Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production 11-04 Derek Barge On behalf.

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Electrical Testing at UCSB: Hybrids, Modules, & Rods Anthony Affolder On.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
UCSB Hybrid Bonding & Testing
Hybrid & Module Testing Status
Update of US Testing Status
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
US Module Production Quality
FNAL Module Testing Status
Module Production Status in Florence
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
US Hybrid/Module/Rod Testing Model
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
Module Testing in Florence Carlo Civinini INFN-Florence
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Status of 44 ARCS tested TOB modules, June 24, 2004
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf of the UCSB testing group

Slide 2Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Purpose To show a testing rate of 30 modules per day can be comfortably sustained at UCSB To identify potential problems & bottlenecks: à ARCS Software (requests for Aachen) à ARCS Software configuration à Mechanics & Logistics à Test Checklists & data management à Test automated uploading to TrackerDB à Crowding in the Lab

Slide 3Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Testing Rates 30 Modules Tested à 15 OB2, 9 OB1, 6 Stereo OB2 à Simulated worst case scenario: –Artificially high fault rate –Mixed module types (OB1 & OB2) Tests & Rates à A Total of 36 tests were performed (4 repairs, 1 unbiased, 1 with wrong cuts) à Testing complete in 8 hours, 13 man hours à 2.75 tests per man hour à 4.5 tests per hour !!! à 3.75 modules finished per hour, 2.3 per man hour à Average test takes 26 minutes

Slide 4Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Testing Results Grading: à 28 Grade A à 0 Grade B à 2 Grade C (both failed) 26/30 Modules processed (passed or failed) on first test à 24/26 passed à 2/26 failed –1 CMN –1 with 11 opens due to problems bonding & 3 noisy channels 4/30 Modules needed repairs à 6063: 2 expected pinholes, 1 unexpected open à 6075: 1 pinhole, 1 expected short, 1 unexpected short, 2 expected noisy à 6077: 3 expected pinholes, 1 unexpected pinhole, 1 unexpected open, 2 noisy à 6079: 2 expected pinholes

Slide 5Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Problems Encountered Mechanics & Logistics à Solder broke on adapter card, took ~ 20 min to fix à DB relay down for 15 minutes, switched relay à Flying wires need to be taped down to avoid damage Software & Data à Minor software improvements from Aachen –Should gain ~ 1 min per test and reduced bad test rate à False flag rate –1 test in 1 mode falsely flagged good channel as a likely 1SO à Incomplete bonding data –Some unexpected opens were encountered, channels that could not be bonded were not entered in the DB. This was fixed immediately.

Slide 6Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Success Stories Data Management à New version of Module Checklist worked well –3 minor bugs discovered, mostly aesthetic –More automation than previous version; only bad channels need to be entered à Automatic uploading of module data via XML is implemented –Half of the XML files uploaded successfully on first try –Other half failed due to incorrect tool id for one stand, fixed and uploaded fine Crowding in the Clean room à Clean room was not overcrowded à Good communication between testing stations

Slide 7Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Conclusions 30 modules per day is sustainable à Could potentially test 36 PERFECT modules in a day à Otherwise testing rate depends on rate of modules needing repair –Simulated repair rate of 4/30 in this excercise =.13 –ST qualification repair rate was ~ 1/10 =.1 –HPK: about 1/30 modules have an expected fault, unexpected fault rate expected to be even lower for HPK à Performace should improve with HPK silicon