Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting.

Slides:



Advertisements
Similar presentations
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
Advertisements

PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
Status of Systems Code Studies J. F. Lyon, ORNL ARIES Meeting June 14, 2005.
ARIES Project Meeting, L. M. Waganer, June 2007 Page 1 Progress On Cost Modeling- Cost Accounts 20 and 21 L. Waganer June 2007 ARIES Project.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Systems Code Cost Algorithm Status and Planned Enhancements L. Waganer/ L. El-Guebaly 3-4 April.
2010 US-Japan Workshop on Fusion Power Plants and Related Advanced Technologies at UCSD CA, US, Feb.23-24, Commissioning scenario including divertor.
ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
ARIES- Pathways, August 26-27, Atlanta, GA Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting August 2009 Georgia.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
Page 1 ARIES Project Meeting, L. M. Waganer, May 2008 Documentation of System Cost Accounts and Algorithms L. Waganer 18 June 2008 Conference Call.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
ARIES-CS Systems Studies J. F. Lyon, ORNL Workshop on Fusion Power Plants UCSD Jan. 24, 2006.
Progress on Engineering and Costing Algorithms for ARIES Systems Code Zoran Dragojlovic, Rene Raffray, Chuck Kessel and Leslie Bromberg ARIES Project Meeting.
Use of Simple Analytic Expression in Tokamak Design Studies John Sheffield, July 29, 2010, ISSE, University of Tennessee, Knoxville Inspiration Needed.
26 Jan Lane Carlson, Charles Kessel Mark Tillack, Farrokh Najmabadi ARIES-Pathways Project Meeting San Diego, CA Jan 26-27, 2011 Needful Systems.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
Recent Results on Compact Stellarator Reactor Optimization J. F. Lyon, ORNL ARIES Meeting Sept. 3, 2003.
Progress on Systems Code J. F. Lyon, ORNL ARIES Meeting Nov. 4, 2004.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Systems Code Refinements and Updated Information J. F. Lyon, ORNL ARIES Meeting Jan. 23, 2006.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
ARIES- Pathways, April , Madison, WI Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting April 2009 University.
An evaluation of fusion energy R&D gaps using Technology Readiness Levels M. S. Tillack and the ARIES Team International High Heat Flux Components Workshop.
ARIES Project Meeting, L. M. Waganer, 6-7 Sept 2007 Page 1 Progress On Cost Modeling- Cost Accounts 22 L. Waganer 6-7 September 2007 ARIES Project Meeting.
1 Lane Carlson 1, Mark Tillack 1, Farrokh Najmabadi 1, Charles Kessel 2 1 University of California, San Diego & 2 Princeton Plasma Physics Lab US/Japan.
Page 1 of 11 Progress developing an evaluation methodology for fusion R&D ARIES Project Meeting March 4, 2008 M. S. Tillack.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
1 Lane Carlson ARIES-Pathways Project Meeting Gaithersburg, MD, July 27-28, 2011 Generalization and Blanket Updates to the ASC.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
Burning Simulation and Life-Cycle Assessment of Fusion Reactors Kozo YAMAZAKI Nagoya University, Nagoya , Japan (with the help of T. Oishi, K.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Progress of ARIES Systems Code Development Zoran Dragojlovic A. René Raffray Farrokh Najmabadi ARIES-“TNS” Project Meeting June 14 and 15, 2007 General.
Page 1 of 9 Power Management Technical Working Group Structure and Goals ARIES Project Meeting June 2007 M. S. Tillack and A. R. Raffray.
Systems Analysis Development for ARIES Next Step C. E. Kessel 1, Z. Dragojlovic 2, and R. Raffrey 2 1 Princeton Plasma Physics Laboratory 2 University.
Assessment of Fusion Development Path: Initial Results of the ARIES “Pathways” Program Farrokh Najmabadi UC San Diego ANS 18 th Topical Meeting on the.
Analysis of Systems Code Results J. F. Lyon, ORNL ARIES Meeting Nov. 17, 2005.
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
Description of Thin Liquid Wall Protection w/Porous Walls
Pilot Plant Study Hutch Neilson Princeton Plasma Physics Laboratory ARIES Project Meeting 19 May 2010.
Improvements to power flow modeling in the ARIES system code
Consultant for ARIES Project/UCSD/DOE
Preparation of activation experiments for ITER material characterization and data validation in the Deuterium–Tritium JET campaign T. Vasilopoulou &
The European Power Plant Conceptual Study Overview
Trade-Off Studies and Engineering Input to System Code
Comments on ARIES-ACT 10/20/2010 Pre-Strawman
Reactor Building Concept Assessment
Experimental equipment Edgar L. Black February 17, 2019
Preliminary Analysis of Loss of Vacuum Events in ARIES-RS
Analysis of Technical and Programmatic Tradeoffs with Systems Code
Presentation transcript:

Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting at UCSD

Page 2 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Results Reported at Dec 07 Meeting Presented new cost account structure that was adopted by team Reported that the ARIES Material Cost Database had been updated to include installed costs for first wall, blanket, shielding, primary structure, vacuum vessel, and cryostat subsystemsMaterial Cost Database Reported that the ARIES Cost Accounts have been documented through accounts shown below: Accounts 20, Land and Land Rights Accounts 21, Structures and Site Facilities Partially Acct 22, Power Core Plant Equipment Acct 22.01, Fusion Energy Capture and Conversion (FWB, shielding ) Acct 22.02, Plasma Confinement (Being developed by Bromberg/Kessel) Acct 22.03, Plasma Formation and Sustainment (in work) Acct 22.04, Vacuum, Power Core (in work) Acct Primary Structure and Support, Power Core (C.Post, B. Cyl, VV, Cryost, etc) Acct – 13 Power Supplies, Main HT&T, Cryo, Rad Matls, Fuel Handl, Maint, I&C, and Other Plant Equipment (yet to be done)

Page 3 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Validating/Updating Costs Difficult 1.Prior ARIES cost documentation is sketchy, at best (reported in ARIES II-IV Sys Studies chapter and one SSPS chapter) 2.Account 22 never documented in entirety Totals reported, but some sub-accounts never shown, eg, cyro cooling, rad waste, fuel handling, maintenance, and I&C, amounting to $103M in ARIES-AT A-II-IV Sys Studies Chapter defined algorithms (92$) for: Aux cooling (1.1x10 -3 x P th ), should be waste heat Radioactive waste treatment(1,96x10 -3 x P th ), should be waste mass Fueling handling and storage(∑ of unit prices, g/d, m 3 /h, constants) ? Other reactor plant equipment(1.78x10 -3 x P th ) TBD Instrumentation and control $38.29 M TBD 3.FWBS and coil accounts used material databases (recommended) 4.Many other accounts used performance parameters to estimate costs (heating/CD, vacuum, primary structure, power supplies, impurity control, main heat transfer and transport), some may be appropriate

Page 4 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Validating/Updating Costs Difficult 1.L. Bromberg and C. Kessel working on coil subsystems 2.TK Mau and I have started working on Heating and CD accounts 3.In prior ARIES estimates, Vacuum Vessel seemed to be lumped with Vacuum System in “Reactor Vacuum Systems (unless integral elsewhere)” Algorithm was 0.024xM vac +4.09x kg/d (of gases pumped?) Ref: M vac for Titan-I Current ASC code computes VV volume and uses Material Table costs (for new Acct ) but no cost computed for Vacuum, Power Core ( New Acct 22.04) In ARIES-AT, Boeing developed a detailed design and provided a detailed Vacuum Vessel cost estimate that did not appear to be used or documented in AT Cost Summary. This is being used as the VV cost basis in the Material database. Unit Costs 2000$ 2008$ Spool Assembly$30/kg$36.90/kg Removable Doors$44/kg$54.12/kg Door Frame$76/kg$93.48/kg Port Enclosure$30/kg$36.90/kg Composite Rate$35/kg$43.05.kg Refer to Update of ARIES-AT Vacuum Vessel Design presentation of June 2000 to confirm design and cost basis

Page 5 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Validating/Updating Costs Difficult 1.Divertor seems to be under “Impurity Control” (= 0.73 x A div ), but not related to materials, design definition, or fabrication approach Current systems code still uses this algorithm, but can adopt the materials algorithm 2.Primary structure should be estimated with material volume 3.Remaining accounts remain to be evaluated.

Page 6 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Historical Data on Some Systems Starfire used its shield as a vacuum vessel, hence no cost reported. ARIES has traditionally not identified the cost of the vessel but loaded it into a general category, which ranged from $73M to $227M (2008$). Boeing estimated AT vessel to be $48M. ITER had its vessel as $390M (first of a kind) and very large. Vacuum equipment not easily separable from ARIES. Starfire had its at $12M. ITER’s vacuum equipment is $44M. Most ARIES divertors are in the $10M-$20M range. ITER’s is $139M With the assumption that the cost of the divertor is similar to the unit cost of the first wall blanket and proportional their respective areas, then RS divertor is 15% of FWB (~$15M) and AT is 34% of FWB (~$31M). Don’t have ITER areas but percentage is 53%.

Page 7 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Comparison of ITER to ARIES-AT These are comparisons of the direct capital equipment costs. ITER is first of a kind and not competitively bid. Also these ITER costs are based on the available data as of Snowmass I had the ARIES structures algorithms but did not have the related parameters to generate individual costs and these were not documented..

Page 8 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Comparison of ITER to ARIES-AT Ratio of ITER to AT , dissimilar matls Big difference All coils in AT, Big ∆ ITER uses TF Coils ITER Sys only ITER Vessel only Big ∆

Page 9 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Comparison of ITER to ARIES-AT These are comparisons of the direct capital equipment costs. ITER is first of a kind and not competitively bid. Also these ITER costs are based on the available data as of Snowmass I believe the ARIES-AT costs are reasonably comparable. ITER Low Temp AT data not avail “ ITER Heat Rejection “ ITER Site El Pwr

Page 10 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Cost Account Managers No. AccountCAM 20Land and Land RightsWaganer 21Structures and Site FacilitiesWaganer 22Power Core Plant Equipment Fusion Energy Capture and Conversion First Wall and BlanketMalang Second BlanketMalang Divertor AssyRaffray High Temperature ShieldingEl-Guebaly Low Temperature ShieldingEl-Guebaly Penetration ShieldingEl-Guebaly Plasma Confinement Toroidal Field CoilsBromberg Poloidal Field CoilsBromberg Feedback CoilsKessel Plasma Formation and SustainmentMau Vacuum, Plasma Core (equipment)Najmabadi Primary Structure and SupportWang Power Supplies, Switching and Energy StorageCadwallader Main Heat Transfer and TransportRaffray Cryogenic Cooling, MagnetsBromberg Radioactive Materials Treatment and ManagementEl-Guebaly Fuel Handling and StorageSteiner Maintenance EquipmentWaganer Instrumentation and ControlWeaver Other Plant EquipmentWaganer 23Turbine Plant EquipmentSchultz 24Electric Plant EquipmentSchultz 25Miscellaneous Plant Equipment Waganer 26Special MaterialsWaganer

Page 11 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Next Actions –yet to be done Continue to work with Subsystem experts to create and verify costing algorithms for each subsystem and major component Determine number of identical subsystems and major components necessary for the selected design (including EPR, subsystem demonstrations, DEMO, initial prototypes, and initial power reactors leading to the 10 th of a kind power plant, including spares Assess the learning curve associated with the subsystem and major components