Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

Daikin Altherma™ Troubling Shooting
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
André Augustinus 16 June 2003 DCS Workshop Safety.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
ESE Lab Computer based Temperature Control Sid Deliwala, ESE Labs.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
SF-3000 Installation Manual. 2 Back of SF CON400) USB connector - User can use USB memory stick after connect USB connector of key PCB. CON500)
“Introduction of the software for the thermal tests” Ioannis Kossyvakis (University of Patras, Greece) Mateusz Sosin (CERN) 19/09/2011.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
Disk testing - status. Disk Test Setup we use similar setup as the one used for sector tests, only simplified (no C6F14 cooling system, no source test,
Setting up the Ricoh C305 Press F5 to start the Presentation
A rapidly developed control system for WITCH A. Lindroth, V. Kozlov.
NOvA APD Cooling Water Update William Gilbert University of Minnesota.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
Applied Systems News FWEC*A Rudolf BARET HEISSIG.
Hardware Training Product: ITMS2.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Never Thirsty DrinkMaster 8000 Stephan Zebrecky Daniel Hudepohl Brandon Davis Ryan Rhodes.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
FPix DCS Subgroup Report
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
ROD assembly and test in US
First Assembled Rod in US
Operations/Failure Analysis
Operations/Failure Analysis
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Claim filed with Fed-Exp for $480 to cover cost of Coolie Box rebuild Work on Temp/Humidity Probes 6ft Rack acquired for 18 months à ARC Power Supplies in rack Thermoelectric Element ordered ($400) Reverse Engineering Coolie Relay board

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Testing of damaged Coolie Box à power-up looks normal à no RS232 response on power up High Current Connectors Here

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Equipment Rack NIM Crate ARC P/S ARC Controllers Collie Controller ARC P/S Peltier P/S Relay Interface N2/Water Manafold

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs NIM Crate (pulse gen, nim-ttl-nim, or) Water manafold design (1L/m) à closed loop with chilled water (400w) Nitrogen manifold design (.02L/m & 0.2L/m) à dry air or Nitrogen? If N then bottles or gen?

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs Dedicated PC setup with; bar code reader, serial port, 2 PCI slots for Aachen modules New Coolie Box back panel à damaged panel à new connectors Plumbing (air+water) design à ASC Rep contacted to visit UCSB re valves

Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Complete Tests on Coolie Box and order a 2nd if required à Install new power transformer if unit is ok Communicate with Digital Temperature Sensors Design Temp Sensor PC Card Install LabView on PC and test CERN code Design Solenoid valve Interface