Machine Detector Interface Summary Junji Haba, KEK.

Slides:



Advertisements
Similar presentations
Background issues in the KEKB
Advertisements

Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
June 28, 2004 BBBTF Steven H. Robertson McGill University, Institute of Particle Physics 1 Beam Background Simulation with B A B AR with B A B AR June.
Snowmass G. Eigen, University of Bergen G. Eigen University of Bergen Snowmass July 14, 2001.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, nd Joint Super B factory WS in Hawaii.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
Guy Wormser, Super B-Factory Workshop, Jan 04 1 BELLE/BABAR present background situation zThe information from BELLE:
Current BG Status at Belle Osamu Tajima ( Tohoku univ ) Assumption in this talk 100days-operation / yr 1nTorr CO pressure in simulation HER / LER = 1.1.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Machine/Detector interface (MDI) Summary J. Haba KEK.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
Synchrotron Radiation (SR) in Super-KEKB / Belle Osamu Tajima ( Tohoku univ )
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
RF background, analysis of MTA data & implications for MICE Rikard Sandström, Geneva University MICE Collaboration Meeting – Analysis session, October.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
W. KozaneckiIR summary, BES-III workshop Interaction Region: a terse summary  Accelerator issues  Parameter comparison with PEP-II/KEKB  IR layout 
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Experimental Study of the BEPC Ⅱ Backgrounds JIN Da-Peng IHEP, Beijing, China Representing the Backgrounds Study Group May 11, 2007, BEPC Ⅱ IMAC Meeting.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
M. WeaverB-Factory Operations Review April 24, 2006 BaBar Backgrounds Matt Weaver B-Factory Operations Review April 24, 2006.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
KEK news ( ) S.Tanaka.
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Electron cloud and collective effects in the FCC-ee Interaction Region
Introduction to the Backgrounds Study in the BEPCⅡ/BESⅢ
Shifter Instructions regarding the ZD, Dan Peterson
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Francesco Forti SuperB Workshop LNF, March, 2006
Interaction Region Design Options e+e- Factories Workshop
Calorimeter Backgrounds
Long term projections summary
HE-JLEIC: Boosting Luminosity at High Energy
Some of the Points Raised During my JLAB Visit
MEIC New Baseline: Performance and Accelerator R&D
IR/MDI requirements for the EIC
Presentation transcript:

Machine Detector Interface Summary Junji Haba, KEK

Beam background Another very important issue in a high luminosity machine other than L. Where it comes?.

What is beam background?

10% occupancy means 10k ch has unnecessary hits!

Types of Accelerator Backgrounds Synchrotron Radiation (SR) Lost beam particles (BGB) Touschek scattering Luminosity backgrounds M. Sullivan Nice introduction for non machine physicist.

Lifetime Effects Quantum lifetime –(Not a problem as the RF voltage is high.) Residual gas –Bremsstrahlung –Elastic scattering –Small change as the gas is only a few times worse. Touschek effect Luminosity –Bhabha (e+e-  e+e-) –Radiative Bhabha (e+e-  e+e-  ) Beam-beam tune shift J. Seeman Different view from Machine operation

Synchrotron radiation from up/down stream Off momentum/orbit beam particle

Study of Touschek Effect Touschek contribution < 20 % at collision ~ 50 % at single beam 31 % in simulation Smaller beam-size (larger density)  larger background If no Touschek Touschek contribution must be corrected Collision run Single beam run O. Tajima What we learn here is beam is different for collision.

Touschek lifetime versus RF voltage Quantum lifetime Smaller bunches J. Seeman

Luminosity backgrounds  Radiative Bhabhas These are initial state radiation events. In single ring colliders, these events were buried in the beam envelope and were eventually lost when the beam went through a bending magnet, many meters from the detector. The 2 ring B-factories, with shared quadrupoles and bending magnets closer to the IP, these events come out of the beam envelope much sooner and can be a source of detector background.  Touschek scattering at the IP? Touschek scattering ~1/  x  y. For PEP-II, given the Touschek lifetime to be about 400 min and the average beta x, y around the ring is ~30 m and that the IP betas are 0.3 and we find a Touschek scattering enhancement at the IP of Normalized by length (1cm vs 2200 m) we get the IP rate to be ~7e-3 of the ring. For a 2A beam then there are ~1  10 7 Touschek events per second at the IP from the LER. This is a very crude calculation and we need to check this guess with a full blown simulation. M. Sullivan Seem very serious for PEPII as Luminosity grows up!!

M. Sullivan

Background parametrization based on February 2002 data The observed background is roughly twice larger than the sum of the single beam contributions G. Wormser Clean example from BaBar

SVT Background from HER (BW:MID) Moves toward half-integer HER sensitive SVT module (Does not have threshold shift problem): Background almost doubled after move to half-integer Again it has come down a bit during run-4 Note peak occupancy is 150% higher than average occupancy! For occupancies in all SVT modules, see: Another type of background, not on luminosity nor on beam current Degradation of the detector itself G. Wormser

It was noted that it may be difficult to distinguish “beam-beam” effect from “luminosity” background. KEKB experience: “beam-beam” effect make HER beam size larger and hit the smallest acceptance of the ring resulting increase of background.

What is wrong with the background? 1)Degradation of the detector itself. Light yield of scintillation crystal Gain drop of DC wire Damage in the readout electronic 2)High occupancy degrades the event reconstruction also. 3)Very high data trasfer rate

H. Kelsey Gain drop in DCH (BaBar) Still can survive for while by rasing HV

M. Kocian Light yield reduction in CsI (BaBar) as long as 10^34 operation

cf Belle ECL By A. Kuzumin Also in Belle 1/10 though.

Limits were set to the HER magnets. Synchrotron radiation from HER upstream magnets. This killed SVD 1.0 The downstream chamber was replaced with a Cu chamber SVD 1.1 SVD1.4 25% gain drop in 1.5 years SVD1.1 60% gain drop in 5 days SVD 1.4 S. Stanic Gain drop in Belle SVD

Resolution degration with occupancy G. Wormser Current operation Why we have very smallest beam pipe with very high background????

Example in G. Wormser Reconstruction efficiency of D* is really degraded seriously under high background

Decrease of x20 occupancy The electronics(Shaper/QT) deadtime is clouding out proper track hits under the high occupancy. Thus tracking efficiency and resolution depend on the readout system. Deadtime = 2200ns Deadtime = 600ns More proper hits to reconstruct a track! Senyo

Larger dead time. Greater loss of luminosity!

Do we understand the current beam background? G. Wormser from BaBar O. Tajima from Belle S. Stanic form Belle

Monitoring system for SVD2 kRad range RadFET RTD temp. sensor Low Gain PIN for Beam Abort Interlock High Gain PIN for monitoring/logging The conceptual design remained the same as for SVD1.4, however, we changed many things: New types of “monitoring hybrids”, specially designed for SVD2.0 IR 2 nd and 3 rd layer RadFET/Pt100 hybrids 1 st layer RadFET/PIN/Pt100 hybrids S. Stanic Monitor tool is very important!

Conclusions for short term issues We have to look far ahead: Minimum 3 years Look for worst case scenarios! Look for end-product effects! BABAR issues –Immediate concerns: SVT ATOM chip, IFRForward endcap –Next on-line: DCH DAQ –Longer term issues: SVT and EMC in 2008 Changes in background issues –Beam-beam tails –injections –trapped events

Conclusions for short term issues We have to look far ahead: Minimum 3 years Look for worst case scenarios! Look for end-product effects! BABAR issues –Immediate concerns: SVT ATOM chip, IFRForward endcap –Next on-line: DCH DAQ –Longer term issues: SVT and EMC in 2008 Changes in background issues –Beam-beam tails –injections –trapped events

Extraction SR in HER Single Beam 50 mA 100 mA 200 mA 400 mA600 mA800 mA HER Particle SR Hard-SR simulation Cool work! O. Tajima

Simulation gives an extremely good expectation! translated differently as Unbelievable ! (Karim) I don’t believe it (Steve, O)

Radiation Dose at SVD 1 st layer At Maximum Currents: HER 1.1A, LER 1.6A Outer-direction ~ 0 degree Inner-direction ~ 180 degree Particle-BG (LER) 22 (18) kRad/yr 14 (11) kRad/yr Particle-BG (HER) 44 (53) kRad/yr 29 (33) kRad/yr SR-BG 17 (8) kRad/yr 33 (29) kRad/yr Total 83 (79) kRad/yr 76 (73) kRad/yr (…) is 1nTorr pressure Data and simulation is consistent Touschek contribution is reduced based on measurement We can trust simulations Its uncertainty for abs. may be factor a few O. Tajima Simulation gives an extremely good expecttion! which can be translated as Unbelievable ! (Karim) I don’t believe it (Steve, O)

What background expected for the superBfactory? Good understanding of current background is being establisehd. Serious simulation study just started. Very high background extrapolated from the current experience (BaBar). Degradation may be manageable(BELLE).

K. Trabersi Serious study Just started with reallistic lattice

K. Trabersi 10 times higher. Smaller than they assumed in the detector design. 100 kRad/yr 1 MRad/yr

K. Trabersi Slight modification of Q magnet position easily changes the dose!

Very simple extrapolation. Is it OK to design the next detector beased on it?

About 80% of efficiency is kept in the slow  efficiency under x20 occupancy. Need higher efficiency to keep full reconstruction eff. Slow  efficiency from B  D*(D  slow )  recon. eff. of the slow pion ~ single track efficiency of slow p B  D*  reconstruction eff. including geometrical acceptance Senyo

Vertex resolution w/ B  J/  K S Vertex resolution is kept less than 160  m  (Z CP -Z tag ) Senyo

M. Kocian

PEPIII may be very similar to KEKB, that is simple extrapolation has no meaning!!

Idea for Hard-SR reduction HER-beam If we can bend beam  photon-stop far place SR If 2 times far place  1/4 BG Possible headache for KEKB- type IR design. O. Tajima

Injection Continuous Injection (trickle ) is necessary to keep the peak luminosity. To maximize the efficiency, switching injection pulse by pulse (LER HER) is very interesting.

Lifetime for luminosity Lifetime contribution HER lifetime (min) LER lifetime (min) Quantum Vacuum Touschek36045 Luminosity2550 Beam-beam tune shift 20 Total life w/o b-b2120 Total life with all10 J. Seeman We can’t live without a continuous injection anyway.

Beam pipe issue (today) Can we have smaller beam pipe ? Sullivan, – SR, I^2R, and HOM ?? Many technical obstacles…. Katayama –Beam is flat. Why not flat beam pipe? –What we can get with extremely flat beam pipe.

Side view of S-F beam pipe Vacuum or accelerator components (nano beta??) Silicon vertex detector (300  m thick) Beryllium beam pipe (500  m) 1.6 cm N. Katayama

S-F geometry vs current geom. Error on flight distance (  m) See difference in scale N. Katayama Perfect reconst. Bs mixing, B  D  etc

Summary of summary Many studies just started with the 0 th version of IR design It’s too simple-minded to design the detector based on the straight extrapolation from now. Hope to discuss in the next WS also on mechanical interface btw detector and machine like support, heat treatment around beam pipe, concept of IR assembly….