NGAO Performance Flowdowns R. Dekany 02 September 2009.

Slides:



Advertisements
Similar presentations
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
Advertisements

NGAO Calibration/Simulation Source T. Stalcup, M. Pollard.
NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
National Research Council Canada Conseil national de recherches Canada Observing Efficiency and Reliability of Gemini South MCAO Glen Herriot Herzberg.
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
NGAO Wavefront sensors: conceptual design report WBS V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #12) Dec. 13 th, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Software Architecture in Practice RiSE’s Seminars Bass’s book :: Chapters 07 Eduardo Santana de Almeida.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
29 September 2004PRIMA AOS CDR1 Welcome Eric Bakker Who is and will attend Objectives Agenda Specific tasks: –List of questions –Risk factors –Follow up.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
Introduction to Database Systems 1 The Storage Hierarchy and Magnetic Disks Storage Technology: Topic 1.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Life After Landfill – regulatory requirements Kate Hamer and Thomas Gallasch Waste to Resources, Regulation and Compliance EPA 27 th September 2007.
Update on Surface Characterization in the GPM Combined Algorithm Joe Munchak With help from Bob Meneghini, Mircea Grecu, and Bill Olson.
Dynamics and predictability of the rapid intensification of Hurricane Edouard (2014) Erin Munsell Summer 2015 Group Meeting August 17 th, 2015.
Science Methods & Approach Life in the Atacama 2004 Science & Technology Workshop Nathalie A. Cabrol NASA Ames.
Science Priorities and Implications of Potential Cost Savings Ideas
Revision reflects an evolution, not a revolution
Chapter 18 Maintaining Information Systems
Intra-pixel Sensitivity Testing Preliminary Design Review
XRT Performance Update
Chapter 9 – Software Evolution and Maintenance
NICMOS Science NICMOS Ultra-Deep Field data products released
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Chapter 8 Software Evolution.
Trade Study Report: Fixed vs. Variable LGS Asterism
NGAO topical discussion: Observing Efficiency and Uptime Budgets
Presentation transcript:

NGAO Performance Flowdowns R. Dekany 02 September 2009

Performance Budget Flowdown Process Translates high-level performance requirements into subsystems requirements – Based upon B2C architecture choices – Is iterative Version 1 release this month – Version controlled flowdown summary (spreadsheet) – Updated Contour Requirements database – Will influence on-going design work Version 2 release in February 2010 – Will document system change orders subsequent to Version 1 release – Will document the flowdown for the PDR

Flowdown Products Version 1 (Sept 2009) – Transmission & Emissivity AO system, Fixed and PnS BTO – LGS beacon Spot Size – Pupil Registration Framework – Go-to Errors – Non-sidereal and Long-exposure Tracking Errors – Initial Efficiency Budgets Acquisition timeline – Rel Astrometry Flowdown – High-Contrast Flowdown

Flowdown Products (cont.) Version 2 (Feb 2010) – TWFS budget – Optical Surface Figure Quality – Pupil Registration Tolerances – Update to HO and TT bandwidth latency to reflect servo design – Revisions to Rel Astrometry Flowdown – Observing Efficiency Flowdown for Non-Sidereal Long Exposures – System Uptime MTBF Framework

Specific Issues Ref: NGAO_PD_Phase_Flowdown_Reconciliation_v0.6.doc

Reconciliation issues Surface Optical Transmission – Need uniform coating and dust losses System Emissivity – Update to enclosure temperature? Servo Bandwidth Error – Need consistent servo model – HC budget vs. WFE budget driver?

Reconciliation issues (cont.) Calibration issues – Stale reconstructor errors – Dynamic zero-point calibration errors – Quasi-static WFE driving HC error budget HC budget – Impact of HOWFS aliasing?

Conclusions Initial performance flowdown has identified several consistency and design issues After capture into Contour database, further refinement will be rolled out via system change process