4,439.46

Controls DescriptionPart NumberSourceQuantityUnit PriceTotal Price Pressure TransducerPX91N0-10KSVOmega1 $ Standard Power Supply iDRN-PS-1000Omega1 $ Phase Circuit BreakerQO340Schneider-Electric1 $ Relay MPJA1 $19.95 ComputerEL eMachines1 $ DAQNI USB-600National Instruments1 $ Subsystem Total$1, Pressurization DescriptionPart NumberSourceQuantityUnit PriceTotal Price Nitrogen Regulator7897A12McMaster1$ Inlet Solenoid Valve10M61Magnatrol2$153.00$ Blow-off Valve4673K71McMaster1$ " Nitrogen Inlet Hose5676T846McMaster1$ "x3/8" Pipe Bushing4638K575McMaster1$ feet 3/4" Copper Tube8967K8McMaster1$ /4" NPT Compression Fitting5272K294McMaster1$ /8" MxF Stainless Braided Hose5676T342McMaster1$ /4" x 3/8" Reducing Tee44605K468McMaster1$4.25 3/4" NPT Nipple7736K114McMaster1$ "x3/4" Pipe Bushing44605K295McMaster1$6.53 3/8" Pipe Nipple7727K162McMaster2$3.47$ psi hi-temp Pressure Gauge4010K116McMaster1$ /8" Pipe Tee44605K402McMaster2$6.09$ " Pipe Elbow MxF44605K138McMaster1$7.11 Subsystem Total$ Heating, Circulation, and Insulation DescriptionPart NumberSourceQuantityUnit PriceTotal Price Mineral Wool Insulation, 2"x2'x4' qty. 6N/AATS Acoustics3$34.00$ kW Straight Incoloy tubular heating elementsTHE04061Tempco3$131.05$ bulkhead connectors for heating elements?Tempco3$34.95$ blade fan, 1000CFM, CW rotation2UJU3Grainger1$ /50 HP 115VAC Motor for fan58459Drill Spot1$ /16" shaft seal13125K76McMaster1$ /8" flanged bearing for fan shaft9440T18McMaster1$1.56 1"OD,.5"ID steel tube for fan shaft supportT21250Metals Depot1ft$9.01 3/8" 1018 steel rodR238Metals Depot2ft$2.46 1/4" shaft coupler6412K11McMaster1$5.44 Galvanized steel plug for blower shaft mount7739K188McMaster1$6.00 1x3x11ga. Steel Tube for motor mountT13111Metals Depot2ft$ gage steel sheet for heating element mountsS111Metals Depot1ftx2ft$21.40 Subsystem Total$ Autoclave Total$8,335.28

Funding Options Current funds: $4000: Pressure Vessel, Incomplete Stand, Completely designed system $4500: Complete Pressure Vessel and Complete Stand $6000: Complete Pressure Vessel, Stand, Heating System, and Pressurization System $8500: Complete Autoclave as Designed Design will have all the basic functionality of commercial unit at 1/10 the cost

Preliminary Test Plan Pressure Vessel: Hydrostatically Tested by RGE Heating: Physically Tested at ambient Pressure Electrical: Simulated then Physically Tested as a system Controls: Extensive Simulation then Physically Tested Pressurization: Physically Tested to ensure safety Detailed Test Matrices to Follow in MSD 2

Next Steps Determine level of funding and resulting functionality – By Meet with funding sources to discuss options Investigate MSD II Deliverable options Order custom and long-lead-time parts based on funding Commission RGE to begin Vessel Fabrication Begin Fabrication of Stand, Hinge, and Blower Parts as funding permits