UK Costs Beam & Infrastructure Coils Tracking Detector.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
Project manager report paul drumm CM16 October 2006.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Electrical & Control Power Supplies Trevor Hartnett.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
UK status report (funding) Status of UK bid for funding Savings/contributions in kind Gateway process Support from ISIS Conclusions/personal comments.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Refrigeration of Superconducting Solenoids T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
Status of the MICE Construction Project
BDS Cryogenic System RDR Status and EDR Plans
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

UK Costs Beam & Infrastructure Coils Tracking Detector

Historical Cost Summary Vat: 17.5% Inflation 3% pa (from 2002) Contingency 30% on everything 2.3:1 Beam & Infrastructure Tracker detector Focus coils Decay Solenoid Replacement } UK bid

Historical Detail Raw Costs £k

B&I Cost Saving on Solenoid: –Decay Solenoid Replacement –£2M (raw)… in the budget for this  £3.2M –How much do we need to keep? –Solenoid itself - £1M possible £1.5M saving  £2.4M

Cost estimate for B&I £4.5 M  £7.5M capital spend £0.8M Staff cost  £1.1M  £8.6M total – B&I Only –May not have always taken the cheapest option – some trimming to do Cooling plant costs Shielding costs Refine what we need to do for the solenoid £M - figures in blue – raw figures  £M - figures in red include VAT, inflation & Contingency

…exclude PSI decay solenoid New target & decommissioning Beam line power supplies Beam Line Stands Shielding Refrigerator (£1M) etc..... Compressor building Civil work in hall Cooling plant room 500kW Chiller

other UK contributions estimate of the coils: –£1.7M + staff  £2.8M + staff (£0.8M)  estimate of the tracker & software development: –£0.74M + staff  £1.2M + staff (£2.4M)  estimate of the RF contribution: –£0.65M  £1.1M –£0.4M for staff costs (installation)  £0.53M ? Travel etc –£0.9M ~ 6 years  Oversight – RAL project staff ~ 4 years –£1.1M ~ 2.5 SY/pa historical

Summary Total of ~£19.4M; (£15M w/o contingency) –further savings in cost of B&I £? –Savings on Tracker £? –Savings on Coils £? –In kind contribution for RF system £? –Scrutinise travel costs £? –Separation out of running costs £? –these “£?” Need to be quantified! –We have started to review our costs…. 14 th October MICE Project Board