Table Dancer Team Members: Ryan Gray Dale Williams Emeric Rochford Dan Beard.

Slides:



Advertisements
Similar presentations
A.U.V. Emeric Rochford Dale Williams Bryan Douse Ryan Gray.
Advertisements

Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
A.G.I.L.E Team Members: Brad Ramsey Derek Rodriguez Dane Wielgopolan Project Managers: Dr. Joel Schipper Dr. James Irwin Autonomously Guided Intelligent.
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood February, Senior Project 2005/06 Undergraduate Project Proposal.
("/(o_O)\") RaWr! Design Review Presentation March 11, 2006.
Auto - Drive An Automated Driving Range. Team Members Mike Loiselle Jared Beland Jeremy Paradee.
September 23, 2003Jeff Wilson1 The Go-Go Gantry Jeff Wilson Lee Strobridge Allison Bodis David Carlson Mark Jarrett Jeremy Paradee.
Team Stargazer Dan Beard. Problem Statement To build an altitude and azimuth steerable satellite dish, with a receiver or a transceiver for communication.
Mr. Mixer (Automatic Mixing Machine) Final Presentation Alex Rust & Nate Lamie.
Team MASTers™ Craig Lalumiere David Cobler Michael White.
Table Dancer Design Presentation 9/22/04 Team Members: Ryan Gray Dale Williams Emeric Rochford Dan Beard.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Preliminary Design Review
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood November 10, 2005 Senior Project 2005/06 Undergraduate Project Proposal.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
KTD Micromouse Overview Team Goals Approach Outstanding Problems Future Solutions Final Status.
Team GPS Rover Alex Waskiewicz Andrew Bousky Baird McKevitt Dan Regelson Zach Hornback.
Mix Master Electrical Discussion Alex Rust & Nate Lamie.
A.U.V. Emeric Rochford Dale Williams Bryan Douse Ryan Gray.
A.U.V. Emeric Rochford Dale Williams Bryan Douse Ryan Gray.
Auto-Driven Vehicle By Jason Gajowski Nathan Schmarje 9/11/2003.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
KTD Micromouse OverviewApproach Potential problems Personal Expectations Team Goals.
A.U.V. Emeric Rochford Dale Williams Bryan Douse Ryan Gray.
Table Dancer Final Design Presentation 10/20/04 Team Members: Ryan Gray Dale Williams Emeric Rochford Dan Beard.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
LINE FOLLOWER ROBOT USING I-BOT mini V3
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
Project Micromouse: “Microtaur”. Team Excelsior Team Lead ▫Janel Raab Team Members ▫Devon Griggs ▫Devin Helmgren ▫Emilia Holbik Faculty Advisor ▫Dr. Wayne.
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
The SFA Rover Team Project. The SFA Rover  Must be demonstrated at the beginning of the last lab of the semester, Dec 11 th.  Teams can work on this.
To come up with a practicum project that full filled the 411 requirements Create a fun project that would get kids interested in science and engineering.
Wall-E Prototype I Team 1 Xin Jin
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Status Report #2 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
TEAM 5248 FERMION Members: Yi, Justin, Hamza , Ben, Marcus, Sean, Sai, Devin, Christine, Erin.
SECON Team Zulu IEEE SoutheastCon Hardware Competition 2010.
ECE477 Midterm Design Review: Team #
Team: CHEE WHOOO Spring 08. The Team Mitchell La Puente-Project Leader Josh Miyamoto-Software Richard Ordonez-Hardware.
Unit 9 – “A BIG State Machine”. Introduction New Topics Nested Case Structures Reusable Code.
Team 10 Julia Liston. Project Overview  Our team’s goal is to build a prototype of a robot that can: Use GPS to locate a lost person Autonomously navigate.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
Temperature Controlled A/C Vents Robert Prieto Hassan Ali Alshwaf Ivan Vasquez Nacha Muthuvalliappan January 31, 2011 Temperature controlled A/C vents.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
DOODLE DRIVE Presenter: Peachanok Lertkajornkitti Team 6 Reliability and Safety Analysis.
Build Presented by: Pat Capulong Thuan Doan Chani Martin.
The 4th Annual Colorado Robot Challenge
Autonomous Rescue Vehicle ( Team 10 )
Performance Test 3 Week 5 Day 3 Instructor:
Community College of Aurora Cheez Botics
CSU-Pueblo Team: Paul Rael, Shae Anderson, Atilla Turkoz, Yudhi Paudel
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger
ECE 477 Final Presentation Team 4  Fall 2011
E190Q – Final Project Presenation
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 5  Fall 2006
Participant Name FRC Team #
Aciequor Workshop spAts IIT Kharagpur.
IT323 Project Phase#2.
Human Turntable Daniel Kalinin, Daniel Zhang, Jacob Taylor Team 9.
By: Benjamin G., Candy L., Miranda B., Rovertho B. POE EDHS
ECE 477 Final Presentation Group 10  Spring 2005
Super User Training Lesson #1 Administrative
Presentation transcript:

Table Dancer Team Members: Ryan Gray Dale Williams Emeric Rochford Dan Beard

Primary Objective Design a machine to navigate the perimeter of a tabletop. Navigate table with no direct user input Complete a predetermined number of labs before stopping

Basic Approach. HC08 microcontroller Dual motor controller Twin motor propulsion Touch based sensor navigation (left, right) Optical lap counter IR on/off control

Block Diagram

GANT CHART Week 1Week 2Week 3Week 4 Week5Week 6Week 7 Week 8 Brainstorm Research Prototype / Test Build Troubleshoo t / Re-test Present

Progress To Date Rough chassis design Possess basic drive train components Basic state diagram for motor controller

Program Overview