Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,

Slides:



Advertisements
Similar presentations
Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
Advertisements

CHAPTER 3 MICROWAVE ‘O’ TYPE TUBES
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
RF background simulations MICE collaboration meeting Fermilab Rikard Sandström.
Design and test of a high-speed beam monitor for hardon therapy H. Pernegger on behalf of Erich Griesmayer Fachhochschule Wr. Neustadt/Fotec Austria (H.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Temperature Dependence of the Crystal Properties of 18-fold Segmented HPGe Detector Allen Caldwell, Daniel Lenz, Jing Liu, Xiang Liu, Bela Majorovits,
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
9 September 2009 Beam Loss Monitoring with Optical Fibers for Particle Accelerators Joint QUASAR and THz Group Workshop.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
Managed by UT-Battelle for the Department of Energy SNS BLM System Overview Detectors, Measurements, Simulations Alexander Zhukov Saeed Assadi SNS/ORNL.
Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96.
P.W. Gorham et al.. TEST BEAM A SLAC Time relative to beam entry Antenna V/V rms Time relative to beam entry Antenna V/V rms close to shower maximumshower.
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
D. Valuch, N. Schwerg, O. Brunner (CERN)
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Proportional chambers with cathode readout in high particle flux environment Michał Dziewiecki.
Chem. 133 – 2/9 Lecture. Announcements Return Q1 + HW 1.1 This week’s seminar: on aerosol air pollution in Asia Lab –Sign up for term project instruments.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Multi-bunch acceleration in NS-FFAG Takeichiro Yokoi (Oxford University)
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
D. Lipka DESY Hamburg Dark current Monitor for the European XFEL, tests at PITZ and FLASH.
Philip Bambade, Pierre Barillon, Frédéric Bogard, Selma Conforti, Patrick Cornebise, Shan Liu, Illia Khvastunov Journée PHIL
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
Areal RF Station A. Vardanyan
Beam Secondary Shower Acquisition System: Front-End RF Design
Phase Feed-Forward Piotr Skowroński (CERN)
Spectral methods for measurement of longitudinal beam profile
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Readout System of the CMS Pixel Detector
CLEX* Status and Plans CTF3 complex CLEX
CLIC Workshop 2016: Main Beam Cavity BPM
F.Marcellini, D.Alesini, A.Ghigo
Controls CBETA controls will extend existing EPICS control system
LHC BLM system: system overview
Chem. 133 – 2/9 Lecture.
Electric Field Amplitude (MV/m)
Low Level RF Status Outline LLRF controls system overview
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Beam Loss Simulations LHC
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Detecting phase Alexandra Andersson Jonathan Sladen
Presentation transcript:

Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston, Il - ICAR Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston, Il - ICAR In the CLIC project, the 30 GHz RF power source is produced in the so called ‘Drive Beam decelerator’ where resonant structures called ‘Power Extraction and Transfer Structures (PETS)’ decelerate a high current electron beam and convert the particles’ energy into RF power. The strong coupling in the PETS could lead to important beam losses if the beam optics are set incorrectly. It is thus crucial to monitor beam losses accurately in order to check the Drive Beam decelerator stability, to protect the accelerator itself from any beam induced damages and to keep the radiation level and activation as low as possible. The goal of this study is to develop a tool to quantify the beam losses along a PETS tank installed in the CLIC Test Facility 3 (CTF3) machine at CERN. Any future machine protection system will rely on measuring accurately the position and intensity of beam losses. Beam Loss Simulations Simulations of e + /e - showers distribution inside the PETS were generated with Geant3.21. The losses were simulated for 10M electrons with an energy of 50MeV hitting the top of the structure every 5cm with an angle of 3mrad. Simulations were also generated for 20cm of beam pipe before and after the PETS tank. Beam loss in the beam pipe induces secondary particle fluxes an order of magnitude higher than in the PETS A 1.5m long PETS Tank is already installed in the CTF3 tunnel 5 detectors are distributed along the PETS Tank to monitor the beam losses The detectors are Aluminum Cathode Electron Multipliers. They have a fast time response (2ns) which allows to observe the time evolution of the beam losses All the BLM’s are fed in parallel from the same power supply The output signals are then sent to fast Analog to Digital converters Experimental Setup e-e- Tunnel Gallery 8 channels digitizer VME module 12 bits 96 MHz 0-2kV, 100mA Power supply Electronic Rack Looking inside a PETS Tank Vacuum tank diameter is 30cm Resonant Cell Iris diameter is 6.7mm Resonant cavities 30GHz Output Waveguide Vacuum Tank For beam loss at a given zed position, the flux measured strongly depends on the transverse position of the detector (Phi angle). For beam loss at a given phi position, the measured flux only depends on the distance from the detector to the beam loss position : It is maximum for losses that occur 40cm before the detector. mn Amplifier box High voltage from the gallery SIC Signals Signals to the ADC’s High voltages to the SIC Future Beam Loss Monitoring Setup SIC detectors specifically designed for beam loss measurements will be used to monitor the showers along the PETS. The SIC detectors are sensitive to charged particles and offer a very good resistance to radiation and a high dynamic range (>10 5 ). The SIC output signals will be amplified in the tunnel using a 300MHZ, 26/46dB amplifier card Installing more detectors at each zed position to cover the azimuthal angle. Connect them together and use a single electronic per zed position 6 detector zed positions: every 40cm starting at the beginning of the tank An improved detector configuration that takes into account the transverse distribution of the showers is foreseen to measure beam losses accurately. 300MHz 26 to 46dB amplification Multiple tests and processing steps are required to ensure that each detector is measuring the best signal possible and that clear signals are used in the analysis step. Beam Loss Analysis Tool Display Only one loss position per beam time slice Beam energy is constant throughout the PETS Assumptions Qualitative and Quantitative Beam Loss Analysis First, the qualitative analysis phase finds overall patterns of the signals to qualify the beam loss. The following beam loss cases are investigated: Continuous loss all along the tank Constant intensity loss for multiple beam timings Region of loss for the beginning, middle and end of the beam Then the quantitative phase compares the signals’ time slices to the simulations to find the beam loss zed position and intensity. Beam Loss Analysis Tool The beam loss analysis tool was developed with Matlab 6.5. It is divided into four main parts: a signal quality testing phase, a signal processing phase, a qualitative analysis phase and a quantitative analysis phase that relies on the simulations’ results to find the position and intensity of beam loss along the PETS tank. Flux as a Function of Distance to Beam Loss Position for Detectors at phi = 90 Flux for Detectors at zed = 82 cm Beam Loss Signals Before and After Signal Processing Check for detector saturation Check for detector long decay time Check signal amplitude and suggest best amplification Correct zero offset Synchronize signals Smooth noise Select timing region where beam is present Reset amplitude according to detector calibration and amplification Signal Quality and Signal Processing Future Software Improvements Assume beam is decelerating Error Calculation Multiple PETS in a row