H2 Safety Review - response paul drumm MICE VC, March 29 th,2006.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
1 AFSWG Mtg 15 Aug 2003 Elwyn Baynham RAL Safety Overview Work done by RAL Group Contributors Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov.
Hydrogen R&D system HAZOP
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
Safe Job Analysis The objective of this procedure is to prevent accidents by operating a systematic procedure for: Identification of hazards associated.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
MICE Safety Review Process and Schedule Elwyn Baynham Tom Bradshaw Iouri Ivaniouchenkov Columbia Meeting June 2003.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
A presentation at the MICE Video Conference on Wednesday the 5 th of May 2004 Response to the Safety review comments by Wing Lau -- Oxford.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Student Health & Edinburgh Napier University Health & Safety Team | Edinburgh Napier University.
W504 - Management of asbestos containing materials.
Mechanical Safety Systems and DSEAR Compliance
Patrick Thornton, SNS/FPE June 9, 2008
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Food Safety Act, food hygiene regulations, HACCP, HASAWA, HSE.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Important informations
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
11th International Symposium Loss Prevention 2004 Prague Ľudovít JELEMENSKÝ Department of Chemical and Biochemical Engineering, STU BRATISLAVA, SLOVAKIA.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
Software Safety Case Why, what and how… Jon Arvid Børretzen.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Progress on Hydrogen R&D System
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Managing Fire Safety In Common Parts of Flats and Mixed Use Buildings Simon Gibbins Merseyside Fire and Rescue Service.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Six Sigma Greenbelt Training
ODS & SGG Considerations for Changing a System
Hydrogen System Update
Strategy for conformity of non-standard cryogenic equipment
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
Student Health & Edinburgh Napier University
HOMEWORKERS AND HEALTH & SAFETY
Parker domnick hunter. Safety of Electrical and
Risk Management Student Powerpoint
Presentation transcript:

H2 Safety Review - response paul drumm MICE VC, March 29 th,2006

Osaka CM Point by point answers were shown by Yury in Osaka Mostly in agreement with review One or two places where robust (analytical) answers are needed. My thoughts and suggestions…in red

Review ItemResponse 1The use of the bolted connections for the absorber module windows, with pressure monitoring between the two indium seals was considered to be an appropriate choice given the practical experience of this type of seal within a vacuum environment. An issue for the absorber group – and we should reflect an answer from them? 2The use of a non-flammable super insulation material within the hydrogen system should be investigated. This will be done – we will use polyimide material. Is there any impact? 3The effect of helium on the performance of the hydride bed should be investigated as a matter of urgency as this may impact the design. However, the need to maintain a positive pressure in the system, to avoid oxygen ingress, was agreed. This has been investigated with the manufacturer and there is no effect. Document? 4Quality control, configuration management and security of the hydrogen system software need to be assured. Agreed – but what is the proposal? 5Positive independent feedback of valve positions etc. should be implemented in the control system. Agreed

6It is recommended that the build up of explosive atmospheres within the Hall as well as within the test rig be fully considered and that compliance with The Dangerous Substances and Explosive Atmospheres Regulations 2002 and the European Directives ATEX 137 (procedures) and ATEX 95 (equipment) is addressed. We will implement external hydrogen sensors. We have considered the release of hydrogen into the hall and incorporated fans and vents in the roof space. Is this a sufficient answer? Are there places where H gas can accumulate despite the fans/vents? 7Although the estimated volume of gaseous hydrogen in the cryogenic system is less than 2% of the total volume of the Hall, there can be local concentrations that exceed this particularly at the ceiling level due to the fact that the hydrogen will rise. Suitable venting should be provided. This has already been considered and fans and vents are being installed in the roof space. As above 8Hydrogen detectors and oxygen depletion sensors should be installed in the Hall, with associated evacuation alarms. Upon detection of hydrogen within the Hall, all non-compliant electrical systems should be automatically shut down. Certain sub-systems such as evacuation lighting, ventilation and safety systems should be made compliant and remain operational. Agreed. What is the implication? Does this mean all systems in the hall are to be shutdown? And does this affect ISIS? Are there safety systems that should not be shutdown? This needs to be reviewed. 9The reliable performance of the hydrogen detectors and oxygen depletion detectors, within the atmosphere in which they will be required to work, must be assured (type of sensor, location, maintenance, etc.). This was an issue as we planned to have hydrogen sensors in the exhaust line of the exhaust pumps where they could suffer from contamination. The sensors will be subject to a maintenance schedule. What is the life cycle of a sensor? I don’t know how to assess this. * The original assesment was that the hydrogen zone did not extend out of the absorber vessel/pipe work. Is this changed or can the original view be defended?

10Suitable Uninterruptible Power Supplies (UPS) should be provided for the control and safety systems. Agreed. 11The location of vent pipe outlets, particularly their height above the roof, should be designed to prevent fire hazards (the industry standard is 3m). Implemented. 12Suitable fire detection and extinguishing equipment should be provided in the Hall. There is lab policy on this which will be followed. 13It is recommended that the procedures for access to the Hall should be reviewed. Agreed 14A permit to work system should be adopted for people who need to work in the MICE Hall. Agreed 15Suitable personal protective equipment (fire retardant / anti-static clothing and footwear) should be worn in the Hall when hydrogen is present in the system. Agreed – a policy will be developed as part of the overall risk assessment.

16Activities permitted to be carried out in the Hall whilst liquid hydrogen is present should be carefully considered (for example, hoisting and rigging activities should be prevented). Agreed 17Clearly defined operating procedures which include responses to abnormal conditions should be developed and presented at the operations review. Agreed 18All persons involved with operating the hydrogen system must be trained in both safety aspects and operating procedures. Agreed. What are the terms of the proposed training? 19Consideration should be given to procedures to be adopted in worst case scenarios such as crane accidents, aeroplane crash etc. Agreed. What are the chosen worst case scenarios to be investigated? 20The CERN safety system (DSS) for LHC experiments could be studied as a possible basis for the MICE safety system. This will be investigated. This needs a mechanism for discussion? D&S?

Finally Additional items in report not covered in above list: The Panel concluded that the HAZOP study as presented is incomplete. A full HAZOP study, and a failure modes effects analysis (FMEA) carried out with the aid of an external specialist, should be completed as a priority.  What are the terms of the request to AP on the HAZOP?  The findings of these studies and the response of the MICE team should be independently examined before the designs finalised and accepted. Keep this in mind! We may have an idea of this, but how is this to be done? We wish to stress that the above remarks are restricted to the safety issues associated with the handling of liquid hydrogen. We have not considered the wider risks that may be encountered in carrying out the R&D activity. We suggest that a full qualitative risk assessment is undertaken by the MICE team to ensure that all hazards have been identified. Presumably this should also have explicit agreement? Finally, the Panel is of the opinion that no further external safety review of the Hydrogen Delivery System, R&D stage, is required before the proposed operations review, provided that the HAZOP study and FMEA are satisfactorily completed. We agree with the MICE team that a review of how the Hydrogen Delivery System interacts with an absorber focus coil module as well as with the full control and interlock system of the MICE experiment will be needed before the implementation of the next stage.  Operating procedures, systems of work  RISK Assessment  FMEA  HAZOP

Timetable Review response at D&S –meeting being arranged ~soon! Finalise Response ~mid April Response sent to TB  EB  RAL Management ~ end April Timely discussions in D&S group