1Calice-UK WP1 review 9/9/05D.R. Ward David Ward WP1 covered the completion of the original Calice program as proposed in 2002, i.e. Beam tests (electrons.

Slides:



Advertisements
Similar presentations
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
Advertisements

1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
RPC-DHCAL Event Builder Event Display Jacob Smith UT Arlington Argonne National Laboratory Meister der Weltenchronik (Master of World Chronicles) Genesis.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
2 July 2003Paul Dauncey - DAQ1 Progress on CALICE DAQ Paul Dauncey Imperial College London, UK.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
Calice UK Meeting / 10/11/2004 D.R. Ward1 David Ward University of Cambridge Simulation Reconstruction Preparations for test beam UK software work.
Calice Meeting / DESY/January 2004D.R. Ward1 David Ward University of Cambridge Test beam requirements? Studies of cuts and models Fluka studies Clustering.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Geant4-based Simulation Status and Plans Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi Calorimetry Working Group ALCPG 2004 Winter.
Calice Meeting -- Montreal 10th-12th May 2006 Anne-Marie Magnan -- IC London 1 Simulation for CALICE testbeams  Introduction  Test beam configurations.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
1Calice NIU s/w review March D.R. Ward David Ward Recent Technical Board review included software. Summarise some of the main conclusions… Monte.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Mokka and integration of the geometry AIDA kick-off meeting WP2 session: Common software tools 17 February 2011 – CERN Paulo Mora de Freitas and Gabriel.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
Taikan Suehara, TB meeting, 5 Sep page 1 Si/Sc combined DAQ Taikan Suehara (Kyushu University, Japan)
Nick Brook Current status Future Collaboration Plans Future UK plans.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Calice TB Review, 14-Oct-2005Nigel Watson / Birmingham1 Software Review Calice Technical Board Open Session Comments on status relative to Feb TB.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
CALICE ScECAL software development S. Uozumi Sep-3 rd 2010 Japan-Korea joint workshop.
LCIO A persistency framework and data model for the linear collider CHEP 04, Interlaken Core Software, Wednesday Frank Gaede, DESY -IT-
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
Mokka, main guidelines and future P. Mora de Freitas Laboratoire Leprince-Ringuet Ecole polytechnique - France Linear collider Workshop 2004, Paris.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
9 Sep 2008Paul Dauncey1 Tracking software status Paul Dauncey.
Analysis Model Zhengyun You University of California Irvine Mu2e Computing Review March 5-6, 2015 Mu2e-doc-5227.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
11 Sep 2007Tracking - Paul Dauncey1 Tracking Code Paul Dauncey, Imperial College London.
Marcel Stanitzki Rutherford Appleton Laboratory
Final CALICE OsC meeting: Status and summary of project
GEANT4 for Future Linear Colliders
Geant4-based Simulation Status and Plans
ECAL Integration / CALICE DAQ task force
CALICE News The 2007 beam tests have started!
Technical Board – DCAL Software
E. Garutti - Main Meeting
CALICE: Major Items Since September
Kanga Tim Adye Rutherford Appleton Laboratory Computing Plenary
ATLAS DC2 & Continuous production
Proposal Organisation
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

1Calice-UK WP1 review 9/9/05D.R. Ward David Ward WP1 covered the completion of the original Calice program as proposed in 2002, i.e. Beam tests (electrons and hadrons) of 30-layer ECAL prototype accompanied by AHCAL and one or more DHCAL prototypes. Interpretation of data and comparisons with MC models such as Geant4. Feed back results into more reliable studies of energy flow. Electronics/DAQ aspects largely covered by Paul’s talk. WP1 Review

2Calice-UK WP1 review 9/9/05D.R. Ward Schedule In our proposal in January we envisaged the following: Complete ECAL prototype at DESY April Electron beam tests at DESY until June/July Combined ECAL/AHCAL hadron beam tests at Fermilab starting Autumn 2005; running into Combined ECAL/DHCAL beam tests some time in “Limited activity continuing well into New RAs starting ~April Travel money in FY05/06 and (especially) FY06/07.

3Calice-UK WP1 review 9/9/05D.R. Ward Schedule Since January, everything has (rapidly) slipped. ECAL prototype run (with 14 layers, each of 6 wafers) in Jan/Feb ’05 was highly successful, but production difficulties with Si wafers have delayed completion. Now don’t expect completion till end of 2005 (full depth; hopefully full width). Cosmic, followed by electron beam tests at DESY, early Then CERN performance run from ~Jun-Oct AHCAL will now not be ready before March AHCAL commisioning and tests at CERN summer 2006 (μ/hadron beams). TCMT tests at DESY autumn Move to FNAL MTBF autumn 2006, full ECAL/AHCAL/TCMT tests in 2007.

4Calice-UK WP1 review 9/9/05D.R. Ward Schedule But also (and perhaps fortunately), the Calice-UK schedule has slipped. Took ~6 months to get proposal through PPARC. Program stretched to four years rather than three (probably fortunate in some ways). Apart from George, newly approved RA’s have not yet started. Effort for WP1 will be needed later than previously planned. Need to envisage running shifts, supporting DAQ, analysing data through 2007 and into Need to maintain expertise + availability of experts. Start other R&D work sooner, since test beam will be later.

5Calice-UK WP1 review 9/9/05D.R. Ward Data processing Some controversy last winter. TB came up with some recommendations: Data analysis framework: Data analysis framework: lightweight “intelligent” decoding of the raw data into LCIO objects. Recommend the use of MARLIN as the analysis framework. Database: Database: The use of the LCCD package to access a MySQL database in the LCIO/MARLIN framework was recommended. Data storage: Data storage: The data (native, raw LCIO and processed LCIO) will be stored in the dCache mass storage at DESY. Access to these data (preferably) via Grid-ftp). Code sharing: Code sharing: Authors of code are strongly encouraged to store their work at the CVS repository recently established at DESY- Zeuthen.

6Calice-UK WP1 review 9/9/05D.R. Ward Dataflow (agreed 16 Feb) Mokka LCIO Calibration, Alignment Raw Data LCIO (for analysis) LCIO Raw hits (transient) Decoding Anti-Calibration digitization SimCalHits Filtering Raw LCIO (blocks of integers?) Mapping Database True energy (SimCalHits)

7Calice-UK WP1 review 9/9/05D.R. Ward LCIO Generator geometry Analysis Recon- struction Simulation Java, C++, Fortran Geant3, Geant4 Java, C++, Fortran LCIO Persistency Framework

8Calice-UK WP1 review 9/9/05D.R. Ward LCIO data model Additional LCIO objects available for storing other types of data: IntVec FloatVec LCGenericObject

9Calice-UK WP1 review 9/9/05D.R. Ward main Module0Module1Module2ModuleN LCEvent collection0 … read and add collections Outputmodule MyInput2.slcioMyInput1.slcio MyInput0.slcio MyInput.slcio MARLIN – modules and LCIO

10Calice-UK WP1 review 9/9/05D.R. Ward Data processing - status “Core group” has been discussing this: Pöschl, Dauncey, Gaycken, Mavromanolakis, DRW First “complete” version (01-03) of code announced end August. Consists of four parts: Userlib – classes + library needed to read the converted raw LCIO file in a Marlin job (for example). Calice_reco – the actual conversion code. Calice_online – the DAQ classes which define the records output by the DAQ Calice_cddata – utilities connected with conditions data and the database.

11Calice-UK WP1 review 9/9/05D.R. Ward Data processing - status Conversion started last week – about 20 runs done. (Takes about 15 min per run on a typical modern cpu.) Some conditions data (trigger configuration etc) extracted to database. (This has been the biggest holdup). The rest output to event stream. Data size reduced by ~30% Data reside in DESY dCache. To access need Grid certificate and need to belong to the calice VO. Should we maintain a UK copy at RAL? If so who will maintain it? Need database to access trigger configuration data. If connected to network, can read from DESY so long as your site is on their list of trusted sites (IC and Camb. so far). Otherwise, can create local copy on laptop (need MySQL server etc) or can create an LCIO snapshot for relevant period.

12Calice-UK WP1 review 9/9/05D.R. Ward Data analysis - future Progress slower than anticipated, manpower limited, but I think we are approaching a usable system. Have seen today that we can look at the data, make useful comparisons with MC. Lots more to do. Expecting infusion of new personpower in UK – how best to organise ourselves? Issues about UK copies of data etc. Do we need shared MC samples? I suspect not, yet. We’ve been having ocasional, somewhat ad hoc, software/analysis phone meetings (UK- or CALICE- wide). Do people find these useful? How frequent? Should we keep better records of minutes/talks, or is informality better?