5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,

Slides:



Advertisements
Similar presentations
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
Advertisements

15-Apr-15 Muon HLT Meeting C. Diez L2 Muon Trigger Status Report: L2 seeding study B. de la Cruz, C. Diez (CIEMAT, Madrid) Muon HLT Meeting 17th April,
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Yasmine Amhis EPFL Yasmine Amhis EPFL Status of the LHC and LHCb Adrenaline.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Approved Plots from CMS First Beam Runs 2-October-2008.
Abbreviated list of April Global Run (AGR) achievements All: clock frequency scan ECAL/RCT/L1: test (28 of 500) new oSLB  oRM links Strips: run with all.
Toward Assessing HF with Beam Halo Muons & Beam-Gas Events …tuning HF when beam returns excerpts from US-CMS presentation 9/26/08 Michael Schmitt, NWU.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Status of Muon Trigger Efficiency Measurement for ICHEP Benedikt Hegner, Benjamin Klein, Yvonne Küssel, Patricia Lobelle, Markus Marienfeld, Rahmat Rahmat,
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Study of L1 and HLT efficiency in VBTF Monika Jindal (Panjab University, Chandigarh) Jasbir Singh (panjab University, Chandigarh), Kajari Mazumdar (TIFR,
Low p T Muon trigger studies for J/       Supreet Pal Singh (Panjab University, Chandigarh) Prof. J.B.Singh (Panjab University, Chandigarh) Prof.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY,
Cosmic Ray Run III Cosmic Ray AliEn Catalogue LHC08b 1.
PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
HF Calibration coefficients (from Data and DB) Status Report Murat Ali Guler, Kadir Ocalan (METU)‏ Ferhat Ozok, Kerem Cankocak (Iowa)‏ HF meeting 29 July.
A. Meneguzzo Padova University & INFN Validation and Performance of the CMS Barrel Muon Drift Chambers with Cosmic Rays A. Meneguzzo Padova University.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Precision Drift Chambers for the ATLAS Muon Spectrometer
First CMS Results with LHC Beam
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Track Selection Performance of the CMS Cathode Strip Chamber Track Finder and Level 1 Trigger Kristin Beck Advisors: Dan Holmes, Darin Acosta 14 August,
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
CERN-Korea Committee 1 CMS report. CMS publications 2 Pub rate steady, ~2.5/week 391 papers submitted: +23 CRAFT based +25 ready for CWR or later +6 PubDraft.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Preliminary results on DT T0s in beam collisions J. Santaolalla, J. Alcaraz (+ help/suggestions from C. Battilana, C. Fouz)
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
L1 Global Muon Trigger Simulation Status URL of this presentation:
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
1 Plans for the Muon Trigger CSC Note. 2 Muon Trigger CSC Studies General performance studies and trigger rate evalution for the full slice Evaluation.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
LHCb 2009-Q4 report Q4 report LHCb 2009-Q4 report, PhC2 Activities in 2009-Q4 m Core Software o Stable versions of Gaudi and LCG-AA m Applications.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Some introduction Cosmics events can produce energetic jets and missing energy. They need to be discriminated from collision events with true MET and jets.
Muon Alignment: Organization
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
CMS status A walk through the performance of CMS at LHC
SLB Synchronization in H4 Beam (LIP - Lisbon)
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Quarkonium production, offline monitoring, alignment & calibration
Global Trigger Finds Correct BX
RPC approved plots.
Plans for the 2004 CSC Beam Test
Global Muon Trigger Update
Presentation transcript:

5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times, at least at current beam intensities u Beam halo rates are small (both and  ) u CSC trigger timing seems okay, but statistics are very low n Main concerns u Plumbing: even if YE+-1 are fixed, a leak in YE2 will kill most of our trigger capability (knocks out both ME2 and ME3)  CSC |  |>1.6 and beam halo event streaming needs our attention l Did we lose beam halo events? Quality cuts that depend on non-existent (TDR) RPC chambers at high  e.g. HLT_l1Mu20HQ u Only some 10’s of CSC collision events, not enough yet to tune: l Time synchronization l DT overlap region trigger l Alignment n Proposed actions u Fix plumbing… u Study CSC muon and beam halo event streaming from L1 through HLT and Tier-0 u Take data, and tune trigger timing and CSC chamber alignment

5-Jan-2010 XEB Meeting at CERN 2 Backup slides

5-Jan-2010 XEB Meeting at CERN 3 Example: min bias vs. beam halo rates n From CSC elog of 13-Dec n Beam halo trigger: u Most of the rate is cosmic rays (0.6 Hz) u Beam halo rate was at most ~0.1 Hz Min bias Beam halo trigger NB 1-hour shift from GMT (plots on right)