Introduction RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager.

Slides:



Advertisements
Similar presentations
Pacific Team TEAM INTRODUCTION Pacific 2001 Crystal LangARCHITECT Robert WrightENGINEER Edgar LeenenCONSTRUCTION MANAGER Will Clift APPRENTICE Robert.
Advertisements

BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Express Team University of New Mexico February 24, 2006.
Architect: Greg Miller, Georgia Tech Engineer: Stratton Newbert, Stanford Construction: Lori Huneryager, Stanford Apprentice: Forest Flager, Stanford Owner:
Mountain Ridge Project - final presentation - AEC The making of Ridge University Engineering Building E ngineerMartha DelCampo, Stanford A rchitectKatrin.
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
CENTRAL UNIVERISTY ARCHITECTUREJoy Liu, Cal-Berkeley ENGINEERINGNorm Faris, Stanford CONSTRUCTIONTim Kolaya, Georgia Tech OWNERAlex Barron, Stanford Engineering.
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Pacific University Architecture Katie Kozarek EngineeringChristian Heimple ConstructionDebbie Sit ApprenticeChristina Cho OwnerPeter Demian School of Engineering.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Kitty Chan UC Berkeley architect Chad S. Green Stanford University Yuning Wang Stanford University engineer contractor owner Robert Alvarado Mission:
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Hunter Woron Spring 2012 Structural Professor Parfitt.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
CONDOMINIUM TOWER & PARKING
Multistory Office Building
Advisor: Professor M. Kevin Parfitt
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mississippi Riverbank Project (Final Presentation) May 14, 1999
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Presentation transcript:

Introduction RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN Stanford University Owner

LOCATION: Sacramento, CA, USA

Parking Lot Levies Pedestrian Bridge Forever Road Campus Drive To Campus NORTH

Winter Proposal: Square Base Slender Roof Framing Traditional Framing System “Table Top” Stable Platform Concept: Golden Section Rotating Squares Defies Gravity Structural and Construction Feasibility Cost: Year 2015

Winter Proposal: Double Square Base Structural and Construction Feasibility Concept: Golden Section Rotating Squares Defies Gravity Cast-in-Place Frame 10” Shear Wall 12” x 12” Columns 10” Inclined Slab in Auditorium Cost: Year 2015

Design Matrix SQUARE BASE DESIGN Strong concept and space planning well integrated with the structural system. Looks complicated but can be build with current equipments and tools.

Unconventional design approach - Building on piers to minimize hydraulic impact. - Flexible floor space. Design Approach To create an innovative building and environment that nurtures the minds and spirits Extending artificial outdoors. Sustainable design.

Design Approach A suspended glass building that defies gravity.

Design Concept Using the Golden Section and Rotating Squares to create innovative spaces and environment Golden Section Rotating Squares

First Floor Plan ADMINISTRATION FACULTY LOUNGE FACULTY MEN EXPOSED CORRIDOR OPTIMIZING RIVER VIEW WOMEN TERRACE ISOMETRIC PLAN NORTH

AUDITORIUM SMALL CLASSROOM LARGE CLASSROOM SMALL CLASSROOM ENTRY LOBBY ENTRY PREFUNCTION ENGINEER’S CORNER DOUBLE-STORY LOBBY/PREFUNCTION v MAIN ENTRANCE MENWOMEN ISOMETRIC PLAN LARGE CLASSROOM NORTH Second Floor Plan SMALL CLASSROOM SMALL CLASSROOM

Third Floor Plan v NORTH ISOMETRIC PLAN OPTIMIZE VIEW AND EASTERN/SOUTHERN SOLAR EXPOSURE MAXIMIZE SOLAR PENETRATION AUDITORIUM STUDENTS’ OFFICE STUDENTS’ OFFICE INSTRUCTIONAL LAB INSTRUCTIONAL LAB EAST TERRACE SEM1 SEM2 SEM3 SEM4 STUDENTS’ OFFICE COMP MACH ROOM TECH STORE TERRACE SOUTH TERRACE MENWOMEN

Solar Study Equinox at 21 Mac/ September 9 am3 pm 12 noon Continuous day lighting area and sun angles during Equinox and Solstice Sacramento, Latitude at 38.5 degree.

Building Efficiency Compact space planning in exchange for external artificial extension Internal building efficiency: 66% Total building efficiency: 71%

Live Loads Terrace, Interior Atrium – 100 psf Corridors, Computer Lab – 100 psf Auditorium, Classrooms & Offices – 50 psf Roof – 20 psf Dead Loads Cast-in-Place Concrete – 150 lb/ft 3 Steel Construction – 60 psf Flooring, ceiling, lights – 15 psf HVAC – 5 psf Partitions – 20 psf Exterior Cladding – 30 psf Structural Constraints – Gravity Loads

Structural Constraints – Lateral Loads Seismic Constraints Moderate seismic activity; Zone 3 Occupancy category, I = 1.0 Sandy soil with subsurface rock Wind Constraints Design wind speed, V 45 = 90 mph Flood Constraints 100 year flood

Gravity System Exterior Walls Code Check Main Truss Main Gravity Elements

Cantilever System Self Balancing Cantilever Assembly Sequence

Structural Bay System 2 nd Level 20’ 25’ 1 st Level Architectural Overlay 3 rd Level Roof Level

Bay Components W12X26 W10X26 W18X55 37’-0” 25’-0” Modular Construction Composite Action Chafer

Lateral System V=C s V C s = < 1.2A v S RT 2/3 2.5A a R Maximum Base Shear 482 kips Shear Stresses 2 nd Level 3 rd Level Core

Pile Cap / Pile Array 10” Diameter typical Rebar: 5 #5 bars w/ #3 ties Drilled Pier Array 10” Diameter typical CIP Transition Piece to Shear Wall Foundation Isometric Foundations

Truss to Pier Detail Pier Detail Plan View Elevation View Bearing Plate Connection

Front Elevation 20’ Elevation Views 25’ Side Elevation

Dynamic Analysis Mode 1 Mode 2 Mode 3 Mode 1 Mode 2 Mode 3.79” 1. 32”.98”

Site (facing west) Construction

Site Layout Trailers Material Laydown C Const. Access Road Parking Lot Levies N Pedestrian Bridge Forever Road Campus Drive To Campus Crane American River

210 ton Hydraulic Crawler Crane –Lift 9 ton 120’ from crane Loader/Excavator Concrete Boom Truck Pile Driver Manlift Equipment

Estimate $3.90 mil ($130.02/sf) in 2001 $US Last quarter est. = 3.62 mil. Budget = $3.89 mil (using 2.5% rate)

Implementation Schedule 3 rd floor computer labs complete May 1st Aug 29, 2016 Project Complete Dec 21, 2015 Dec 7, 2015

3 rd Floor HVAC 2 nd Floor 1 st Floor Centralized Ventilation and Cooling on 3 rd floor –2- Trane 12.5 ton Voyager Packaged Cooling with Electric Heat Rooftop Units Centralized (radiant) heating throughout Individual Perimeter AC units on 1 st and 2 nd floors –Trane UV-D8-1 Classroom Air Conditioners

Construction Sequence

Upgrade Options Aesthetic Improvement: Upgrade interior finish in 2 nd and 3 rd floor circulation areas –California Gold Slate tiles- $7/sf –Add $44,800 (6400 sf) Reduce Life-Cycle Costs: –PV cells on roof and solar electric generator –Initial Cost: $5/watt ($1.8m, $60,000/year over 30-year period) –Life-Cycle Savings on Power: $15/watt (over 30 yrs) –Total Savings: $3.6 million for 12kW Building

Team Interaction: Winter vs Spring Winter Quarter (Schematic Design Phase) o Group Interaction o Synchronous Emphasized o Multiple Iteration o Very Loose

Team Interaction: Winter vs Spring Spring Quarter (Construction Document Phase) o Mentor interactions o Asynchronous professional work o Multiple synchronous integration o Professional design development

AEC Interaction - Framing Architectural Schematics is completed Budget way too high! Can we move to a steel frame? Steel framing is good - I need to reorganize the bay system I have to adjust the 1 st Floor plan to suit the new bay system. I want to erect the steel members before placing the decking. I am concerned about deflection caused by your proposed sequence.

AEC Interaction - HVAC Owner concerned about MEP options Develop MEP requirements Investigate current restrictions Present problem to team A – Sustainable design can decrease demand E – External ducting allow for flexibility C – Radiant heat can increase interstitial space Owner still smiling

Conclusions and Recommendations Lessons learned: Better and faster decisions can be made during Schematic Design Phase using AEC Integration method. Technology can be a powerful tool… when it works. How it can be improved: Critical that A-E-C students be exposed to collaborative tools and methods during their tertiary education. Future prospect: Collaborative design-build has tremendous potential, but limited now by design accountability. A-E-C Integration

The River2001 Team would like to acknowledge the following persons for their direct and indirect contributions throughout our discovery journey. RENATE FRUCHTER, Stanford Univesity ROXANNE ZOLIN, Stanford University ROBERT ALVARADO, CM Salter Architect SCOTT DENNIS, MBT Architect ERIC HORN, Webcor Builders BOYD PAULSON, Stanford University BOB TATUM, Stanford University KIM RODDIS, Kansas University RYAN STRAUPE, Pacific Energy Center, PG & E Staff of CIFE, and our fellow friends and colleagues. Acknowledgements