1 Status on Rod Production and Single Rod Tests at FNAL Ryan J. Hooper.

Slides:



Advertisements
Similar presentations
SOME OF THE MOST COMMON TESTING MISTAKES MADE BY TECHNICIANS PERFORMING VERIFICATIONS TO CAN/ULC The reason I know some of them is because I have.
Advertisements

38GXC(Q)/40GXC(Q) Service Training Sizes 18 and 24K.
14 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
The Great I2C Mystery Act 2. The facts Occasionally, when accessing sequentially components on the I2C bus (LLD, DCU etc.), the APVs are found not to.
The Great I2C Mystery Act 2. The facts Occasionally, when accessing sequentially components on the I2C bus (LLD, DCU etc.), the APVs are found not to.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
The Great I2C Mystery. The mystery Occasionally, when accessing the I2C bus, the APVs are found not to respond correctly to I2C commands, actually they.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
I2C Signal propagation on TOB cards Where do we stand A. Marchioro 13/7/2003 v.2.
6/23/2005 Claudio Campagnari, weekly US rod meeting 1 New Development: Tentative Plan for Rod Production As relayed to me by Joe, following the discussion.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
M&O Review, FNAL, July 22, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker I&C and M&O planning Joe Incandela University of California.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
2006 Pontiac G6 - No Generic Communication
What happens when we die?. #PrayForMuamba “So you might be getting older but you still have a dark mysterious gentleman chasing after you"
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Assigning a Drive Letter to a Flash Drive. Right Click My Computer Click Manage Computer Management Dialog Box Opens Under Storage Click Disk Management.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Step By Step Guide for Application. 1. Click the “Register” button ① Ⅰ. Registration.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Strasbourg status Ring 7 pilot run François Didierjean.
1 PST Heaters – Proposed Segmentation Forward = 2289mm. 6 hoops. 10 heaters Barrel = 1606mm. 4 hoops. 7 heaters.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
By: Sharon Draper. Characters Melody Dad, Melody’s dad Mr. Dimming Mrs. V, Melody’s neighbor Penny, Melody’s little sister Rose, Melody’s friend Claire,
OFL2Go Utility to copy OTDR trace files from an OFL250 or OFL280 to a PC, with fiber folders removed. Quick Reference Guide.
QUESTION 1 A technician has installed a maintenance kit on a laser printer and replaced all consumables. Which of the following should the technician.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
BACK SOLUTION:
Tracker Outer Barrel Silicon
Hybrid & Module Testing Status
Unexpected Failures of Modules on Rods
Hardware Needs (Near Term)
FNAL Module Testing Status
First Assembled Rod in US
Engage, Empower & Inspire Your Students
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Module Testing Status Week of 6/14-6/20.
Counter Integrated Circuits (I.C.s)
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

1 Status on Rod Production and Single Rod Tests at FNAL Ryan J. Hooper

2 Rod Production Summary Rod Production Summary Tech + physicist can “jumper” 4 Rods/hourTech + physicist can “jumper” 4 Rods/hour Rods jumpered with “solution 6” 40 Rods populated with modules 36

3 Rod SRT Summary Rod SRT Summary

4 Overview of Issues Overview of Issues Laser Failure (1):Laser Failure (1): Tried a few things but still a mystery at this point!Tried a few things but still a mystery at this point! Reconnected AOHReconnected AOH I2C communication is okI2C communication is ok Speculate broken fibers???, but not obvious by eye!Speculate broken fibers???, but not obvious by eye!

5 Overview of Issues Overview of Issues Thermistor Issues (4):Thermistor Issues (4): 2 cases of:2 cases of: Yes, 1 disconnected Si thermistorYes, 1 disconnected Si thermistor 1 Seen in ARCS data1 Seen in ARCS data 1 Seen in LT data1 Seen in LT data 1 case of:1 case of: Thermistors okThermistors ok Circuit is broken on ICC cardCircuit is broken on ICC card 1 case of bad reading on my (“Ryan’s”) box1 case of bad reading on my (“Ryan’s”) box Confirmed the T2 LIQ Rod thermistor is reading CConfirmed the T2 LIQ Rod thermistor is reading C MODULE 1 DCU TEMP_Si = 423 Counts = C DCU TEMP_Si: *********PROBLEM!**************** Value > 40C or < 12C: Possible broken thermistor on Module! MODULE 1 DCU TEMP_Si = 4095 Counts = C DCU TEMP_Si: *********PROBLEM!**************** Value > 40C or < 12C: Possible broken thermistor on Module!