MERIT pre-installation review: Preliminary conclusions A.Fabich.

Slides:



Advertisements
Similar presentations
RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Advertisements

LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
GAS SYSTEM STATUS Phase II HELIUM4 GAS SYSTEM STATUS >Status update >Result of TAO Tests >Thermodynamic behavior of the gas >Computational fluid dynamics.
Target System Transportation and Decommissioning P.T. Spampinato V.B. Graves Hg System Safety Review CERN June 19-20, 2006.
MERIT Hg System Design Update V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting Princeton University Nov 17-18, 2005.
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Pre-installation Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Pre-installation.
VRVS, Jan. 2006CERN AB-ATB1 MERIT layout in TT2/TT2A/TT10 CERN AB-ATB VRVS session, Jan
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
Μ-beam Absorber 1Absorber 2Absorber 3RF 1RF 2 Vacuum LH2 Warm window Windows in MICE: Option 1 (as currently designed) ISIS Safety officer’s comment: If.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Ana-Paula Bernardes EN-STI-RBS
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
ESS Cryogenic Distribution System for the Elliptical Linac CM - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden J. Polinski.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
The integration of 420 m detectors into the LHC
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Procedures for detecting vacuum leaks in the LHC LTC open action from /36. LTC Frank Zimmermann, LHCCWG 23 October 2007.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
1 Our goals for today’s meeting  Confirm FNAL role –a complete review of all cryogenics and gas handling –  We would like an above ground review only.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Logo area Cold Mass Design, Assembly Plans & QC by US HL-LHC-AUP Antonios Vouris MQXF International Review – CERN, June 7 th – 10 th, 2016.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Crab Cavity Technical Coordination meeting:
IT-4189 Supply and installation of a cryogenic distribution system
at STFC Daresbury laboratory
MERcury Intense Experiment Experiment Layout
Cryogenic behavior of the cryogenic system
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Leak Detection Tutorial Work
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Module 3 Domestic Heating/MMA Welding
Ana-Paula Bernardes EN-STI-RBS
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
MERIT pre-installation review: Preliminary conclusions
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
PANDA The conceptual design of the control Dewar
MERIT – status and schedule
ISRC and LEBT Vacuum System Design
Cryogenic behavior of the magnet
SC1R Cold Box PDR Assembly Sequence
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

MERIT pre-installation review: Preliminary conclusions A.Fabich

Follow-up: Safety Review of mercury system Draft answer: Hot issues: Item 11: LEXAN cover on sump tank and as lid Latest documentation on used materials and procedures is currently looked at.

Follow-up: Cryogenics and solenoid review Item 2: User’s notice. Yet now written procedures on installation and operation of the solenoid&cryogenics have been provided. – Cryogenics part by AT/ECR Item 5: Results of non-destructive test (x-rays of welds) Item 8: formal answer by collaboration is required.

Pre-installation review Installation in TT2A during PS2 run with beam possible. Personnel radiation dose plan and access procedures need to be written. The use of PU foam is currently investigated. Safety valves of cryostat and vacuum jacket. Maximum operating pressure of cryostat limited to 10 bar. Resolves a lot of issues. A lot is dependent on the surface tests at build 180: leak test (warm and cold), condensation.