Budget Briefing with OHEP Staff: March 3, 2009 Page 1 SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Rev.

Slides:



Advertisements
Similar presentations
NSF Experience with Management of Research Infrastructure
Advertisements

Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
PPA Budget Roll-Out Meeting October 22, 2008 Page 1 FY2009 Budget Roll-Out Steve Kahn PPA Director.
TeV Particle Astrophysics 2009 Welcome & SLAC Connections David MacFarlane Associate Laboratory Director for PPA.
June 12, 2007DOE Program Review1 Emergency Information Be aware of exits in your building Be aware of exits in your building –Speaker will indicate locations.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Strategy for Moving Forward in PPA Page 1 Strategy for Moving Forward in Particle Physics and Astrophysics at SLAC Steven M. Kahn Associate Laboratory.
Interdisciplinary and Interagency Cooperation in High Energy Physics Barry Barish BPA 5-Nov-02.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
July 23, 2008PPA All-HandsPage 1 PPA All-Hands: Debrief from the SLAC Program Review Steven M. Kahn Associate Laboratory Director and Director of Particle.
Performance Evaluations: PPA InterpretationsPage 1 Interpretations on Performance Evaluation Process D. MacFarlane June 4 th, 2009.
Apr 16, 2009PPA Department Heads MtngPage 1 Department Heads Meeting Steve Kahn & David MacFarlane April 16, 2009.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
3/6/2006FY07/08 DOE Budget Briefing1 FY07/08 Budget Briefing Jonathan Dorfan Director Persis Drell Deputy Director SLAC.
Office of High Energy Physics View on Dark Energy Collaborations Kathleen Turner Office of High Energy Physics (HEP) Office of Science (SC), U.S. Department.
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
Long Range Planning Pier Oddone September 24, 2007.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
SLUO LHC Workshop: Closing RemarksPage 1 SLUO LHC Workshop: Closing Remarks David MacFarlane Associate Laboratory Directory for PPA.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
DOE Annual Review of SLAC HEP Research Program June 14-16, 2005 SLAC Charge to Committee Issues Procedures.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
P5 Meeting - Jan , US LHC The Role of the LHC in US HEP Dan Green US CMS Program Manager January 28, 2003.
1 FY09 PPA Budget Kick Off Rafael Alva Charlotte Chang Oct 22, 2008.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
1 LSST Town Hall 227 th meeting of the AAS 1/7/2016 Pat Eliason, LSSTC Executive Office Pat Osmer, LSSTC Senior Advisor.
Budget Outlook Glen Crawford P5 Meeting Sep
Argonne Accelerator Institute Activites Rod Gerig Argonne May 18, 2007 Presentation to the Fermilab-Argonne Directors’ Collaboration Meeting.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
CPAD Instrumentation Frontier Meeting October 5-7, 2015 Glen Crawford, Helmut Marsiske Office of Science, U.S. Department of Energy DOE Office of High.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Yet Another Report from DOE Office of High Energy Physics
SLAC PPA Budget Discussion: FY09 Allocations Among BNR Codes
Andrei Seryi Materials for discussion TILC-08
Preliminary Project Execution Plan
Presentation transcript:

Budget Briefing with OHEP Staff: March 3, 2009 Page 1 SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Rev 5 – Preliminary

Budget Briefing with OHEP Staff: March 3, 2009 Page 2 Outline of Presentation *Statement of SLAC PPA Vision and Near-Term Priorities for Operating Programs, and New Projects. –Addresses Laboratory role, strengths and strategic goals and program objectives. *Scenario A, (B, C) –B&R Reallocation Summary Sheet –High Level Summary – Detailed year-by-year breakouts –Summary Budget Spreadsheet *Backup Material on Individual Programs –ATLAS, EXO-200 and EXO, LSST, JDEM, SuperB, Theory, Accelerator Development, ILC SRF, PEP-II D&D, Detector R&D Test Beam.

Budget Briefing with OHEP Staff: March 3, 2009 Page 3 SLAC Vision for Particle Physics and Astrophysics *Maintain a leading role at the Energy Frontier through enhanced participation in ATLAS, the current LHC machine, and their planned upgrades, and through leadership of R&D for the ILC and associated detector concepts. *Become the lead laboratory within the DOE-SC complex for particle astrophysics and cosmology, and for non-accelerator physics generally. (KIPAC, FGST, LSST, JDEM, EXO, GeODM, AGIS, CMB). *Maintain strong partnerships at the Intensity Frontier through facilitating US participation in an international SuperB Project, and through supporting the design and development of the Project X facility. *Become the lead laboratory within the DOE-SC complex for electron accelerator research. Play a stewardship role for accelerator physics across disciplines within the Office of Science. Develop key innovations and technologies for future high-gradient accelerators.

Budget Briefing with OHEP Staff: March 3, 2009 Page 4 SLAC Near-Term Priorities for Particle Physics and Astrophysics: Operating Programs *Continue to facilitate the optimal exploitation and preservation of the BaBar dataset. –Support necessary computing infrastructure through the completion of the intense and steady analysis phases –Facilitate transition into the archival phase, and ensure that the BaBar data remain accessible to a broad community. *Operate the LAT for FGST, and continue to spearhead scientific discovery with this unique particle astrophysics observatory. –Support the operations, software development, and instrument support functions of the LAT, as performed by the ISOC. –Maintain a vigorous LAT-based scientific analysis program at SLAC. *Play a significant role in ATLAS and LHC accelerator commissioning, initial science analyses, and computing support. *Maintain world-leading accelerator-science program –World-leading programs in beam physics theory, advanced computation, and accelerator design.

Budget Briefing with OHEP Staff: March 3, 2009 Page 5 SLAC Near-Term Priorities for Particle Physics and Astrophysics: Operating Programs *Maintain a crucial, enabling role in technology development for the ILC. –L-band rf. –Electron source. –Final focus and IR design. *Lead high-gradient X-band research in the US. –Establish the fundamental limits to acceleration gradient and the optimal design of rf structures. *Maintain world-leading theoretical programs in particle physics and particle astrophysics and cosmology. *Plan and execute the orderly D&D of the BaBar detector and the PEP-II facility.

Budget Briefing with OHEP Staff: March 3, 2009 Page 6 SLAC Near-Term Priorities for Particle Physics and Astrophysics: New Programs *Bring LSST into development as a joint NSF-DOE project. –Lead the design and development of the LSST camera. –Participate in the data management, with particular emphasis on new tools for handling and querying the extremely large database. –Shepherd the involvement of the HEP community in this exciting dark energy experiment. *Play a major role in the upgrade of the ATLAS detector and the LHC –ATLAS Phase 1: Insertable B-layer project. –ATLAS Phase 2: Tracker and TDAQ upgrades. –Enhancement of ATLAS computing at SLAC. –Extend LHC contributions to include fabrication of upgrade collimators, development of PS2 design, and LLRF and feedback improvements. *Construct and operate FACET for forefront experiments in beam-driven plasma wakefield acceleration. *Participate in JDEM construction, development, and science analyses. –Provision of warm electronics for one or more of the focal plane instruments. –Possible role in fine guiding. –Participation in weak lensing and strong lensing science investigations.

Budget Briefing with OHEP Staff: March 3, 2009 Page 7 SLAC Near-Term Priorities for Particle Physics and Astrophysics: New Programs *Develop and construct a ton-scale version of EXO for the initial suite of mid-scale experiments at DUSEL. –Complete operation and testing of EXO-200. –Perform the necessary R&D and engineering for full-EXO. *Facilitate a significant US role in SuperB in Italy. –Provide components from PEP-II to reduce the cost of SuperB construction. –Play a leadership role in the machine design and construction. –Develop and coordinate participation in the SuperB detector collaboration. *Participate in Project-X R&D with contributions to rf power systems. *Perform state of the art experiments in laser dielectric acceleration. *Develop high power X-band rf sources to optimally exploit high gradient structures. *Initiate and maintain R&D efforts to a enable a SLAC leadership role in longer-range programs: –SiD, GeODM, and AGIS

Budget Briefing with OHEP Staff: March 3, 2009 Page 8 SLAC HEP Budget Meeting Update Modified Scenarios B and C S. M. Kahn, D. B. MacFarlane, R. Alva SLAC

Budget Briefing with OHEP Staff: March 3, 2009 Page 9 Budget Briefing with OHEP Staff: March 3, 2009 Page 9 Modified Scenario B *High Level Impacts –Maintains present core research staffing levels with no need for reductions through attrition. –BABAR D&D as planned; PEP-II D&D delayed until –LSST ramp-up, assume $1.5 M (FY10) and $3M (FY12) of PED funding. –EXO concept only developed at the 200 kg level. –Reduced electron research program due to BABAR falloff; reduced SuperB involvement, & small ongoing ILC detector R&D studies. –Continue growth of ATLAS, leading to SLAC role on ATLAS Phase 1 IBL and TDAQ ATLAS upgrades with BNL as lead; continue effort on LHC accelerator commissioning and upgrades. –Accelerator science program as planned. –Develop test beam and X-band rf source proposals for future funding consideration. –Project X & JDEM warm electronics role commensurate with additional funding from lead labs and/or other agencies

Budget Briefing with OHEP Staff: March 3, 2009 Page 10 Budget Briefing with OHEP Staff: March 3, 2009 Page 10 Modified Scenario B *Strategic Priorities: What scientific objectives and targets are being addressed? –Maintain leadership in current electron accelerator physics, but future direction in doubt without clear path for SuperB and ILC physics programs. –Establish SLAC as the lead laboratory in particle astrophysics and cosmology for DOE-SC, although prospects for development of future underground program unclear. –Continue leadership role at the Energy Frontier through an enhanced role in ATLAS and ongoing development of the ILC. –Play a stewardship role for accelerator physics across disciplines within the Office of Science. Develop key innovations and technologies for future high-gradient accelerators. *What major accomplishments have been or will be achieved? –BABAR Intensive and Steady analysis supported. –FGST support and science exploitation. –LSST executed as a major DOE contribution to the project. –Enhanced ATLAS role enabled, including upgrade contribution. –FACET implementation and development of acc science novel concepts. *Significant issues and concerns –No provision for full EXO as part of initial suite of DUSEL experiments. –No provision for US contribution to SuperB if project proceeds on projected timescale. –No provision for industrialization of SC RF 1.3 GHz sources

Budget Briefing with OHEP Staff: March 3, 2009 Page 11 Budget Briefing with OHEP Staff: March 3, 2009 Page 11 Modified Scenario B *High level impacts –No further attrition in core staff. ATLAS growth continues, electron reduced and reduced Super B involvement; some attrition in Theory. *Priorities: What scientific objectives and targets are being addressed? –As previously noted. *What accomplishments have been or will be achieved? –In addition to previously noted, LSST CD-1, R&D for full EXO and SuperB concept development. –FACET starts construction and acc science ramps-up according to plan. –JDEM warm electronics and Project X role commensurate with external funding. *Significant issues and concerns –Accelerated FACET construction funded from stimulus package will be challenging. 2009

Budget Briefing with OHEP Staff: March 3, 2009 Page 12 Budget Briefing with OHEP Staff: March 3, 2009 Page 12 Modified Scenario B *High level impacts –Reduction of 4 FTEs in B Factory Ops; BABAR D&D continues as planned, but not yet able to start of PEP-II D&D –Project line: LSST ramp-up assumes ~$1.5 M of PED funding in 2010, with FACET construction ending. –PED funding for ATLAS phase 1 upgrade with BNL as lead. *Priorities: What scientific objectives and targets are being addressed? –As previously noted. *What accomplishments have been or will be achieved? –BABAR Intensive analysis winds down and transitions to Steady analysis. –ATLAS IBL design effort achieves CD-1. –LSST proceeds to CD-2. –Finish FACET construction, ramp-up PWFA and laser accelerator science as planned. –JDEM warm electronics and Project X role commensurate with external funding. *Significant issues and concerns –Some competition for people and resources among construction projects. 2010

Budget Briefing with OHEP Staff: March 3, 2009 Page 13 Budget Briefing with OHEP Staff: March 3, 2009 Page 13 Modified Scenario B *High level impacts –Another 4 FTE reduction in B Factory Ops; BABAR D&D and PEP-II maintenance at ~$6.5M, but resources are insufficient to start PEP-II D&D until –Project line increases by ~$7M due to: LSST ramp-up (assuming $3M of PED funding for FY2011), the first full l year of FACET operations, and an additional $1M investment to replace aging KIPAC computing equipment. –Construction funding for ATLAS phase 1 upgrade with BNL as lead. –Continue planned Accelerator Science growth. *Priorities: What scientific objectives and targets are being addressed? –As previously noted. –Moving ATLAS phase 1 upgrade and LSST projects through CD reviews into the construction phase. *What accomplishments have been or will be achieved? –As previously noted. –BABAR Steady analysis ongoing. *Significant issues and concerns –Phasing of new initiative development schedules. 2011

Budget Briefing with OHEP Staff: March 3, 2009 Page 14 Budget Briefing with OHEP Staff: March 3, 2009 Page 14 SLAC Modified Scenario B detail

Budget Briefing with OHEP Staff: March 3, 2009 Page 15 Modified Scenario C *High Level Impacts –Expands Scenario B to include full-scale EXO and significant US role in SuperB. Begin full EXO in FY2013, as part of the initial suite of experiments at DUSEL, with PED in FY , construction start in FY2013 and SLAC as lead. Begin SuperB as a new construction project starting in FY2012, with PED in 2011, assuming investment in detector and accelerator by US community with SLAC as lead. –Exploit core data management capability developed for BABAR to enable enhanced ATLAS Analysis Facility. –Assume funding to construct test beam for detector R&D program (2009 and 2010), –Assume successful competition for accelerator development funding X-band rf sources, $9M over 5 years to develop viable rf source. TT60 High Radiation Test Facility, $1M to provide beam dump and window by end of CY

Budget Briefing with OHEP Staff: March 3, 2009 Page 16 Modified Scenario C *Strategic Priorities: What Scientific objectives and targets are being addressed? –A program at this level is commensurate with the full vision we articulated for PPA at SLAC. *What Major accomplishments have been or will be achieved? –Enhanced ATLAS role enabled, including major upgrade contribution. –BABAR Intensive and Steady State analysis supported; D&D completed in a timely way. –SLAC and US community provide crucial leadership for SuperB project in Italy, with BABAR and PEP-II components and major new hardware contributions. –FGST support and science exploitation. –LSST executed as a major DOE contribution to the project. –FACET implementation and development of Acc Science novel concepts. –Full EXO developed as a major component of the initial program at DUSEL. *Significant issues and concerns: –Phasing of various construction remains a significant challenge

Budget Briefing with OHEP Staff: March 3, 2009 Page 17 Modified Scenario C *High level impacts –Expand the scope of FACET to include the double sail boat configuration. –Initial $0.75M funding for test beam facility based on proposal *Priorities: What scientific objectives and targets are being addressed? –Continue development of full EXO and SuperB for consideration in later years. *What accomplishments have been or will be achieved? –FACET construction accelerated. –Test beam design completed and construction started. *Significant i ssues and concerns –FACET cost estimates yet to be baselined and confirmed Scenario B +

Budget Briefing with OHEP Staff: March 3, 2009 Page 18 Modified Scenario C *High level impacts –Remaining $0.75M funding for test beam facility based on proposal *Priorities: What scientific objectives and targets are being addressed? –Moving full EXO R&D forward and continuing to develop US role on SuperB. *What accomplishments have been or will be achieved? –Complete test beam and begin operations. –Begin new accelerator development projects. *Significant issues and concerns –Potential competition for resources as multiple construction projects ramp-up Scenario B +

Budget Briefing with OHEP Staff: March 3, 2009 Page 19 Modified Scenario C *High level impacts –PED funding for full EXO ~$1.9M for 2011 assuming construction starts in FY13. –PED funding for SuperB $2.4M for the detector and $3.3M for the collider, assuming construction starts in FY12. –Strengthen data analysis capability with the ATLAS Analysis facility: $1.5M for equipment and $1.2M operational support, ramping to 7 FTEs in –Additional $1M (non-core) for general accelerator development. *Priorities: What scientific objectives and targets are being addressed? –Moving full EXO and SuperB from development into construction. *What accomplishments have been or will be achieved? –EXO and SuperB proceed to CD-1. –Begin development of ATLAS Analysis Facility. –Continue accelerator development projects. *Significant issues and concerns –Aggressive program for current workforce Scenario B +

Budget Briefing with OHEP Staff: March 3, 2009 Page 20 SLAC Modified Scenario C

Budget Briefing with OHEP Staff: March 3, 2009 Page 21 Budget Briefing with OHEP Staff: March 3, 2009 Page 21 What is next with the budget *As previously mentioned, with the exception of FACET the 2009 and 2010 budgets are very consistent with current level of spending. Thus what you should expect is : –Minor or no changes to your budget. –But there will be some major re-bucketing in the “DOE - HEP B&R codes”, that may mean new charge numbers for your group. –Potentially more granularity in our tracking by project, particularly in KIPAC. –Please support these changes working with your Financial Planner. *Mid Year Check-Point –We have already started our Mid year checkpoint, during this and next month. One of the Financial Planners will be meeting with you to review your budget and current level of spending –This is a good time to correct spending trends to avoid overspending, but also to ensure that the right people and services get charged to the correct accounts. Your financial planner will be working with you. *Specifically if you are new to owning a budget. –There is an overview training that should answer most of your questions, about finance and budget management. You are encouraged to attend. –The training will be held at Kavli 3rd Floor Conference Room, next Wednesday (3/25) from 10:00-11:30 am. –You can sign-in via SLAC web.