Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Large Magnetic Volumes for Neutrino Factory Detectors A.Bross ISS Detector Phone Meeting June 22, 2006.
Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Issues concerning the Design of the Tracker Solenoids Michael A. Green Lawrence Berkeley National Laboratory 17 August 2005.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
18 June 2004AFC meeting1 MICE  functions and so on Work in progress…. Observation by Ulisse Bravar at CERN meeting that beam not matched in baseline (Proposal.
MICE Meeting at Columbia University June 13, 2003 Implementation of argon gas jacket Edgar L. Black IIT.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Progress on the Coupling Coil & Focus Coil Interface Engineering
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
MICE CM31 Schedule summary
Spectrometer Solenoid Fabrication Status and Schedule
Two ways to discuss color 1) Addition 2) Subtraction
Experimental equipment Edgar L. Black February 17, 2019
What Color is it?.
Draw dots using 2 colors to find the “Make 10” fact.
Presentation transcript:

Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT

New layout Based on Mike Green’s data dated March 17, 2004 Dimensions in black represent positions of coils at room temperature Blue and magenta colors indicate dimensions change at 4.3 K

Plan view of ½ the magnet lattice and the outline of the modules vacuum vessels

AFC Module

RFCC Module

Integration of the cooling channel

Work in progress Revise the current magnet lattice information draw lattice plan and elevation Module to module interface design Installation stages of MICE Support structures Alignment