Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 13 (30/9-1/10 2009), ASTRID2 and its RF system.

Slides:



Advertisements
Similar presentations
Institute for Storage Ring Facilities, Aarhus,
Advertisements

USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
SSRF Light Source Complex Zhao Zhentang for the SSRF Project Team Shanghai Symposium on Intermediate Energy Light Sources Shanghai China, September 24-26,2001.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
R. Bartolini, John Adams Institute, 20 November 20141/30 Electron beam dynamics in storage rings Synchrotron radiation and its effect on electron dynamics.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
SESAME Storage Ring RF-System
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Lecture 5 Damping Ring Basics Susanna Guiducci (INFN-LNF) May 21, 2006 ILC Accelerator school.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
PETRA III, A New High Brilliant Light Source At DESY
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
ALBA RF Systems Francis Perez.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Investigation of Injection Schemes for SLS 2.0
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Off-axis injection lattice design studies of HEPS storage ring
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
Diamond Light Source Status and Future Challanges
Status of the ASTRID2 facility
Bocheng Jiang SSRF AP group
Low Emittance Rings 2014 Workshop
Lecture 1: Synchrotron radiation Lecture 2: Undulators and Wigglers
Coupling Correction at the Australian Synchrotron
Recent Studies of Injection System at
An overview the ASTRID2 storage ring and its RF system
Machine Operation and Progresses in SSRF
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
Operation Progress and Upgrade in SSRF
ILC 3.2 km DR design based on FODO lattice (DMC3)
ILC 3.2 km DR design based on FODO lattice (DMC3)
Status of the ASTRID2 RF systems
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
CEPC SRF Parameters (100 km Main Ring)
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

 ASTRID2 is the new synchrotron light source to be built in Århus, Denmark  Dec 2008: Awarded 5.0 M€ for ◦ Construction of the synchrotron ◦ Transfer of beamlines from ASTRID1 to ASTRID2 ◦ New multipole wiggler ◦ We did apply for 5.5 M€  Cut away an undulator for a new beamline  Has to be financed together with a new beamline  Saved some money by changing the multipole wiggler to better match our need 2ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

◦ Electron energy:580 MeV ◦ Emittance:12 nm ◦ Beam Current:200 mA ◦ Circumference:45.7 m ◦ 6-fold symmetry  lattice: DBA with 12 combined function dipole magnets  Integrated quadrupole gradient ◦ 4 straight sections for insertion devices ◦ Will use ASTRID as booster (full energy injection)  Allows top-up operation 3ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

4

5

6 General parametersASTRID2ASTRID EnergyE [GeV]0.58 Dipole fieldB [T] CircumferenceL [m] CurrentI [mA]200 Revolution timeT [ns] Length straight sections[m]~3 Number of insertion devices41 Lattice parameters Straight section dispersion[m]02.7 Horizontal tuneQxQx Vertical tuneQyQy Horizontal chromaticitydQ x /d(Δp/p) Vertical chromaticitydQ y /d(Δp/p) Momentum compactionαpαp Coupling factor5 % Synchrotron Radiation parameters Synchrotron radiation integralsI 1 [m] I 2 [m -1 ] I 3 [m -2 ] I 4 [m -2 ] I 5 [m -1 ] Energy loss per turnU 0 [keV/turn] Synchrotron radiation powerP 0 [kW] Natural emittanceε H [nm] Diffraction limitλ [nm] Characteristic wavelengthλ c [nm] Characteristic energyε c [eV] Horizontal damping timeτ h [ms] Vertical damping timeτ v [ms] Longitudinal damping timeτ s [ms] RF parameters Damped energy spreadσ E /E [0/00] Damped bunch length[cm] RF frequency[MHz] Revolution frequency[MHz] Harmonic numberh1614 RF voltage[kV]5030 Overvoltage factorq8.14 Quantum lifetime∞∞ Synchrotron frequency υ =Ω/2 π [kHz]1020.6

7ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

 Sep. 2009: Order of ◦ Magnets on girders for the synchrotron  Dipoles, Q-poles, Sextupoles, correctors ◦ Fast magnets with power supplies  Extr. Kicker, fast bumpers, inj. Septum  Timeline ◦ -2010: Design and order remaining items ◦ 2011: Build and commission synchrotron ◦ 2012: First beamlines on ASTRID2 ◦ 2013: All beamlines transferred to ASTRID2 8ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

 105 MHz (like ASTRID)  Main RF parameters ◦ Harmonic:16 ◦ RF voltage: kV ◦ Synchrotron frequency:10-17 kHz ◦ Synchrotron radiation power:~1.4 kW ◦ Cavity power:0.8-7 kW  10 kW tube-based FM transmitter (triode) ◦ Tube-based FM transmitters are  Cheaper  More robust 9ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

 Collaboration with MAX-lab ◦ MAX-lab needs 8 cavities (100 MHz) for MAX IV  We need 2 cavities (105 MHz) (a spare for ASTRID1) 10ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system ◦ New MAX-lab cavity  Based on MAX II cavity  Use Electron Beam Welding instead of vacuum brazing  Proposal: Have industry build after MAX-lab RF design ◦ MAX-lab will also build a 300 MHz Landau cavity

 We will need a new LLRF for ASTRID2  The present ASTRID LLRF is ◦ Old, Analog  Risk of failure, not easy to repair/maintain  We are seeking a solution which is ◦ Simple (we have limited resources) ◦ Adequate  Two possibilities ◦ Fully digital:  Direct digital sampling of down converted signals  Others achieve 0.1% stability ◦ Analog down conversion to baseband  Digital control of baseband signals  Stability: ~1% 11ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system

 Digital control of baseband signal ◦ Either with IQ modulators and demodulators or with amplitude and phase ◦ A computer (PC) running LabVIEW Real-Time with FPGA equipped multifunction card to measure and control the baseband signals  NI PCIe-7851R/7852R:  Virtex 5 FPGA, 8 AI, 750 kS/s/ch, 8 AO, 1 MS/s/ch, 16 bit  PID Loop rates in excess of 100 kHz  Cavity fill time has a 3 dB point at 6 kHz  We believe this solution is ◦ Simple, but adequate ◦ Flexible ◦ Allows easily integrated diagnostics ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system12

ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system13 PreAmp +40 dB, 10 W FM transmitter +36 dB, 10 kW Splitter Master oscillator MHz Rohde&Schwarz SMY01 or DDS Combiner Phase shifter Atten- nuator -5 – -55 dB -180° – +180° optional Fast feedback loop Dx RF splitter DM1 DM2 Dx Realtime computer with IO (e.g. PC (or an NI Compact RIO) with LabVIEW RealTime) adcMOlevel dacA dacφ MO adcCavQ adcCavI adcFPWQ adcFPWI dacPlunger adcRPW Attenuator/ gain -33 – +25 dB Phase shifter -180° – +180°

 Have shown you ◦ The new ASTRID2 SR source ◦ The RF system for ASTRID2 ◦ Proposal for new ASTRIDx LLRF  Would appreciate feedback on our ideas ◦ Analog system (digital control of baseband signals)? ◦ Fully digital system with fast sampling of down converted signal?  Do we need the higher stability? ESLS-RF 13 (30/9-1/ ), ASTRID2 and its RF system14