Bob Law FAC Oct 24, 2005 1 Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
David Saenz FAC CF April 07, 2005 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
Bob Law FAC Review April 14, 2007 LCLS Conventional Facilities Construction Field Change Orders Bob Law.
David Saenz FAC CF Oct 12-13, 2004 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
Richard Hislop FAC October Construction Safety Richard Hislop.
M. Scharfenstein - ES&H Coordinator 8 June 2009
NCSX NCSX DCT Project Meeting Raki Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PROJECT – D TO C Site DC Transmission PROJECT MANAGEMENT.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
West Cambridge Data Centre Ian Tasker Information Services.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
OTE Building PMG Report September 10, 2012 Rhonda Merchut 1.
Meeting of the LCLS Facilities Advisory Committee
25th Avenue Grade Separation
25th Avenue Grade Separation
Sector 20 Project Overview
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES STATUS
CONVENTIONAL FACILITIES LCLS Office Space
Conventional Facilities (WBS 1
Details supporting the increase
CONVENTIONAL FACILITIES LCLS Office Space Procurement
CONVENTIONAL FACILITIES
LCLS Injector System Overview D. H
Richard Hislop Construction Safety Coordinator
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
Javier A. Sevilla Conventional Facilities
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
PROJECT SAFETY Richard Hislop.
Presentation transcript:

Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost Estimate Controls Challenges ES&H Issues Progress to Date Next Steps

Bob Law FAC Oct 24, Site Plan Traffic detour Contractor Parking and Lay Down Area Along Gallery Road N Klystron GallerySector 21

Bob Law FAC Oct 24, Description Demolition of existing 1700 ft 2 Alcove Construction of new 2250 ft 2 Bldg. Construction of new 300 ft 2 “RF Hut” Cable trays to be partially installed by Sector 20 General Contractor. Electrical Equipment - New 1500 KVA Substation by Separate Subcontract. Feed for Substation K-10B currently being installed during October Down Time. New 2000 Amp Motor Control Center to be installed by K10B Subcontractor Service for LCLS Sector 20 equipment only (not Sectors 21-30) Siding removed Hazardous waste (lead Paint) removal

Bob Law FAC Oct 24, Progress Photos Structure demolition Structure Demolition K10B Support Pad and Grounding K10B Transformer Delivery

Bob Law FAC Oct 24, Progress Photos Excavation area for vent pipe relocation Equipment pads excavation Equipment Pads K10A and K10B transformers

Bob Law FAC Oct 24, Sector 20 Installation (future) Elev 0’-0” Elev -35’-0”Sector 20 Laser Facility Klystron Gallery Linac tunnel North

Bob Law FAC Oct 24, Floor Plan Laser Bay Load/ Lock Local control RF Hut HVAC Klystron Gallery

Bob Law FAC Oct 24, Organizational Chart Sector 20 Facility Eric Bong – Injector and Linac Systems Manager David Dowell – System Physicist Sasha Gilevich – Optical Engineer Ron Akre – RF Systems Manager Conventional Facilities David Saenz – Conventional Facilities Manager Bob Law– CF Project Manager / CAM (managing Sector 20 as of 10/18) Jim Welch – CF Systems Physicist Jesse Saldivar – CF Technical Assistance Anita Malahowski – Cost/Schedule Richard Hislop – Construction Safety Manager Bruce Patten – Purchasing Officer Conventional Facilities Project Office Science Requirements Cost/ Schedule SAFETY Linac System Management

Bob Law FAC Oct 24, Schedule Title 2 Construction Package Completed Feb. 22, 2005 Bid and contract with general contractor RFP issued March 22, 2005 Original Bids received April 14, 2005 Re-bids received July 7, 2005 Award originally scheduled for May 9 –Awarded August, ‘05 Construction Kickoff August ‘05 Beneficial Occupancy scheduled March 31, 2006 Critical Path - Substation hardware PO went out June 30 th, equipment installed Oct ’05, currently undergoing testing, 12KV feeds to be complete this week.

Bob Law FAC Oct 24, Current P3 Schedule

Bob Law FAC Oct 24, Current P3 Schedule

Bob Law FAC Oct 24, Cost Estimate – Estimated Construction Cost - $2.66M $2,030,000 construction main subcontract $427,000 electrical equipment LLP separate subcontracts $31,000 site preparation $174,000 commissioning and project closeout

Bob Law FAC Oct 24, Challenges Management Implementation of LCLS Construction Policies & Procedures, ISMS Contractor management is key. Scheduling has been nearly linear up to now. Cost/Schedule Risk Late design change and late design may impact cost and schedule. (Cable Tray and process water) Contractor ISMS learning curve has impacted early contractor schedule Technical Know and understand the user requirements to complete a successful project

Bob Law FAC Oct 24, Progress to Date Title 2 Design package completed 2/22/05 SLAC Work Authorization 9/2/05 Contractor on site 9/2/05 Demolition of existing structure complete 10/10/05 K10B transformer pad and equipment installed Site work for utility relocations, new foundations and new equipment pads in progress. Equipment slab excavation and reinforcement in progress Relocation of vent pipe in progress

Bob Law FAC Oct 24, ES&H Working through learning curve for subcontractor to understand and work to principles if ISMS per LCLS Environmental Safety and Health Plan. Electrical work on up to 12KV Steel Erection Hoisting and Rigging Demolition and Hazardous material handling Trench work Fall Protection

Bob Law FAC Oct 24, Next Steps Complete design for lower vault process plumbing, fire protection Provide EPICS integration (to be funded) Safe Completion of Construction Project Current Beneficial Occupancy Level 3 Milestone is 3/31/05. Currently on track to meet that schedule