GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
SVAC/PVOC&A Meeting, February 6, 2006 Anders W. Borgland 1 Instrument Analysis Activities Anders W. Borgland Science Verification, Analysis and Calibrations.
SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Summary and Future Plans Eduardo do Couto e Silva Instrument Analysis.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT ProjectDOE/NASA CD3-Critical Design Review, May 12, 2003 S. Ritz Document: LAT-PR Section 03 Science Requirements and Instrument Design.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT ProjectIA Meeting – June 17,2005 E. do Couto e Silva 1 New additions to the main page.
R.Dubois 12 Jan 2005 Generating MC – User Experience 1/6 GLAST SAS Data Handling Workshop – Pipeline Session Running MC & User Experience Template for.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 E. do Couto e Silva 1 Introduction to Instrument Workshop 6 Eduardo do Couto e Silva Feb 27, 2006.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectIA Workshop 6 – Feb27,2006 S. Ritz Backgrounds and Trigger Rates 1 Backgrounds and Trigger Rates on Orbit S. Ritz with many contributions.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
SVACInstrument Analysis Workshop IV Quatorze Juillet, 2005 Anders W. Borgland 1 Overview of Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project IA meeting, 21 April 2006 David Smith Bordeaux 1 Muons from Flight SoftWare (= “FSW”) See my WorkShopSix presentation to understand.
GLAST LAT Project Instrument Analysis Workshop #4, 14 July 2005 David Smith CAL calib at SLAC SVAC1 Stability of the CAL Calibrations Online script “suites”
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT Project Instrument Analysis Workshop September 27, 2004 E. do Couto e Silva 1/11 Overview of the Instrument Analysis Workshop Series Eduardo.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
I&T&C Organization Chart
Integration, Test, and Calibration
GLAST Large Area Telescope Instrument Science Operations Center
Overview of Instrument Analysis Effort
Overview Goal Study GEM variables in SVAC ntuple
TKR to CAL for 16 Towers The usual TKR extrapolation to CAL study, for the 16 tower data. Check calibrations, look for problems, etc. Today -- “work in.
Calibration and Analysis Methods Group Report
Mini Tower Preliminary Results
CR Photon Working Group
Integration and Test Organization Chart
Eduardo do Couto e Silva Feb 28, 2006
GLAST Large Area Telescope
Studies of the Time over Threshold
Integration & Test Instrument Operations Coordination
SVAC Configuration Verification
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
Presentation transcript:

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations aka the “Don't Shoot the Messenger” talk From the ROYAL Anders

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 2/7 Vive la France – 14 Julliet ! From Eric From Warren et les Etats-Unis aussi…

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 3/7 We are doing fine ! Fraction of ToT saturations: 0.21 % all events 0.05 % muons 0.31 % showers From Martin From Nico From Zach From Pisa (Michael et al)

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 4/7 Really fine ! Wrong calibration constants applied for some towers From Hiro From Monica Tower in Pos#8Tower in Pos#9 From Mizuno

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 5/7 From Dan Flath…

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 6/7 What next?

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 7/7 3-in-a-row TKR Trigger we want to find topology to maximize timing effects in TKR distributions Bits Muons usually produce trigger requests for all of the 16 allowed combinations of 3-in-a-row There is no way to know which of the 16 3-in-a-row is responsible for the trigger Bits Bits Trigger on top onlyTrigger on bottom only From Dario

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 8/7 CAL trending/monitoring Hi rate (20 kHz, red), Big events (yellow) B/2 (blue) 27 (red) 29 (yellow) 28 volts (B/2, blue) From Dave

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 9/7 Plane ● Base ● Min ● Max Top Plane = 35 Bottom Plane = 0 From Stefano and Claudia PDU Voltage

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 10/7 Muon φ distribution From Francesco

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 11/7 Example of Analysis linked to STR From Luis

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 12/7 What should we do for Aug 29 Workshop? (1) Study MC generated with ACD + 8 towers –Anders will start that on Monday –Dario and Monica will help with initial checks before we release it to the group –Need to get familiar with ACD variables –Start thinking how we will set up tests using ROIs to do analysis that we could not do so far Present a list of distributions that capture geometrical dependencies since we can not spend too much time when the full LAT is assembled to learn all that –Francesco Loparco presented some good ones –They will change as we add more towers Show trending results for calibrations (function of time and per tower) –Would like to have a comprehensive presentation from both TKR and CAL Alignment –Tracy kindly accepted the role to coordinate the effort to produce inter and intra- tower results using TKRrecon in its native framework –Probably this task will be for those with more expertise with SAS recon and usage of G4 propagator We presented results comparing data using different PDU voltages –How do we know they were set correctly? –Need to empower users to look at housekeeping data –Only SVAC group does that right now

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 13/7 What should we do for Aug 29 Workshop? (2) Data Analysis from Special test Requests –Most likely 8 towers without ACD –Eduardo will lead the effort and has already started discussions with Hiro, Eric and Su Dong based on inputs from presentations in this meeting –As data becomes available we will post it in the IA list and discuss its quality on Friday meetings Propose a list of data taking configurations for the full LAT based on what we have learned so far –List should contain –Hardware configuration we want to test –Trigger settings –Number of events –Eduardo will send a message to science working group coordinators to request a list of instrumental effects they are worried about at the 1 and 10% level for on-orbit effects –We will iterate and see what is relevant for GND tests from the point of view functionality and performance

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 14/7 Let’s write a little... Analysis Memo (in LAT Docs) –Crucial for documenting our effort –Essential for sharpening the thought process –It is a Live document –Should take a day to write »Can keep updating it »Benoit had a good example from GSI studies –Goal of the data analysis –State run ID’s –Trigger conditions –Hardware configuration –Analysis cuts –Assumptions behind analysis cuts –Does not need to be perfect !!! »It is not a journal publication Overall IA effort results due Dec 2005 –Eduardo and Nico will work on a draft

GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 15/7 We already miss you Dave Thank you Eric for the cartoon! Thanks for putting up with us for an entire year !!!!!!!!!!!