Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Progress of the BEPCII Injection System Kang Wen.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Status at DORIS Hall Bolted connections of Al- frame made conductive for grounding reasons. Power cable connections rerouted at the top connections. Magentic.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Intermediate Frame for Olympus Interface from Blast Frame to Argus rails Track gauge of Blast is 4645 mm while track of Argus is 3200 mm. We want to keep.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Compressor status AWAKE Technical Board meeting 19 August 2015.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
EDMEDM EDM Collaboration Meeting 3-06 Jan Boissevain, P-25 March 2, 2006 NCSU EDM Experiment Design Status.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
SBS Magnet and Support Status Robin Wines June 2013.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
22/07/2003TOF Gas System PRR (C. R. Gregory) 1 TOF GAS SYSTEM Production Readiness Review SYSTEM INTEGRATION.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
ELENA installation progress F. Butin / ELENA collaboration.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
The LHCb Installation Story
Integration issues at IHEP
WP02 PRR: Master Oscillator and RF Reference Distribution
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Polarized 3He target installation
Presentation transcript:

Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K. After holiday break 4 coils installed by August 18th, Joe Dodge from Bates supported us Other 4 coil ready for installation Survey revealed that Al – frames are 19 mm too low, instead of expected 5 mm Now shimming work underway Jan Hauschildt, MEA1, August 31st, 2010

Status at DORIS Hall Power to container switched on(8 * 16 Amps. in the hut) looks very tight Power for coils to be connected in September Inner detector frame will be installed soon Pipes for gas supply about to be installed Cooling water pipes manufactured and tested from DORIS supply to the distribution area Cooling water control will be switched to DESY standards Jan Hauschildt, MEA1, August 31st, 2010

Status at DORIS Hall, Hall 1 First shielding blocs installed Further shielding design underway Rails for inner detector frame hamper opening of Al – frames ( they stick out of the CAD model) Solution ? Quadrupole- and vacuum- support design underway Still missing : guided multiton rollers Jan Hauschildt, MEA1, August 31st, 2010